The Collier Report of U.S. Government Contracting

Old School Reporting Using Modern Technology

Urs Gei Joint Venture

  • Urs Gei Joint Venture

  • View government funding actions
  • Oakland, CA 946121924
  • Phone: 202-872-0277
  • Estimated Number of Employees: 36,000
  • Estimated Annual Receipts: $4,000,000,000
  • Business Start Date: 2009
  • Contact Person: Alyce Acosta
  • Contact Phone: 512-454-4797
  • Contact Email: AECOMELECTRONICBIZ@AECOM.COM
  • Business Structure:
  • Other
  • Business Type:
  • For Profit Organization
  • Limited Liability f
  • Industries Served: Nursery and Tree Production, Forest Nurseries and Gathering of Forest Products, Drilling Oil and Gas Wells, Support Activities for Oil and Gas Operations, Support Activities for Coal Mining, Support Activities for Metal Mining, Support Activities for Nonmetallic Minerals (except Fuels) Mining, Water Supply and Irrigation Systems, Sewage Treatment Facilities, Residential Remodelers, Industrial Building Construction, Commercial and Institutional Building Construction, Water and Sewer Line and Related Structures Construction, Oil and Gas Pipeline and Related Structures Construction, Power and Communication Line and Related Structures Construction, Land Subdivision, Construction
  • Product Areas: TACTICAL SETS, KITS, AND OUTFITS, SAFETY AND RESCUE EQUIPMENT, SETS KITS & OUTFITS OF HAND TOOLS, SETS, KITS, AND OUTFITS OF HAND TOOLS, SETS, KITS, AND OUTFITS OF MEASURING TOOLS, SETS, KITS & OUTFITS OF MEASURING T, HEADSETS, HANDSETS, MICROPHONES AND SPEAKERS, HEADSET,HANDSET,MICROPHONE & SPEAK, REPLENISHABLE FIELD MEDICAL SETS, KITS, AND OUTFITS, MEDICAL SETS KITS & OUTFITS, PHOTOGRAPHIC SUPPLIES, PHOTOGRAPHIC EQUIPMENT AND ACCESSORIES, PHOTOGRAPHIC EQ & ACCESSORIES, TRAINING AIDS, OFFICE SUPPLIES, PACKAGING & PACKING BULK MATERIALS, PACKAGING AND PACKING BULK MATERIALS, INDIVIDUAL EQUIPMENT, SPEC FLIGHT CLOTHING & ACCESSORIES, SPECIALIZED FLIGHT CLOTHING AND ACCESSORIES, MISCELLANEOUS ITEMS

Sampling of Federal Government Funding Actions/Set Asides

In order by amount of set aside monies.

  • $97,318 - Wednesday the 18th of January 2012
    Department Of Army
    W075 ENDIST SACRAMENTO
    PROJECT TITLE AND LOCATION: BLASTING CONSTRUCTION PHASE SERVICES SUPPORT FOR FOLSOM JFP AUXILIARY SPILLWAY CONTROL STRUCTURE, FOLSOM, CA; THE PURPOSE OF THIS MODIFICATION IS TO ADD A CLIN FOR ADDITIONAL BLASTING CONSULTATION.
  • $83,611 - Friday the 27th of January 2012
    Department Of Army
    W075 ENDIST SACRAMENTO
    PROJECT TITLE AND LOCATION: AMERICAN RIVER COMMON FEATURES (ARCF), GENERAL REEVALUATION REPORT (GRR), SACRAMENTO, CA (LOWER AMERICAN RIVER EROSION STUDY); THE PURPOSE OF THIS MODIFICATION IS TO EXERCISE OPTIONAL TASK 1.
  • $792,281 - Friday the 27th of July 2012
    Department Of Army
    W075 ENDIST SACRAMENTO
    PROJECT TITLE AND LOCATION: PERIODIC INSPECTION (PI) FOR THE KNIGHTS LANDING U2¿ YOLO BYPASS¿ SERVICE AREA 6 LEVEE SYSTEMS NEAR WOODLAND, CALIFORNIA. THE PURPOSE OF THIS MODIFICATION IS TO EXERCISE CONTRACT LINE ITEM NUMBERS (CLIN)S 0003, AND 0006 AND CHANGE THE PERIOD OF PERIOD OF PERFORMANCE FOR THESE CLINS.
  • $56,648 - Friday the 10th of July 2015
    Department Of Army
    W075 ENDIST SACRAMENTO
    SUCCESS DAM DAM SAFETY MOD PROGRAM-(PSHA/DSHA) TASKS 1 AND 2
  • $551,208 - Friday the 28th of September 2012
    Department Of Army
    W075 ENDIST SACRAMENTO
    TASK ORDER PROJECT TITLE AND LOCATION: PERIODIC INSPECTION (PI) FOR RD0010 HONCUT DRAINAGE BASIN LEVEE SYSTEMS NEAR MARYSVILLE, CALIFORNIA BASE TASKS 1 THRU 10 WITH (3) OPT TASKS EXERCISED CONCURRENTLY. OPT. TASK 4 NOT EXERCISED.
  • $493,270 - Thursday the 20th of September 2012
    Department Of Army
    W075 ENDIST SACRAMENTO
    PROJECT TITLE AND LOCATION: PERIODIC INSPECTION (PI) FOR THE KNIGHTS LANDING U2¿ YOLO BYPASS¿ SERVICE AREA 6 LEVEE SYSTEMS NEAR WOODLAND, CALIFORNIA. THE PURPOSE OF THIS MODIFICATION IS TO EXERCISE CONTRACT LINE ITEM NUMBERS (CLIN) 0002, AND CHANGE THE PERIOD OF PERIOD OF PERFORMANCE FOR THIS CLIN.
  • $44,286 - Wednesday the 30th of November 2011
    Department Of Army
    W075 ENDIST SACRAMENTO
    PROJECT TITLE AND LOCATION: WELDING QA SUPPORT¿ CONSTRUCTION PHASE SERVICES FOR FOLSOM DAM AUXILIARY SPILLWAY CONTROL STRUCTURE, FOLSOM, CA; THE PURPOSE OF THIS MODIFICATION IS TO EXERCISE OPTIONAL TASK 1.
  • $31,100 - Wednesday the 2nd of May 2012
    Department Of Army
    W075 ENDIST SACRAMENTO
    MOD 04 - TASK 15; APPROACH CHANNEL COFFERDAM DESIGN, FOLSOM DAM JOINT FEDERAL PROJECT, FOLSOM DAM, CA
  • $2,391,779 - Tuesday the 7th of February 2012
    Department Of Army
    W075 ENDIST SACRAMENTO
    ADD CLIN 0004, MOD 03 - TASKS 9 THRU 14, ADDITIONAL APPROACH CHANNEL DESIGN.
  • $211,697 - Wednesday the 19th of September 2012
    Department Of Army
    W075 ENDIST SACRAMENTO
    TASKS 9: REVISIONS: PROJECT TITLE AND LOCATION: APPROACH CHANNEL WALLS&SLAB DESIGN, FOLSOM DAM JOINT FEDERAL PROJECT, FOLSOM DAM, CA

© Copyright 2019
The Collier Report
published by 1918 Media LLC.
Information displayed in this dossier has been provided through available open source or public sources. No reliance should be made by readers or Collier Report subscribers. Funding actions are complicated and do not always represent dollar-for-dollar payments to vendors nor do they represent payments in certain instances. Requests for the modification of displayed information may be made to help.desk@1918.media.