The Collier Report of U.S. Government Contracting

Old School Reporting Using Modern Technology

West Virginia Steel Corporation

  • West Virginia Steel Corporation

  • View government funding actions
  • Poca, WV 251599410
  • Phone: 304-541-6197
  • Estimated Number of Employees: 100
  • Estimated Annual Receipts: $10,000,000
  • Business Start Date: 1934
  • Contact Person: Tammy Slate
  • Contact Phone: 304-755-5638
  • Contact Email: tslate@raleighmine.com
  • Business Structure:
  • Corporate Entity (Tax Exempt)
  • Business Type:
  • For Profit Organization
  • Manufacturer of Goods
  • Industries Served: Bituminous Coal and Lignite Surface Mining, Bituminous Coal Underground Mining, Anthracite Mining, Support Activities for Coal Mining, Industrial Building Construction, Commercial and Institutional Building Construction, Oil and Gas Pipeline and Related Structures Construction, Power and Communication Line and Related Structures Construction, Structural Steel and Precast Concrete Contractors, Iron and Steel Pipe and Tube Manufacturing from Purchased Steel, Rolled Steel Shape Manufacturing, Nonferrous Metal (except Copper and Aluminum) Rolling, Drawing, and Extruding, Fabricated Structural Metal Manufacturing, Ornamental and Architectural Metal Work Manufacturing, Machine Shops, Metal Heat Treating
  • Product Areas: STRUCTURAL SHAPES, NONFERROUS BASE METAL, STRUCTURAL SHAPES NONFERROUS METAL, WIND ENERGY (ENGINEERING), R&D- ENERGY: WIND (ENGINEERING DEVELOPMENT), R&D- MINING: SURFACE MINING EQUIPMENT (MANAGEMENT/SUPPORT), R&D-SURFACE MINING EQ-MGMT SUP, R&D- MINING: SUBSURFACE MINING METHODS (OPERATIONAL SYSTEMS DEVELOPMENT), R&D-SUBSURF MINING METHS-OPSY DEV, R&D- MINING: MINING RECLAMATION METHODS (MANAGEMENT/SUPPORT), R&D-MINING RECLAM METHS-MGMT SUP, MINING SAFETY (MANAGEMENT/SUPPORT), R&D- MINING: MINING SAFETY (MANAGEMENT/SUPPORT)

Sampling of Federal Government Funding Actions/Set Asides

In order by amount of set aside monies.

  • $7,884 - Thursday the 5th of April 2012
    Department Of Army
    W7N7 USPFO ACTIVITY WV ARNG
    FABRICATE CAT-WALK FOR 350KW GENERATOR.
  • $5,151 - Tuesday the 18th of September 2012
    Federal Prison System
    BIG SANDY, USP
    STEEL PIECES
  • $3,970 - Tuesday the 29th of May 2012
    Department Of Army
    W072 ENDIST HUNTINGTON
    FABRICATION OF 1- GRATE DOOR, 1- GRATE PANEL AND 1 JAMB ANGLE FOR THE WINFIELD LOCK AND DAM, WV.
  • $16,286 - Tuesday the 21st of February 2012
    Federal Prison System
    BIG SANDY, USP
    METAL (FABRICATION OF SHOWER DOORS)

© Copyright 2019
The Collier Report
published by 1918 Media LLC.
Information displayed in this dossier has been provided through available open source or public sources. No reliance should be made by readers or Collier Report subscribers. Funding actions are complicated and do not always represent dollar-for-dollar payments to vendors nor do they represent payments in certain instances. Requests for the modification of displayed information may be made to help.desk@1918.media.