The Collier Report of U.S. Government Contracting

Old School Reporting Using Modern Technology

Walsh'demaria Joint Venture V

  • Walsh'demaria Joint Venture V

  • View government funding actions
  • Chicago, IL 606073021
  • Phone: 312-563-5400
  • Estimated Number of Employees: 0
  • Estimated Annual Receipts: $0
  • Business Start Date: 2009
  • Contact Person: Angelo Trapani
  • Contact Phone: 312-563-5400
  • Contact Email: atrapani@walshgroup.com
  • Business Structure:
  • Other
  • Business Type:
  • For Profit Organization
  • Industries Served: Commercial and Institutional Building Construction, Highway, Street, and Bridge Construction
  • Product Areas: SPECIAL STUDIES/ANALYSIS- ACCOUNTING/FINANCIAL MANAGEMENT, STUDY/ACCOUNTING/FINANCIAL MGT, SUPPORT- PROFESSIONAL: PROGRAM MANAGEMENT/SUPPORT, PROGRAM MANAGEMENT/SUPPORT SERVICES, OTHER PROFESSIONAL SERVICES, SUPPORT- PROFESSIONAL: OTHER, SUPPORT- ADMINISTRATIVE:- PERSONAL PROPERTY MANAGEMENT, PERSONAL PROPERTY MANAGEMENT SERVIC, ACCOUNTING SERVICES, SUPPORT- MANAGEMENT: ACCOUNTING, SUPPORT- MANAGEMENT: AUDITING, AUDITING SERVICES, FINANCIAL SERVICES, SUPPORT- MANAGEMENT: FINANCIAL

Sampling of Federal Government Funding Actions/Set Asides

In order by amount of set aside monies.

  • $98,507 - Thursday the 6th of September 2012
    Veterans Affairs Department
    OFFICE OF CONSTRUCTION & FACILITIES MANAGEMENT
    THIS CHANGE IS A CUSTOMER REQUEST. THE MEDICAL CENTER HAS REQUESTED THAT CFM ENSURE THAT NOISE THAT WILL AFFECT OCCUPANTS OF ADJACENT BUILDINGS, BE MINIMIZED. BUILDING 4 IS SURROUNDED BY CONSTRUCTION, AS A PARKING GARAGE AND A POLYTRAUMA BUILDING WILL BE CONSTRUCTED ADJACENT TO BUILDING 4, INFLICTING A GREAT DEAL OF NOISE ON BUILDING 4. TO MITIGATE THE INCOMING NOISE, PLEXI-GLASS SHEETS WILL BE INSTALLED OVER THE WINDOWS.
  • $8,951 - Thursday the 6th of September 2012
    Veterans Affairs Department
    OFFICE OF CONSTRUCTION & FACILITIES MANAGEMENT
    IN REFERENCE TO RFI 00079, DRAWING CS1.2.1 SHOWS THE DEMOLITION OF THE GAS LINE TO BUILDING 4. NEW SITE UTILITY DRAWINGS DO NOT SHOW A GAS LINE TO BE RE-CONNECTED TO THIS BUILDING.
  • $84,000 - Monday the 3rd of December 2012
    Veterans Affairs Department
    OFFICE OF CONSTRUCTION & FACILITIES MANAGEMENT
    CRITICAL FUNCTION: TO ACCOUNT FOR THE REMOVAL OF ASBESTOS CONTAINING EXTERIOR PAINT ON BUILDING 48 PER ACUMEN REPORT DATED, APRIL 5, 2012. A PREVIOUS ASSESSMENT WAS CONDUCTED AUGUST 25-26, 2010 BY THE STATION THAT IDENTIFIED THIS MATERIAL AS POSITIVE, BUT WAS NEVER INCORPORATED INTO OUR PROJECT.
  • $825 - Thursday the 6th of September 2012
    Veterans Affairs Department
    OFFICE OF CONSTRUCTION & FACILITIES MANAGEMENT
    THIS IS A DESIGN OMISSION. ARCHITECTURAL SUPPLEMENTAL INSTRUCTION 2, DID NOT INCLUDE THE REQUIREMENT FOR THE CONTRACTOR TO INSTALL ARC FLASH INDICATORS, AT THE TRANSFORMER. HENCE, THE INSTALLATION OF ARC FLASH INDICATORS WAS NOT INCLUDED IN THE SCOPE OF WORK FOR SA-02. ARC FLASH INDICATORS ARE NECESSARY FOR THE VA PALO ALTO ELECTRICAL MAINTENANCE STAFF, AS WELL AS, THE AQUATIC CENTER'S ELECTRICAL CONTRACTOR, NUTTING, TO KNOW IF THERE HAS BEEN A FAULT ON THE CIRCUIT. THIS IS A SAFETY MEASURE FOR ELECTRICIANS WORKING ON THE TRANSFORMER AND A USEFUL TROUBLE SHOOTING DEVICE. CABLE FAULT INDICATORS ARE USED THROUGHOUT THE VA PALO ALTO MEDICAL CENTER CAMPUS.
  • $71,000 - Thursday the 6th of September 2012
    Veterans Affairs Department
    OFFICE OF CONSTRUCTION & FACILITIES MANAGEMENT
    DIFFERING SITE CONDITIONS. ADDITIONAL ASBESTOS CONTAINING MATERIALS WERE DISCOVERED DURING THE DEMOLITION WORK. THIS CO IS NECESSARY TO PROCEED WITH THE ABATEMENT OF ADDITIONAL ASBESTOS DISCOVERED DURING SOFT DEMOLITION IN BUILDING 2C AND OUTSIDE/UNDERGROUND OF B48. DEMOLITION WORK IS IN THE CRITICAL PATH OF THE PROJECT SCHEDULE AND MUST BE COMPLETED TO BEGIN WORK ON THE NEW BUILDING.
  • $61,000 - Thursday the 6th of September 2012
    Veterans Affairs Department
    OFFICE OF CONSTRUCTION & FACILITIES MANAGEMENT
    TO PROVIDE FOR THE REMOVAL OF ADDITIONAL ASBESTOS QUANTITIES IN BUILDING 2C DUE TO MISCOLLECTING OF DATA PRIOR TO BID TIME BY THE A/E'S INDUSTRIAL HYGENIST.
  • $60,792 - Sunday the 8th of July 2012
    Veterans Affairs Department
    OFFICE OF CONSTRUCTION & FACILITIES MANAGEMENT
    THE CURRENT ACCESS AND PATHWAY TO/FROM BUILDING 4 WILL BE CUT-OFF BY THE CONSTRUCTION SINCE IT IS LOCATED BETWEEN THE PARKING GARAGE AND THE POLYTRAUMA BUILDING. A SAFE PATHWAY NEEDS TO BE PROVIDED TO MAINTAIN BUILDING ACCESS. ORIGINAL CONTRACT DID NOT REQUIRE PROVISION FOR CONSTRUCTING THIS SIDEWALK OR THE PATHWAY TO THE BUILDING.
  • $6,000 - Thursday the 6th of September 2012
    Veterans Affairs Department
    OFFICE OF CONSTRUCTION & FACILITIES MANAGEMENT
    TRANSITE PANELS WERE DISCOVERED BEHIND THE FIRE EXTINGUISHER CABINETS AFTER INTERIOR DEMOLITION WORK HAS COMMENCED. ACM NEEDS TO BE ABATED IN ORDER TO PROCEED WITH THE STRUCTURAL DEMOLITION.
  • $6,000 - Thursday the 6th of September 2012
    Veterans Affairs Department
    OFFICE OF CONSTRUCTION & FACILITIES MANAGEMENT
    DEFINITIZE CO-01C B4 EMERGENCY EGRESS PATH.
  • $6,000 - Monday the 3rd of December 2012
    Veterans Affairs Department
    OFFICE OF CONSTRUCTION & FACILITIES MANAGEMENT
    CRITICAL FUNCTION: TO ALLOW FOR THE REMOVAL OF ADDITIONAL ASBESTOS CONFIRMED DURING A FOLLOWUP INSPECTION BY ACUMEN ON MARCH 27, 2012. ACUMEN CLAIMS TO NOT HAVE BEEN ABLE TO SAMPLE FOUND RESULTS DURING THE INITIAL REPORT BECUASE VA PERSONNEL PREVENTED THEM.

© Copyright 2019
The Collier Report
published by 1918 Media LLC.
Information displayed in this dossier has been provided through available open source or public sources. No reliance should be made by readers or Collier Report subscribers. Funding actions are complicated and do not always represent dollar-for-dollar payments to vendors nor do they represent payments in certain instances. Requests for the modification of displayed information may be made to help.desk@1918.media.