The Collier Report of U.S. Government Contracting

Old School Reporting Using Modern Technology

V Pavkov Contracting Co Inc dba Pavkov Contracting Company

  • V Pavkov Contracting Co Inc dba Pavkov Contracting Company

  • View government funding actions
  • Sumter, SC 291508054
  • Phone: 803-775-4119
  • Estimated Number of Employees: 5
  • Estimated Annual Receipts: $2,500,000
  • Business Start Date: 1994
  • Contact Person: Vince Pavkov
  • Contact Phone: 803-775-4119
  • Contact Email: vince@pavkovcontracting.com
  • Business Structure:
  • Corporate Entity (Not Tax Exempt)
  • Business Type:
  • For Profit Organization
  • Industries Served: Residential Remodelers, Industrial Building Construction, Water and Sewer Line and Related Structures Construction, Highway, Street, and Bridge Construction, Other Heavy and Civil Engineering Construction, Poured Concrete Foundation and Structure Contractors, Structural Steel and Precast Concrete Contractors, Framing Contractors, Masonry Contractors, Roofing Contractors, Other Foundation, Structure, and Building Exterior Contractors, Other Building Finishing Contractors, Site Preparation Contractors, Ice Manufacturing, Light Truck and Utility Vehicle Manufacturing, Truck, Utility Trailer, and RV (Recreational Vehicle) Rental and Leasing, Real Estate and Rental and Leasing
  • Product Areas: TECHNICAL REPRESENTATIVE- LIGHTING FIXTURES AND LAMPS, TECH REP SVCS/LIGHTING FIXTURES, INSTALL OF LIGHTING FIXTURES, INSTALLATION OF EQUIPMENT- LIGHTING FIXTURES AND LAMPS

Sampling of Federal Government Funding Actions/Set Asides

In order by amount of set aside monies.

  • $635,804 - Wednesday the 19th of December 2012
    Federal Highway Administration
    EASTERN FEDERAL LANDS HIGHWAY DIVISION
    IGF::OT::IGF PROJECT TN ERFO ACE CORD(1) THE PROJECT CONSISTS OF THE REPLACEMENT OF THE FLOOD DAMAGED CULVERT PIPE AND ROADWAY EMBANKMENT ON MARINA LANE AT THE NORTH ENTRANCE TO DEFEATED CREEK PARK, WITHIN THE U.S. ARMY CORPS OF ENGINEERS' (USACE) CORDELL HULL LAKE RECREATION AREA. THE WORK INCLUDES THE INSTALLATION OF A 10-FOOT BY 10-FOOT DOUBLE BARREL, REINFORCED CONCRETE BOX CULVERT WITH CONCRETE HEADWALLS AND WINGWALLS REINFORCED WITH A CELLULAR CONFINEMENT SYSTEM, EARTHWORK, AGGREGATE BASE, HOT ASPHALT CONCRETE PAVEMENT, RIPRAP PLACEMENT, AND OTHER MISCELLANEOUS WORK.
  • $544,250 - Wednesday the 19th of December 2012
    Federal Highway Administration
    EASTERN FEDERAL LANDS HIGHWAY DIVISION
    IGF::OT::IGF THE PROJECT CONSISTS OF THE REHABILITATION OF THE BEACH ROAD BRIDGE OVER SHEEPSHEAD CREEK WITHIN THE ASSATEAGUE ISLAND NATIONAL SEASHORE. THE WORK INCLUDES REPAIRING THE CONCRETE BRIDGE DECK AND BRIDGE PILES, SEALING THE BRIDGE DECK, ENCAPSULATING THE BRIDGE PILES, AND OTHER MISCELLANEOUS WORK.
  • $364,118 - Wednesday the 19th of December 2012
    Federal Highway Administration
    EASTERN FEDERAL LANDS HIGHWAY DIVISION
    IGF::OT::IGF THE PROJECT CONSISTS OF THE REPAIR OF THE UPPER GLADE BRIDGE OVER GLADE CREEK. THE WORK INCLUDES THE CONSTRUCTION OF REINFORCED CONCRETE WINGWALLS, FOUNDATION REPAIRS, RIPRAP INSTALLATION, AND OTHER MISCELLANEOUS WORK.
  • $32,333 - Tuesday the 10th of January 2012
    US Coast Guard
    CEU PROVIDENCE
    400188 - RECONSTRUCT BOAT RAMP AT CG DET SANDY HOOK, HIGHLANDS, NJ PROJECT 400188
  • $294,234 - Wednesday the 19th of December 2012
    Federal Highway Administration
    EASTERN FEDERAL LANDS HIGHWAY DIVISION
    IGF::OT::IGF THE PROJECT CONSISTS OF THE REPLACEMENT OF THE FLOOD DAMAGED CULVERT PIPE AND ROADWAY EMBANKMENT ON NEVILLE BAY ROAD (ROUTE 214). THE WORK INCLUDES THE INSTALLATION OF A 10-FOOT BY 10-FOOT REINFORCED CONCRETE BOX CULVERT WITH EARTHWORK, AGGREGATE RESURFACING, RIPRAP, GUARDRAIL, AND OTHER MISCELLANEOUS WORK.
  • $2,910,710 - Wednesday the 19th of December 2012
    Federal Highway Administration
    EASTERN FEDERAL LANDS HIGHWAY DIVISION
    IGF::OT::IGF THE PROJECT CONSISTS OF THE RESTORATION AND STABILIZATION OF A LANDSLIDE ON U.S. ROUTE 209 AT MILEPOST 15.3, WITH BIKE TRAIL REALIGNMENT AND RETAINING WALL CONSTRUCTION. THE WORK INCLUDES ASPHALT PAVEMENT MILLING AND FULL-DEPTH PAVEMENT RECONSTRUCTION, STRUCTURAL CONCRETE, STRUCTURAL STEEL, DRILLED SHAFTS, GROUND ANCHORS, GUARDRAIL INSTALLATION, DRAINAGE IMPROVEMENTS, AND OTHER MISCELLANEOUS WORK.
  • $171,903 - Wednesday the 21st of March 2012
    US Coast Guard
    CEU MIAMI
    PROVIDE ALL LABOR, EQUIPMENT, TOOLS, AND MATERIALS TO CONSTRUCT UPPER RED LIGHT BEND INNER RANGE LIGHTS AND LOWER PEGGY'S LAKE OUTER RANGE LIGHTS IN BAYTOWN, TEXAS. ALL WORK SHALL BE PERFORMED IN STRICT ACCORDANCE WITH THE SPECIFICATIONS, DRAWINGS AND THE CONTRACT.

© Copyright 2019
The Collier Report
published by 1918 Media LLC.
Information displayed in this dossier has been provided through available open source or public sources. No reliance should be made by readers or Collier Report subscribers. Funding actions are complicated and do not always represent dollar-for-dollar payments to vendors nor do they represent payments in certain instances. Requests for the modification of displayed information may be made to help.desk@1918.media.