The Collier Report of U.S. Government Contracting

Old School Reporting Using Modern Technology

Witherington Construction Corporation

  • Witherington Construction Corporation

  • View government funding actions
  • Mobile, AL 366095195
  • Phone:
  • Estimated Number of Employees: 14
  • Estimated Annual Receipts: $6,408,110
  • Business Start Date: 1976
  • Contact Person: Elinor Carter
  • Contact Phone: 251-633-8570
  • Contact Email: elinor@wccgc.com
  • Business Structure:
  • Corporate Entity (Not Tax Exempt)
  • Business Type:
  • For Profit Organization
  • Industries Served: Commercial and Institutional Building Construction, Poured Concrete Foundation and Structure Contractors, Framing Contractors, Masonry Contractors, Other Foundation, Structure, and Building Exterior Contractors, Electrical Contractors and Other Wiring Installation Contractors, Plumbing, Heating, and Air-Conditioning Contractors, Site Preparation Contractors
  • Product Areas: SERVICES (ENGINEERING), R&D- DEFENSE OTHER: SERVICES (ENGINEERING DEVELOPMENT), R&D- ENERGY: CONSERVATION (BASIC RESEARCH), CONSERVATION OF ENERGY (BASIC), OTHER ENERGY (BASIC), R&D- ENERGY: OTHER (BASIC RESEARCH), R&D- ENERGY: OTHER (ADVANCED DEVELOPMENT), OTHER ENERGY (ADVANCED), OTHER ENERGY (ENGINEERING), R&D- ENERGY: OTHER (ENGINEERING DEVELOPMENT), R&D- ENERGY: OTHER (OPERATIONAL SYSTEMS DEVELOPMENT), OTHER ENERGY (OPERATIONAL), ENGINEERING (ENGINEERING), R&D- GENERAL SCIENCE/TECHNOLOGY: ENGINEERING (ENGINEERING DEVELOPMENT), R&D- GENERAL SCIENCE/TECHNOLOGY: OTHER (ENGINEERING DEVELOPMENT), R&D-OTHER SCIENCES-ENG DEV, ARCHITECT AND ENGINEERING- CONSTRUCTION: ELECTRONIC AND COMMUNICATIONS FACILITIES, ARCHITECT AND ENGINEERING- CONSTRUCTION: EPG FACILITIES - GAS, ARCHITECT AND ENGINEERING- CONSTRUCTION: EPG FACILITIES - GEOTHERMAL, ARCHITECT AND ENGINEERING- CONSTRUCTION: EPG FACILITIES - SOLAR, ARCHITECT AND ENGINEERING- CONSTRUCTION: EPG FACILITIES - WIND, ARCHITECT AND ENGINEERING- GENERAL: ELECTRICAL SYSTEMS, QUALITY CONT SV/ENGINES & TURBINES, QUALITY CONTROL- ENGINES, TURBINES, AND COMPONENTS, QUALITY CONT SV/ELECT-ELCT EQ, QUALITY CONTROL- ELECTRICAL AND ELECTRONIC EQUIPMENT COMPONENTS, EQ TEST SVCS/ENGINES & TURBINES, EQUIPMENT AND MATERIALS TESTING- ENGINES, TURBINES, AND COMPONENTS, EQUIPMENT AND MATERIALS TESTING- ELECTRICAL AND ELECTRONIC EQUIPMENT COMPONENTS, EQ TEST SVCS/ELECT-ELCT EQUIP, EQ TEST SVCS/POWER DISTRIBUTION EQ, EQUIPMENT AND MATERIALS TESTING- ELECTRIC WIRE AND POWER DISTRIBUTION EQUIPMENT, OTHER QC/TEST/INSPECT- ELECTRICAL AND ELECTRONIC EQUIPMENT COMPONENTS, OTHER QC SVCS/ELECT-ELCT EQ, OTHER QC/TEST/INSPECT- ELECTRIC WIRE AND POWER DISTRIBUTION EQUIPMENT, OTHER QC SVCS/POWER DISTRIBUTION EQ, MAINT-REP OF ELECT-ELCT EQ, MAINT/REPAIR/REBUILD OF EQUIPMENT- ELECTRICAL AND ELECTRONIC EQUIPMENT COMPONENTS, MAINT-REP OF POWER DISTRIBUTION EQ, MAINT/REPAIR/REBUILD OF EQUIPMENT- ELECTRIC WIRE AND POWER DISTRIBUTION EQUIPMENT, MOD OF ELECT-ELCT EQ, MODIFICATION OF EQUIPMENT- ELECTRICAL AND ELECTRONIC EQUIPMENT COMPONENTS, MODIFICATION OF EQUIPMENT- ELECTRIC WIRE AND POWER DISTRIBUTION EQUIPMENT, MOD OF POWER DISTRIBUTION EQ

Sampling of Federal Government Funding Actions/Set Asides

In order by amount of set aside monies.

  • $9,783 - Tuesday the 10th of April 2012
    Public Buildings Service
    ACQUISITION DIVISION/SMALL PROJECTS
    THE PURPOSE OF THIS MODIFICATION IS FOR ADDITIONAL ITEMS TO REMOVE EXISTING ASBESTOS FLOOR TILE, MASTIC AND WOOD FLOORING IN BREAK/WORK ROOM #107 AS FOLLOWS: 1. REMOVE EXISTING CARPET. 2. REMOVE EXISTING ASBESTOS FLOOR TILE. 3. REMOVE EXISTING TILE MASTIC. 4. REMOVE EXISTING TOUGHED AND GROOVE WOOD FLOORING. 5. FURNISH AND INSTALL ARDEX 15 FLOOR LEVELING CONCRETE TO REPLACE WOOD FLOORING. 6. PERFORM AIR MONITORING AND CLEARANCE AS REQUIRED FOR ASBESTOS ABATEMENT. 7. COMPLETE ALL CONSTRUCTION REQUIREMENTS AS SPECIFIED IN CONTRACT.
  • $8,654 - Wednesday the 10th of April 2013
    Public Buildings Service
    ACQUISITION DIVISION/SMALL PROJECTS
    RENOVATE CLERK'S AREA, MOBILE, AL
  • $82,200 - Wednesday the 10th of April 2013
    Public Buildings Service
    ACQUISITION DIVISION/SMALL PROJECTS
    RENOVATE CLERK'S SPACES, ROBERTS BUILDING, MOBILE, AL
  • $660,533 - Thursday the 4th of April 2013
    Public Buildings Service
    ACQUISITION DIVISION/SMALL PROJECTS
    IGF::OT::IGF INTERIOR AND EXTERIOR WATERPROOFING REPAIRS, BIRMINGHAM, AL
  • $5,151 - Friday the 10th of August 2012
    Public Buildings Service
    ACQUISITION DIVISION/SMALL PROJECTS
    REVISE UNDERGROUND LOOP WIRING LOCATIONS SO ADT SCRAMBLE PADS WILL OPERATE SALLYPORT DOOR PROPERLY. WORK INCLUDES REMOVAL OF EXISTING LOOP WIRING&CAULKING, SAWCUTTING CONCRETE AT NEW LOOP WIRING LOCATIONS, INSTALLING NEW LOOP WIRING&CAULKING, AND CONNECTING NEW LOOP WIRING TO LOOP DETECTOR CONTROLS.
  • $48,742 - Friday the 10th of February 2012
    Public Buildings Service
    ACQUISITION DIVISION/SMALL PROJECTS
    THE PURPOSE OF THIS MODIFICATION IS TO PERFORM THE REQUIREMENTS OF THE FOLLOWING ADDITIVE CHANGE ORDER REQUEST: 1. CHANGE ORDER REQUEST DATED SEPTEMBER 16, 2011 - FURNISH AND INSTALL CONDUIT AND BACK BOXES AT THE COLUMN INSIDE THE VEHICLE SALLYPORT FOR AN ADT INTERCOM/DURESS AND A HIRSCH SCRAMBLE PAD, COST OF $2,940.00. 2. CHANGE ORDER REQUEST DATED JULY 28, 2011, REVISED OCTOBER 7, 2011 - FURNISH AND INSTALL A LOOP DETECTOR AND ASSOCIATED ELECTRICAL WORK IN THE VEHICLE SALLYPORT WHICH WAS OMITTED FROM THE CONSTRUCTION DOCUMENTS AND REQUIRED BY THE USMS DESIGN GUIDE, COST OF $8,164.00. 3. CHANGE ORDER REQUEST DATED OCTOBER 19, 2011 - FURNISH, INSTALL, AND TEST EMERGENCY POWER OVERLAY PANEL FOR ELEVATOR SEQUENCING OF THE PRISONER ELEVATOR. FURNISH AND INSTALL ASSOCIATED ELECTRICAL WORK. THIS WORK WAS OMITTED FROM THE CONSTRUCTION DOCUMENTS AND REQUIRED BY THE DID'S, COST OF $17,081.00. 4. CHANGE ORDER REQUEST DATED DECEMBER 12, 2011 - FURNISH AND INSTALL CONDUIT, BOXES, AND ASSOCIATED WORK AS INFRASTRUCTURE FOR ADT SECURITY WORK AND DEVICES IN THE BASEMENT, IN THE COMMAND AND CONTROL ROOM, IN THE 2ND AND 3RD FLOOR PRISONER ELEVATOR LOBBIES AND CORRIDORS, AND IN THE VEHICLE SALLYPORT, COST OF $20,557.00.
  • $392,291 - Monday the 1st of April 2013
    Public Buildings Service
    ACQUISITION DIVISION/SMALL PROJECTS
    THE DESIGN AND REPLACEMENT OF EXISTING GENERATOR,ELECTRICAL PANEL, AND ELECTRICAL TRANSFER SWITCH IN THE PENTHOUSE.THE LOCATION IS THE WILLIAM M. COLMER FB-CT, IN HATTIESBURG MS.
  • $2,705 - Thursday the 8th of December 2011
    Public Buildings Service
    ACQUISITION DIVISION/SMALL PROJECTS
    IN ACCORDANCE APPROVED CHANGE REQUEST DATED AUGUST 10, 2011 COMPLETE THE WIRING FOR THE CELL BLOCK DOOR CONTROLLER SYSTEM. THIS IS THE SECURITY SUBCONTRACTOR'S COST FOR RETURNING TO THE SITE SINCE THEY COMPLETED THEIR PORTION OF THE WORK SEVERAL MONTHS AGO AND ARE NO LONGER WORKING IN THE AREA. THIS CHANGE REQUEST INCLUDES THE GENERAL CONTRACTOR'S MARKUPS FOR THE SECURITY CONTRACTOR'S WORK.
  • $268,964 - Thursday the 4th of April 2013
    Public Buildings Service
    ACQUISITION DIVISION/SMALL PROJECTS
    IGF::OT::IGF ALTERNATE 1 WORK AWARDED, WATERPROOFING, BIRMINGHAM, AL.
  • $2,513 - Monday the 9th of July 2012
    Public Buildings Service
    ACQUISITION DIVISION/SMALL PROJECTS
    1. ADD DAMPERS TO TWO (2) HVAC CEILING VENTS IN COMPUTER ROOM. 2. ADD WOOD TRIM UNDER WINDOW IN JUDGE'S OFFICE TO COVER EXPOSED SCREWS. 3. REPLACE EXISTING RESTROOM SINK WITH GSA FURNISHED SINK. 4. INSTALL FLOOR MOUNTED DOOR STOPS, FIVE (5), EACH AT ALL DOORS. 5. ADD DATA DROP IN WORK ROOM, STUBBED ABOVE CEILING WITH PULL STRING. 6. FURNISH AND INSTALL FILTERS IN ADDITIONAL RETURN GRILLS.

© Copyright 2019
The Collier Report
published by 1918 Media LLC.
Information displayed in this dossier has been provided through available open source or public sources. No reliance should be made by readers or Collier Report subscribers. Funding actions are complicated and do not always represent dollar-for-dollar payments to vendors nor do they represent payments in certain instances. Requests for the modification of displayed information may be made to help.desk@1918.media.