The Collier Report of U.S. Government Contracting

Old School Reporting Using Modern Technology

Symmetry Resources Inc

  • Symmetry Resources Inc

  • View government funding actions
  • Arab, AL 350161362
  • Phone: 256-586-8911
  • Estimated Number of Employees: 3
  • Estimated Annual Receipts: $250,000
  • Business Start Date: 1994
  • Contact Person: Brad Strangways
  • Contact Phone: 256-586-8911
  • Contact Email: brad_s@otelco.net
  • Business Structure:
  • Corporate Entity (Not Tax Exempt)
  • Business Type:
  • Self Certified Small Disadvantaged Business
  • For Profit Organization
  • Subchapter S Corporation
  • Industries Served: Storage Battery Manufacturing, Testing Laboratories
  • Product Areas: ADP DATA ENTRY SERVICES, IT AND TELECOM- DATA ENTRY, PROGRAMMING SERVICES, IT AND TELECOM- PROGRAMMING, ADP BACKUP AND SECURITY SERVICES, IT AND TELECOM- CYBER SECURITY AND DATA BACKUP, IT AND TELECOM- DATA CONVERSION, ADP DATA CONVERSION SERVICES, SUPPORT- ADMINISTRATIVE: MAILING/DISTRIBUTION, MAILING AND DISTRIBUTION SERVICES, WORD PROCESSING/TYPING SERVICES, SUPPORT- ADMINISTRATIVE: WORD PROCESSING/TYPING, OTHER ADMINISTRATIVE SUPPORT SVCS, SUPPORT- ADMINISTRATIVE: OTHER

Sampling of Federal Government Funding Actions/Set Asides

In order by amount of set aside monies.

  • $640 - Friday the 24th of August 2012
    National Aeronautics And Space Administration
    JOHNSON SPACE CENTER
    CELL ACCEPTANCE AND VARIOUS TESTING FLIGHT HARDWARE
  • $6,000 - Thursday the 9th of August 2012
    National Aeronautics And Space Administration
    JOHNSON SPACE CENTER
    TESTING LABORATORIES
  • $3,420 - Friday the 2nd of March 2012
    National Aeronautics And Space Administration
    JOHNSON SPACE CENTER
    PURCHASE AND PERFORM TESTING ON 30 CELLS EACH, FROM TWO MANUFACTURERS AND PROVIDE AN EVALUATION TESTING REPORT.
  • $25,828 - Wednesday the 11th of July 2012
    National Aeronautics And Space Administration
    JOHNSON SPACE CENTER
    LI-ION CELLS
  • $24,930 - Monday the 24th of November 2014
    National Aeronautics And Space Administration
    JOHNSON SPACE CENTER
    IGF::OT::IGF SCREENING AND ACCEPTANCE TEST ON PANASONIC HHR-380A NIMH
  • $24,890 - Tuesday the 13th of March 2012
    National Aeronautics And Space Administration
    JOHNSON SPACE CENTER
    CELL ACCEPTANCE AND VARIOUS TESTING FLIGHT HARDWARE
  • $24,770 - Friday the 10th of July 2015
    National Aeronautics And Space Administration
    JOHNSON SPACE CENTER
    THE OBJECTIVE OF THIS PROCUREMENT COMMISSIONED BY THE NASA JSC ENGINEERING DIRECTORATE, PROPULSION AND POWER DIVISION WITH SYMMETRY RESOURCES INC IS TO COMPLETE DESTRUCTIVE AND NON-DESTRUCTIVE ANALYSIS OF TWO SIMILAR LITHIUM ION ELECTROCHEMICAL CELL DESIGNS. SUCCESSFUL CONTRACT PERFORMANCE WILL ENSURE AS-RECEIVED PRODUCTS MEET OR EXCEED PERFORMANCE AND UNIFORMITY SPECIFICATIONS ESTABLISHED BY THE ORIGINAL COMPONENT MANUFACTURER AS WELL AS PROVIDE A COLLECTION OF PERFORMANCE-MATCHED ASSETS AND A TECHNICAL BASIS ELECTROCHEMICAL CELL DESIGN APPLICABILITY ASSESSMENT IN THE INTENDED HUMAN SPACEFLIGHT BATTERY APPLICATION. TO MEET THESE GOALS, THE SUBJECT CONTRACT REQUIRES ANALYSES BE PERFORMED FOR BOTH CELL DESIGNS INCLUDING: RECEIVING INSPECTION; CAPACITY DISCHARGE VS TEMPERATURE, RATE, AND CYCLE NUMBER PERFORMANCE TESTING; SEAL INTEGRITY TESTING; AND SHORT CIRCUIT PERFORMANCE TESTING. THE ELECTROCHEMICAL CELLS WHICH FAIL TO PERFORM ACCORDING TO MANUFACTURER SPECIFICATIONS, OR PERFORM WITH VARIABILITY GREATER THAN THREE-SIGMA OF THE LOT AVERAGE FOR THE SAME CELL DESIGN, WILL BE REJECTED AND DISPOSITIONED FOR RECLAMATION. THE PERFORMANCE-MATCHING PROCESS PORTION OF THIS WORK PROVIDES TWO DISTINCT FUNCTIONS; IT SERVES TO DETECT CELLS WHICH MAY NOT HAVE ORIGINATED FROM THE CHOSEN MANUFACTURER S PRODUCT LINE OR SUFFERED A WORKMANSHIP FAILURE, WHILE ALSO PROVIDING A CULLED SUB-SET OF PERFORMANCE-MATCHED ASSETS FOR USE IN A HIGHLY RELIABLE AND LONG-LIFE HUMAN SPACEFLIGHT BATTERY DESIGN. FINALLY, SUCCESSFUL CONTRACT PERFORMANCE MAY PROVIDE SUFFICIENT TECHNICAL RATIONALE FOR COMPETITIVE DOWN-SELECT OF A SINGLE CELL DESIGN THEREBY PREVENTING THE NEED FOR FURTHER COMPETITIVE PERFORMANCE TESTING AT THE NEXT HIGHER ASSEMBLY LEVEL. THUS, SUCCESSFUL CONTRACT PERFORMANCE COMPLETES THE NECESSARY DESTRUCTIVE AND NON-DESTRUCTIVE ANALYSES REQUIRED TO INSURE AGAINST UNINTENTIONAL ACCEPTANCE OF COUNTERFEIT MATERIAL WHILE ALSO PERFORMANCE-MATCHING AVAILABLE ASSETS FOR USE IN HUMAN SPACEFLIGHT BATTERY DEVELOPMENT, AND PENDING CONTRACT TEST RESULTS, MAY PROVIDE SUFFICIENT RATIONALE TO COMPETITIVELY SELECT THE CHOSEN CANDIDATE CELL FOR USE IN THE BATTERY ASSEMBLY BASED ON SATISFACTION OF BATTERY SAFETY, PERFORMANCE AND LIFE CYCLE REQUIREMENTS.
  • $24,050 - Monday the 27th of August 2012
    National Aeronautics And Space Administration
    JOHNSON SPACE CENTER
    TEST REPORT
  • $22,416 - Thursday the 26th of July 2012
    National Aeronautics And Space Administration
    JOHNSON SPACE CENTER
    FOR USE IN HUMAN SPACE FLIGHT:MATERIALS, MANUFACTURING, AND WORKMANSHIP OF THIGHEST QUALITY STANDARDS ARE ESSENTIAL TO ASTRONAUT SAFETY. IF YOU ARE ABLE TO SUPPLY THE DESIRED ITEM WITH A HIGHER QUALITY THAN THAT OF THE ITEMS SPECIFIED OR PROPOSED, YOU ARE REQUESTED TO BRING THIS FACT TO THE IMMEDIATE ATTENTION OF THE PURCHASER.
  • $21,460 - Friday the 24th of August 2012
    National Aeronautics And Space Administration
    JOHNSON SPACE CENTER
    CELL ACCEPTANCE AND TESTING

© Copyright 2019
The Collier Report
published by 1918 Media LLC.
Information displayed in this dossier has been provided through available open source or public sources. No reliance should be made by readers or Collier Report subscribers. Funding actions are complicated and do not always represent dollar-for-dollar payments to vendors nor do they represent payments in certain instances. Requests for the modification of displayed information may be made to help.desk@1918.media.