The Collier Report of U.S. Government Contracting

Old School Reporting Using Modern Technology

Wagman Heavy Civil Inc

  • Contact Person: Anthony Bednarik
  • Contact Phone: 717-767-8201
  • Contact Email: AWBEDNARIK@WAGMAN.COM
  • Business Structure:
  • Corporate Entity (Not Tax Exempt)
  • Business Type:
  • For Profit Organization
  • Subchapter S Corporation
  • Industries Served: Highway, Street, and Bridge Construction, Other Heavy and Civil Engineering Construction, Poured Concrete Foundation and Structure Contractors, Structural Steel and Precast Concrete Contractors, Other Foundation, Structure, and Building Exterior Contractors, Site Preparation Contractors
  • Product Areas: HEAT EXCHANGERS AND STEAM CONDENSERS, HEAT EXCHANGERS & STEAM CONDENSERS, PLUMBING FIXTURES AND ACCESSORIES, PIPE, TUBE AND RIGID TUBING, HOSE AND FLEXIBLE TUBING, FITTINGS - HOSE PIPE & TUBE, HOSE, PIPE, TUBE, LUBRICATION, AND RAILING FITTINGS, VALVES, POWERED, VALVES, NONPOWERED, HAND TOOLS, POWER DRIVEN, PACKING AND GASKET MATERIALS, STORAGE TANKS

Sampling of Federal Government Funding Actions/Set Asides

In order by amount of set aside monies.

  • $4,325,796 - Wednesday the 19th of December 2012
    Federal Highway Administration
    EASTERN FEDERAL LANDS HIGHWAY DIVISION
    IGF::OT::IGF RESTORATION AND STABILIZATION OF A LANDSLIDE ON US ROUTE 209 NEAR MP15 AS WELL AS BIKE TRAIL REALIGNMENT, RETAINING WALL CONSTRUCTION, FULL DEPTH PAVEMENT, GUARDRAIL REPLACEMENT, DRAINAGE IMPROVEMENTS, AND OTHER MISCELLANEOUS WORK.
  • $127,024 - Thursday the 13th of September 2012
    Federal Highway Administration
    EASTERN FEDERAL LANDS HIGHWAY DIVISION
    PRA-DEWA 14(13) ADD $127,024.31 ADD 36 CALENDAR DAYS TO CONTRACT TIME.
  • $117,500 - Monday the 3rd of June 2013
    Federal Highway Administration
    EASTERN FEDERAL LANDS HIGHWAY DIVISION
    PROJECTS: ERFO DEWA 14(15) AND ERFO DEWA 10(5), 113(2) ERFO DEWA 14(15) CONSISTS OF DETOURING TRAFFIC SAFELY FROM THE INTERSECTION OF U.S. ROUTE (RTE) 209 AND 739 TO NORTH OF THE BOROUGH OF MILFORD ON RTE 209/6. THE TEMPORARY DETOUR INCLUDES HARD CLOSURES AT THE FAILURE SIGHT WITH CONCRETE BARRIERS, SIGN, AND WARNING LIGHTS. THIS EMERGENCY DETOUR WILL REMAIN IN PLACE UNTIL PERMANENT LANDSLIDE REPAIRS ON U.S. RTE 209 CAN BE COMPLETED. ERFO DEWA 10(5), 113(2) CONSISTS OF EMERGENCY ROADWAY REPAIRS AT RTE 615 INTERSECTION AND OLD MINE ROAD. THE REPAIRS INCLUDE EXCAVATION OF THE ROADWAY INCLUDING SUB-GRADE AND RECONSTRUCTION OF EMBANKMENT AND ROADWAY AT WASHED OUT SECTIONS.

© Copyright 2019
The Collier Report
published by 1918 Media LLC.
Information displayed in this dossier has been provided through available open source or public sources. No reliance should be made by readers or Collier Report subscribers. Funding actions are complicated and do not always represent dollar-for-dollar payments to vendors nor do they represent payments in certain instances. Requests for the modification of displayed information may be made to help.desk@1918.media.