The Collier Report of U.S. Government Contracting

Old School Reporting Using Modern Technology

Tecta America Corp dba Tecta America

  • Contact Person: James Phillips
  • Contact Phone: 410-905-3669
  • Contact Email: jphillips@tectaamerica.com
  • Business Structure:
  • Corporate Entity (Not Tax Exempt)
  • Business Type:
  • For Profit Organization
  • Industries Served: Solar Electric Power Generation, Commercial and Institutional Building Construction, Power and Communication Line and Related Structures Construction, Roofing Contractors, Electrical Contractors and Other Wiring Installation Contractors, Plumbing, Heating, and Air-Conditioning Contractors, Painting and Wall Covering Contractors, Flooring Contractors, Other Building Finishing Contractors, All Other Specialty Trade Contractors, Paper (except Newsprint) Mills, Asphalt Shingle and Coating Materials Manufacturing, All Other Rubber Product Manufacturing, Sheet Metal Work Manufacturing, Roofing, Siding, and Insulation Material Merchant Wholesalers, Other Building Material Dealers, Real Estate and Rental and Leasing
  • Product Areas: ROOFING AND SIDING MATERIALS

Sampling of Federal Government Funding Actions/Set Asides

In order by amount of set aside monies.

  • $9,980 - Tuesday the 11th of September 2012
    Public Buildings Service
    ACQUISITION MANAGEMENT DIVISION
    PROVIDE 2 EMERGENCY DRAINS
  • $9,912 - Thursday the 27th of September 2012
    Public Buildings Service
    GSA/PBS, DESIGN AND CONSTRUCTION DIVISION
    HINESVILLE, GA - MODIFICATION TO ADD $9,912.21 FOR ADDITIONAL SCOPE OF WORK
  • $79,468 - Friday the 7th of October 2011
    Federal Prison System
    WASECA, FCI
    151003 PROJECT 4WS TO SUPPLY&INSTALL EPDM BALLAST TAPERED ROOF (APPROX. 6500 SF) ON ADMIN BLDG. PER ATTACHED SOW. TO INCLUDE REMOVAL&DISPOSAL OF EXISTING ROOF. ALL WORK WILL BE PERFORMED AT FCI WASECA MN.
  • $53,104 - Tuesday the 17th of April 2012
    Smithsonian Institution
    SMITHSONIAN INSTITUTION
    THIS IS CONTRACT WORK ORDER F12CW10146 (WO-01) FOR PROVIDING CONSTRUCTION SERVICES FOR MISCELLANEOUS CAULKING AND MORTAR REPAIRS AT VARIOUS LOCATIONS OF THE SMITHSONIAN INSTITUTION IN WASHINGTON, DC AND SUITLAND, MD.
  • $46,624 - Friday the 25th of May 2012
    Public Buildings Service
    GSA/PBS, DESIGN AND CONSTRUCTION DIVISION
    ADD SECTION OF ROOF THAT WASN'T INCLUDED IN ORGINAL DRAWINGS
  • $3,350 - Friday the 9th of November 2012
    Public Buildings Service
    GSA/PBS, DESIGN AND CONSTRUCTION DIVISION
    ROOFING
  • $24,434 - Thursday the 15th of December 2011
    United States Mint
    DENVER
    DENVER ROOF REPLACEMENT PROJECT. THIS CONTRACT A POTENTIAL NOT TO EXCEED VALUE OF $791,462.40. THE PERIOD OF PERFORMANCE OF THIS CONTRACT IS FROM DATE OF AWARD THROUGH 12/31/2011.
  • $21,290 - Friday the 9th of December 2011
    Department Of Air Force
    FA4528 5 CONS LGCP
    DELETE 6 SKYLIGHTS, ADD 240 ROOFING CONTROL JOINTS
  • $1,783 - Wednesday the 14th of December 2011
    Public Buildings Service
    ACQUISITION MANAGEMENT DIVISION
    WORK DELAYED BY WEATHER. ADD SOME REPAIR WORK TO ROOF TO MAINTAIN IT THROUGH WINTER. FULL REPLACEMENT TO BE DONE IN SPRING OF 2012. DELIVERY DATE IS EXTENDED TO MAY 31, 2012 BY MOD.
  • $17,803 - Monday the 28th of November 2011
    United States Mint
    DENVER
    DENVER ROOF REPLACEMENT PROJECT. THIS CONTRACT A POTENTIAL NOT TO EXCEED VALUE OF $791,462.40. THE PERIOD OF PERFORMANCE OF THIS CONTRACT IS FROM DATE OF AWARD THROUGH 12/31/2011.

© Copyright 2019
The Collier Report
published by 1918 Media LLC.
Information displayed in this dossier has been provided through available open source or public sources. No reliance should be made by readers or Collier Report subscribers. Funding actions are complicated and do not always represent dollar-for-dollar payments to vendors nor do they represent payments in certain instances. Requests for the modification of displayed information may be made to help.desk@1918.media.