Sampling of Federal Government Funding Actions/Set Asides

In order by amount of set aside monies.

  • $9,204 - Thursday the 3rd of November 2016
    Veterans Affairs Department
    247-NETWORK CONTRACT OFFICE 7
    IGF::CT::IGF SCHEMATIC STUDY
  • $6,618 - Tuesday the 31st of July 2012
    Veterans Affairs Department
    242-NETWORK CONTRACT OFFICE 02
    OTHER - SYRE COAXIAL CABLE REPLACEMENT A/E REQUIREMENT
  • $63,212 - Wednesday the 13th of January 2016
    Veterans Affairs Department
    642-PHILADELPHIA
    OTHER FUNCTIONS - A/E SERVICES
  • $50,027 - Friday the 10th of July 2015
    Veterans Affairs Department
    243-NETWORK CONTRACTING OFFICE 03
    DESCRIPTION: THIS PROJECT WILL EXPAND THE URGENT CARE AND OUTPATIENT SERVICES INTO AN ADDITION TO BUILDING 15 H AND THE RENOVATION OF THE GROUND FLOOR SPACE OF A PORTION OF BUILDING 15E. CONSTRUCTION OF THE NEW GROUND FLOOR EXPANSION TO THE EXISTING THREE STORY STRUCTURAL STEEL FRAME AND MASONRY EXTERIOR WALL BUILDING TERRACED WITHIN THE EXISTING HILLSIDE ADDING APPROXIMATELY 9,330 SQUARE FOOT OF NEW SPACE AND RENOVATION OF 7,835 SQ. FT OF ADJACENT GROUND FLOOR SPACE IN BUILDING 15E. WORK WILL INCLUDE STRUCTURAL STEEL, CONCRETE AND MASONRY, GLASS FA ADE ENTRANCE, ARCHITECTURAL, PLUMBING, ELECTRICAL, MECHANICAL, AND HVAC AS WELL AS ALTERATIONS OF EXISTING EXHAUST VENTS, DUCTS, PLUMBING, AND MISCELLANEOUS OTHER UTILITIES PENETRATING THE EXISTING BUILDINGS, FIRE ALARM AND FIRE SPRINKLER SYSTEM CONSTRUCTION AND TIE IN TO EXISTING BUILDING SYSTEMS ARE INCLUDED. OVERALL CONSTRUCTION WILL ALLOW THE ADDITION OF TWO FLOORS IN THE FUTURE. PRELIMINARY CONCEPT AND DESIGN PHASE SERVICES: THE DESIGN SHALL INCLUDE STRUCTURAL DESIGN TO ACCOMMODATE TWO ADDITIONAL FLOORS (ABOVE THE PROPOSED) FOR FUTURE EXPANSION. EXTERIOR WALLS WILL BE A COMBINATION OF A GLASS FA ADE, BRICK AND CONCRETE BLOCK TO MATCH THE EXISTING FACILITY. PERFORM COLLECTION OF AS-BUILT DRAWINGS AND VERIFY EXISTING CAPACITIES OF ALL UTILITIES AND DESIGN AND UPGRADE AS NECESSARY TO SUPPORT THE NEW AND FUTURE BUILDING EXPANSION AND RENOVATION. THE DESIGN SHALL INCLUDE SURVEY, TOPOGRAPHY, SUBSURFACE INVESTIGATION, BORINGS AND PREPARE EXISTING SITE PLAN DRAWING SHOWING IDENTIFIED UTILITIES (ELECTRIC, WATER, SANITARY, STEAM AND DRAINAGE) AND TEST BORING LOCATIONS. ALL TESTING OF SOIL REPORTS SHALL BE BY A CERTIFIED LABORATORY AND PROVIDE DATA FOR SEISMIC REQUIREMENTS. PREPARE PROPOSED SITE PLAN DRAWINGS WITH EXTERIOR SITE FEATURES. DRAWING S SHEET DIMENSION SHALL FOLLOW VA S 30 X40 AND AUTOCAD DRAFTING. PROVIDE COMPLETE BUILDING FOUNDATION AND ARCHITECTURAL DESIGN. DESIGN PLUMBING SYSTEMS TO INCLUDE WATER, SANITARY, ROOF STORM, FLOOR DRAINS AND BATHROOM FIXTURES. DESIGN AND PROVIDE CALCULATIONS FOR ELECTRICAL SYSTEM, TO INCLUDE LIGHTING AND POWER TO BUILDING AND MEDICAL EQUIPMENT AND LIGHTNING PROTECTION SYSTEM. DESIGN AND PROVIDE CALCULATIONS FOR MECHANICAL AND HVAC SYSTEM. DESIGN FIRE PROTECTION SYSTEM TO INCLUDE FIRE SPRINKLERS, FIRE ALARM SYSTEMS AND CONNECT TO EXISTING FIRE ALARM CONTROL PANEL. PREPARATION OF THE DETAILED DESIGN DRAWINGS. PROVIDE DETAILED COST ESTIMATES FOR EACH DISCIPLINE (MECHANICAL, ELECTRICAL, PLUMBING, STRUCTURAL, ARCHITECTURAL, HVAC). PROVIDE CIH SERVICES FOR LEAD AND ASBESTOS TASKS 1 9. PROVIDE GENERAL AND EDITED TECHNICAL SPECIFICATION DOCUMENTS IN ACCORDANCE WITH VA FORMAT AND REQUIREMENTS FOR VA REVIEW AND COMMENT. EACH SUBMISSION SHALL INCLUDE THE REQUIRED DELIVERABLES OUTLINED IN THE SUPPLEMENT B TO THE SF 252. PROVIDE PRINTED PLANS FOR VA REVIEW AND COMMENT PER SUBMISSION. CONTRACT DOCUMENTS PREPARED ELECTRONICALLY (PDF , WORD AND AUTOCAD FORMATS) AND HARDCOPY SETS. PROVIDE ALL SITE VISITS FOR PRELIMINARY INVESTIGATION AND DESIGN, ATTEND PRE-BID WALK THROUGH AND ANSWER QUESTIONS FROM PROSPECTIVE BIDDERS ABOUT THE PROJECT DESIGN. CONSTRUCTION PHASE SERVICES (INCLUDING BUT NOT LIMITED TO): ASSIST IN THE DEVELOPMENT OF SHOP DRAWINGS, AND REVIEW SUBMITTALS FOR ACCEPTANCE. ANSWER QUESTIONS AND RFI S ABOUT THE PROJECT DESIGN. CONDUCT PERIODIC INSPECTION SERVICE. THESE SITE VISITS ALSO INCLUDE A PRE-CONSTRUCTION CONFERENCE, INTERMEDIATE, STARTUP AND A FINAL INSPECTION VISIT. THE A/E WILL SUBMIT A SURVEY REPORT SUMMARIZING THE CONDITIONS FOUND AT THE CONSTRUCTION SITE AS A RESULT OF THE SITE VISIT REVIEW CHANGE ORDERS AND PROVIDE DETAILED ITEMIZED COST ESTIMATES FOR SAME PERFORM PUNCH LIST FOR PROJECT CLOSE OUT PREPARE AND PROVIDE ORIGINALS (MYLAR AND ELECTRONICALLY CD IN AUTOCAD) AND COPIES OF AS-BUILT DRAWINGS ON AUTOCAD FROM MARKED-UP SET PROVIDED BY CONTRACTOR.
  • $304,084 - Thursday the 3rd of November 2016
    Veterans Affairs Department
    247-NETWORK CONTRACT OFFICE 7
    OPEN ENDED IDIQ AT THE RALPH H. JOHNSON VAMC, CHARLESTON, SC
  • $247,406 - Thursday the 3rd of November 2016
    Veterans Affairs Department
    247-NETWORK CONTRACT OFFICE 7
    IGF::CT::IGF OPEN ENDED IDIQ AT THE RALPH H. JOHNSON VAMC, CHARLESTON, SC
  • $21,600 - Thursday the 3rd of November 2016
    Veterans Affairs Department
    247-NETWORK CONTRACT OFFICE 7
    IGF::CT::IGF OPEN ENDED IDIQ AT THE RALPH H. JOHNSON VAMC, CHARLESTON, SC
  • $182,280 - Thursday the 3rd of November 2016
    Veterans Affairs Department
    247-NETWORK CONTRACT OFFICE 7
    IGF::CT::IGF OPEN ENDED IDIQ AT THE RALPH H. JOHNSON VAMC, CHARLESTON, SC

© Copyright 2019
The Collier Report
published by 1918 Media LLC.
Information displayed in this dossier has been provided through available open source or public sources. No reliance should be made by readers or Collier Report subscribers. Funding actions are complicated and do not always represent dollar-for-dollar payments to vendors nor do they represent payments in certain instances. Requests for the modification of displayed information may be made to help.desk@1918.media.