The Collier Report of U.S. Government Contracting

Old School Reporting Using Modern Technology

Valley Construction Co

  • Contact Person: Mallory Hoffmann
  • Contact Phone: 309-787-0292
  • Contact Email: mhoffmann@valleyconstruction.com
  • Business Structure:
  • Corporate Entity (Not Tax Exempt)
  • Business Type:
  • For Profit Organization
  • Subchapter S Corporation
  • Industries Served: Industrial Building Construction, Commercial and Institutional Building Construction, Water and Sewer Line and Related Structures Construction, Oil and Gas Pipeline and Related Structures Construction, Land Subdivision, Highway, Street, and Bridge Construction, Other Heavy and Civil Engineering Construction, Poured Concrete Foundation and Structure Contractors, Structural Steel and Precast Concrete Contractors, Masonry Contractors, Other Foundation, Structure, and Building Exterior Contractors, Plumbing, Heating, and Air-Conditioning Contractors, Flooring Contractors, Other Building Finishing Contractors, Site Preparation Contractors
  • Product Areas: MISCELLANEOUS CONSTRUCTION MATERIALS, MISC CONTRUCT MATERIALS, LAND TREATMENT PRACTICES, NATURAL RESOURCES/CONSERVATION- LAND TREATMENT PRACTICES, NATURAL RESOURCES/CONSERVATION- SITE PREPARATION, SITE PREPARATION, INSTALLATION OF EQUIPMENT- RAILWAY EQUIPMENT, INSTALL OF RAILWAY EQ, INSTALLATION OF EQUIPMENT- PREFABRICATED STRUCTURES AND SCAFFOLDING, INSTALL OF PREFAB STRUCTURES, INSTALL OF LUMBER & MILLWORK, INSTALLATION OF EQUIPMENT- LUMBER, MILLWORK, PLYWOOD, AND VENEER, INSTALL OF CONTRUCT MATERIAL, INSTALLATION OF EQUIPMENT- CONSTRUCTION AND BUILDING MATERIALS, SALVAGE- DEMOLITION OF BUILDINGS, DEMOLITION OF BUILDINGS, SALVAGE- OTHER, OTHER SALVAGE SERVICES, UTILITIES- GAS, GAS SERVICES, WATER SERVICES, UTILITIES- WATER, UTILITIES- OTHER, OTHER UTILITIES, CONSTRUCTION OF OFFICE BUILDINGS, CONSTRUCTION OF OTHER ADMINISTRATIVE FACILITIES AND SERVICE BUILDINGS, CONSTRUCTION OF AIRPORT RUNWAYS AND TAXIWAYS, CONSTRUCTION OF OTHER AIRFIELD STRUCTURES, CONSTRUCTION OF SCHOOLS, CONSTRUCTION OF OTHER EDUCATIONAL BUILDINGS, CONSTRUCTION OF HOSPITALS AND INFIRMARIES, CONSTRUCTION OF LABORATORIES AND CLINICS, CONSTRUCTION OF OTHER HOSPITAL BUILDINGS, CONSTRUCTION OF AMMUNITION FACILITIES, CONSTRUCTION OF MAINTENANCE BUILDINGS, CONSTRUCTION OF PRODUCTION BUILDINGS, CONSTRUCTION OF OTHER INDUSTRIAL BUILDINGS

Sampling of Federal Government Funding Actions/Set Asides

In order by amount of set aside monies.

  • $9,802 - Friday the 6th of April 2012
    Department Of Army
    W07V ENDIST ROCK ISLAND
    DAVENPORT FLOODWALL MODIFICATION REFERENCE NO. R00008 CA007 TO RELOCATE CAMERA POLE.
  • $8,574 - Friday the 20th of April 2012
    Department Of Army
    W07V ENDIST ROCK ISLAND
    FLOOD RISK MANAGEMENT PROJECT, REACH 1, WATER TREATMENT PLANT, MISSISSIPPI RIVER, DAVENPORT, IOWA. MODIFICATION FOR DIVING - MANHOLE #1D.
  • $6,950 - Monday the 30th of July 2012
    Department Of Army
    W07V ENDIST ROCK ISLAND
    CONTRACT FOR FLOOD RISK MANAGEMENT PROJECT, REACH 1, WATER TREATMENT PLANT, MISSISSIPPI RIVER, DAVENPORT, IA. THIS MODIFICATION INCREASES FUNDS FOR VARIATION IN ESTIMATED QUANTITY, BEDROCK EXCAVATION.
  • $6,862 - Tuesday the 31st of January 2012
    Department Of Army
    W07V ENDIST ROCK ISLAND
    CONTRACT FOR FLOOD RISK MANAGEMENT PROJECT, REACH 1, WATER TREATMENT PLANT, MISSISSIPPI RIVER, DAVENPORT, IA. MODIFICATION FOR WALL THIMBLES.
  • $6,196 - Thursday the 3rd of May 2012
    Department Of Army
    W07V ENDIST ROCK ISLAND
    CONTRACT FOR FLOOD RISK MANAGEMENT PROJECT, REACH 1, WATER TREATMENT PLANT, MISSISSIPPI RIVER, DAVENPORT, IA. THIS MODIFICATION INCREASES FUNDS FOR 6" WATERLINE - VALVE DELETE AND CASING AND WALL THIMBLE.
  • $5,206 - Tuesday the 27th of December 2011
    Department Of Army
    W07V ENDIST ROCK ISLAND
    FLOOD RISK MANAGEMENT PROJECT, REACH 1, WATER TREATMENT PLAN, MISSISSIPPI RIVER, DAVENPORT, IOWA. MODIFICATION TO CHANGE MANHOLE SIZE.
  • $5,077 - Saturday the 16th of June 2012
    Department Of Army
    W07V ENDIST ROCK ISLAND
    CONTRACT FOR FLOOD RISK MANAGEMENT PROJECT, REACH 1, WATER TREATMENT PLANT, MISSISSIPPI RIVER, DAVENPORT, IA. THIS MODIFICATION INCREASES FUNDS FOR SHEETPILE-WATERSTOP CONNECTION AND 6" WATERLINE-SHEETPILE PENETRATION.
  • $5,000 - Wednesday the 18th of April 2012
    Department Of Army
    W07V ENDIST ROCK ISLAND
    FLOOD RISK MANAGEMENT PROJECT, REACH I, WATER TREATMENT PLANT, MISSISSIPPI RIVER, DAVENPORT, IOWA. MODIFICATION FOR GOVERNMENT SEWER CONNECTION.
  • $4,702 - Wednesday the 29th of February 2012
    Department Of Army
    W07V ENDIST ROCK ISLAND
    FLOOD RISK MANAGEMENT PROJECT, REACH 1, WATER TREATMENT PLANT, MISSISSIPPI RIVER, DAVENPORT, IOWA. MODIFICATION FOR STORM SEWER C EXTENSION.
  • $43,710 - Tuesday the 28th of February 2012
    Department Of Army
    W07V ENDIST ROCK ISLAND
    FLOOD RISK MANAGEMENT PROJECT, REACH 1, WATER TREATMENT PLANT, MISSISSIPPI RIVER, DAVENPORT, IA. MODIFICATION FOR 16" WATER MAIN RELOCATION.

© Copyright 2019
The Collier Report
published by 1918 Media LLC.
Information displayed in this dossier has been provided through available open source or public sources. No reliance should be made by readers or Collier Report subscribers. Funding actions are complicated and do not always represent dollar-for-dollar payments to vendors nor do they represent payments in certain instances. Requests for the modification of displayed information may be made to help.desk@1918.media.