The Collier Report of U.S. Government Contracting

Old School Reporting Using Modern Technology

Zumwalt Construction Inc

  • Contact Person: Kurt Zumwalt
  • Contact Phone: 559-252-1000
  • Contact Email: kzumwalt@zumwaltconst.com
  • Business Structure:
  • Corporate Entity (Not Tax Exempt)
  • Business Type:
  • For Profit Organization
  • Subchapter S Corporation
  • Industries Served: Industrial Building Construction, Commercial and Institutional Building Construction, Water and Sewer Line and Related Structures Construction, Power and Communication Line and Related Structures Construction, Poured Concrete Foundation and Structure Contractors, All Other Specialty Trade Contractors
  • Product Areas: PURCHASE OF PARKING FACILITIES

Sampling of Federal Government Funding Actions/Set Asides

In order by amount of set aside monies.

  • $771 - Thursday the 9th of February 2012
    Agricultural Research Service
    USDA ARS PWA 95CV
    PROVIDE ELECTRICAL RECEPTACLES IN LIEU OF GOV'T PROVIDED, INCORRECT TYPE RECEPTACLES, FOR LIGHT FIXTURE HANGING ON INSECTARY GREENHOUSE
  • $619,028 - Friday the 10th of July 2015
    Department Of Army
    W075 ENDIST SACRAMENTO
    88TH RSC ARIM ,US ARMY RESERVE CENTER, ECS BIOMEDICAL MAINTENANCE FACILITY BUILDING 11C-BAY 7 IS AN ACTIVE MILITARY INSTALLATION LOCATED AT 968 W. 400 N, OGDEN, UT 84404 AT FORMER OGDEN DEFENSE DEPOT, UTAH. GOVERNMENT WILL PROVIDE CONTRACTOR WITH A 35% DESIGN REVIEW OF PROJECT DRAWINGS AND THIS SOW. THE GOAL OF THIS PROJECT IS TO HAVE CONTRACTOR PREPARE AND DELIVER A GOVERNMENT APPROVED 100% FINAL FOR CONSTRUCTION DESIGN AND CONSTRUCT DRAWINGS AND SPECIFICATIONS ASSOCIATED WITH THE DESIGN&CONSTRUCTION OF IMPROVEMENTS TO THE ECS BIOMEDICAL MAINTENANCE FACILITY BUILDING 11C-BAY 7 AT THE 88TH RSC ARIM ,US ARMY RESERVE CENTER, AT OGDEN UTAH; IMPROVEMENTS SHALL INCLUDE THE DEMOLITION AND REMOVAL OF EXISTING BATHROOM; DEMOLITION OF AN INDOOR MODULAR OFFICE STRUCTURE 12 X 24 X 8 -2 , DEMOLITION OF EXISTING INDOOR BIO-MED MODULAR OFFICE, DEMOLITION OF PORTIONS OF CONCRETE SAFETY WALLS AT NOTED LOCATIONS, REMOVE FURRING OF WALLS IN FRONT OF AN SLIDING DOOR, AND DEMOLITION OF ALL OTHER ASSOCIATED WORK INCLUDING ELECTRICAL AND MECHANICAL WORK ITEMS AS REQUIRED. NEW WORK INCLUDES NEW BATHROOM AND OFFICES, INSTALL PERSONNEL DOORS AND EMERGENCY EYEWASH AND SHOWER, OTHER WORK SHALL INCLUDE NEW ELECTRICAL AND MECHANICAL WORK. SEE MECHANICAL AND ELECTRICAL DRAWINGS FOR OTHER INFORMATION. SEE DRAWING AD101 FOR DEMOLITION ITEMS AND DRAWING A-101 FOR NEW FLOOR PLAN ITEMS.
  • $1,592,927 - Saturday the 29th of September 2012
    Department Of Army
    W075 ENDIST SACRAMENTO
    FIRE PROTECTION (FIRE ALARMS, FIRE SUPPRESSION, POWER UPGRADES) IN VARIOUS BUILDINGS, DUGWAY PROVING GROUNDS, UTAH
  • $1,506 - Thursday the 26th of January 2012
    Agricultural Research Service
    USDA ARS PWA 95CV
    PROVIDE PROPER BREAKER SWITCH, CHANGING FROM 30 AMP DISCCONECT SWITCH TO 60 AMP DISCONNECT SWITCH.

© Copyright 2019
The Collier Report
published by 1918 Media LLC.
Information displayed in this dossier has been provided through available open source or public sources. No reliance should be made by readers or Collier Report subscribers. Funding actions are complicated and do not always represent dollar-for-dollar payments to vendors nor do they represent payments in certain instances. Requests for the modification of displayed information may be made to help.desk@1918.media.