The Collier Report of U.S. Government Contracting

Old School Reporting Using Modern Technology

Zachry Construction Corporation

  • Zachry Construction Corporation

  • View government funding actions
  • San Antonio, TX 782473624
  • Phone: 210-871-2765
  • Estimated Number of Employees: 952
  • Estimated Annual Receipts: $369,036,000
  • Business Start Date: 2007
  • Contact Person: Jean Abiassi
  • Contact Phone: 210-871-2788
  • Contact Email: JEAN.ABIASSI@ZACHRYCORP.COM
  • Business Structure:
  • Corporate Entity (Not Tax Exempt)
  • Business Type:
  • For Profit Organization
  • Industries Served: Commercial and Institutional Building Construction, Highway, Street, and Bridge Construction, Other Heavy and Civil Engineering Construction, Site Preparation Contractors
  • Product Areas: NATURAL RESOURCES/CONSERVATION- TREE THINNING, TREE THINNING SERVICES, HOUSEKEEPING- LANDSCAPING/GROUNDSKEEPING, LANDSCAPING/GROUNDSKEEPING SERVICES

Sampling of Federal Government Funding Actions/Set Asides

In order by amount of set aside monies.

  • $316,360 - Tuesday the 18th of October 2011
    Department Of Army
    W076 ENDIST FT WORTH
    TAS::96 3134::TAS ARRA::YES::PROJECTNUMBER::16100::RP# MJ016 54" SS SIPHON DAMAGE/REPAIR.EMERGENCY REPAIR OF THE DAMAGED EXISTING 54" SANITARY SEWER SIPHON LINE. ML030 THEO BRIDGE COLUMN PATCH A. PROVIDE A FINISH SURFACE FOR THEO STREET COLUMNS USING VERTICOAT, MANUFACTURED BY EUCLID CONCRETE REPAIR PRODUCTS (OR ENGINEER APPROVED EQUAL), IN STRICT ACCORDANCE WITH MANUFACTURER'S DIRECTIONS. ML034 SPREAD HAY THROUGHOUT PROJECT 1.TRAVEL TO 5101 BERGER RD, TEMPLE TEXAS, APPROXIMATELY 280 MILES ROUND TRIP, USING A MINIMUM OF A 40' TRAILER TO PICK UP 15 BAILS OFROUND HAY,RETURN,SPREAD THROUGHOUT PROJECT. ML037 CONSTRUCT TWO BENCH PADS CONSTRUCT TWO EACH 8'X 12'X 6" BENCH PADS. ML039 MISCELLANEOUS CHANGES 1.OVER RUN OF 2497 CYS EMBANKMENT QUANTITIES. 2.GROUT IN BLOCK OUT AND CUT OUT NEW AREA FOR 24" RCP AT OUTFALL 2.1 3.GROUT IN BLOCK OUT AND CUT OUT NEW AREA FOR 48" RCP AT OUT FALL 2.3 4.EXTEND APRON BY 15'X 15' X 8" WITH 30" TOE DOWN AT OUTFALL 2.12. 5.ADD TWO 3' X 3' X 6" ADA PADS AT THE TWO QUATREFOIL AREAS. 6.GROUT IN BLOCK OUT AND CUT OUT NEW AREA FOR 24" RCP AT OUTFALL 2.16. 7.GROUT IN BLOCK OUT AND CUT OUT NEW AREA FOR 24" RCP AT OUTFALL 2.13. 8.ADD COLORED CONCRETE WITH ROCK SALT FINISH BETWEEN THE TRAIL AND WING WALLS AT THE FOUR CORNERS OF THE PEDESTRIAN BRIDGE. NORTHEAST CORNER: 7'.5" X 7' X 6". NORTHWEST CORNER: 8' X 8' X6". SOUTHEAST CORNER: 7' 5" X 7' 5" X 6". SOUTHWEST CORNER 12' X 5' X 6'. 9.GROUT IN BLOCK OUT AND CUT OUT NEW AREA FOR 24" RCP AT OUTFALL 2.20. 10.GROUT IN BLOCK OUT AND CUT OUT NEW AREA FOR 24" RCP AT OUTFALL 2.20A. 11.GROUT IN BLOCK OUT AND CUT OUT NEW AREA FOR 24" RCP AT OUTFALL 2.21 12. EXTEND APRON AT OUTFALL 2.18 BY 11' X 7' 8" WITH 30" TOE DOWN. ML042 FLOOD&STORM DAMAGE DEC 2010, MAY 2011 REPAIR AND RECONSTRUCTION OF DAMAGED WORK DUE TO FLOOD EVENT OF DECEMBER 24, 2010. WORK INCLUDES PERMANENT MAT, COMPOST APPLICATION, MYCHORRIZHAL FUNGAL AND HUMIC ACID APPLICATION, HYDRIC MIX APPLICATION, AND CROP COVER APPLICATION.
  • $101,493 - Tuesday the 18th of October 2011
    Department Of Army
    W076 ENDIST FT WORTH
    MJ016 54" SS SIPHON DAMAGE/REPAIR.1.) EMERGENCY REPAIR OF THE DAMAGED EXISTING 54" SANITARY SEWER SIPHON LINE. 2.) EMERGENCY REMEDIATION AND CONTAINMENT OF ANY HAZARDOUS EFFLUENT TO THE SURROUNDING ENVIRONMENT DUE THE LEAKED SEWAGE FROM THE DAMAGED 54" SANITARY SEWER SIPHON LINE. 3.) CONFIRM W/ ENVIRONMENTAL AUTHORITY HAVING JURISDICTION THE PROPER REMEDIATION AND CONTAINMENT PROCEDURES HAVE BEEN FOLLOWED BEFORE, DURING AND AFTER THE CLEANUP OPERATION(S). 4.) BACKFILL SOIL OF SAID AREA ACCORDING TO APPLICABLE GUIDELINES AND COMPACTION STANDARDS PER THE PROJECT SPECIFICATIONS.

© Copyright 2019
The Collier Report
published by 1918 Media LLC.
Information displayed in this dossier has been provided through available open source or public sources. No reliance should be made by readers or Collier Report subscribers. Funding actions are complicated and do not always represent dollar-for-dollar payments to vendors nor do they represent payments in certain instances. Requests for the modification of displayed information may be made to help.desk@1918.media.