  • $72,625 - Monday the 1st of October 2012
    Department Of Army
    W075 ENDIST LOS ANGELES
    R00011 $72,625.00 ADD 10 DAYS RENOVATE BLDG 470, WING HQ&COMMAND
  • $72,440 - Saturday the 8th of September 2012
    Department Of Army
    W075 ENDIST LOS ANGELES
    CONTRACT FOR AF PROJECT PDPG040818-RENOVATE WING HEADQUARTERS&COMMAND POST, BLDG 470 AT MARCH ARB, CA. REF. NO. R00005, INCREASE $72,440.00, SM010 REPAIR EXISTING SLAB IN TOWER, SM015 BEAD-BLAST 2ND FLOOR, SM017 ADD WOOD JAMBS, HEADS&SILLS EXTENSIONS, SM019 SEAL RETURN AIR PLENUM UNDER CP SLAB. THE CONTRACT COMPLETION DATE SHALL BE EXTENDED BY 15 CALENDAR DAYS BY REASON OF THIS MODIFICATION.
  • $70,966 - Sunday the 30th of September 2012
    Department Of Army
    W075 ENDIST LOS ANGELES
    R00008 SM008 ADD CONTRACT WORK, RENOVATE BLDG 470, WING HQ&COMMAND
  • $50,190 - Friday the 7th of September 2012
    Department Of Army
    W075 ENDIST LOS ANGELES
    RENOVATE BLDG 470, WING HQ&COMMAND. CONTRACT FOR AF PROJECT PDPG040818-RENOVATE WING HEADQUARTERS&COMMAND POST, BLDG 470 AT MARCH ARB, CA. REFERENCE NO. R00006, INCREASE $50,190.00, SM013 CONSTRUCT PER REVISED DRAWING, SM014 TOWER SIDING, SM016 REMOVE #2 CABLE RUNNING FROM PULL BOX. THE CONTRACT COMPLETION DATE SHALL BE EXTENDED BY 17 CALENDAR DAYS BY REASON OF THIS MODIFICATION.
  • $44,674 - Monday the 1st of October 2012
    Department Of Army
    W075 ENDIST LOS ANGELES
    R00012 $44,674 SM030 GRIND LEAD PAINT ON INTERIOR STAIRS ADD 10 CALENDAR DAYS MARCH ARB, CA
  • $38,153 - Monday the 1st of October 2012
    Department Of Army
    W075 ENDIST LOS ANGELES
    RENOVATE BLDG 470, WING HQ&COMMAND
  • $36,920 - Monday the 1st of October 2012
    Department Of Army
    W075 ENDIST LOS ANGELES
    RENOVATE BLDG 470, WING HQ&COMMAND
  • $35,041 - Sunday the 30th of September 2012
    Department Of Army
    W075 ENDIST LOS ANGELES
    R00009 SM024 $35,041 CONSTRUCT AND INSTALL HELICAL PIERS MARCH ARB, CA
  • $13,521 - Tuesday the 27th of December 2011
    Department Of Army
    W075 ENDIST LOS ANGELES
    CONTRACT FOR AF PROJECT PDPG040818- RENOVATE WING HEADQUARTERS&COMMAND POST, BLDG. 470 AT MARCH ARB, CA. REFERENCE R00004, SM018 DEMOLITION OF 2 FT X 5 FT X 15 FT SLAB. TOTAL CONTRACT PRICE IS NCREASED BY $13,521.00. THE CONTRACT COMPLETION DATE SHALL BE EXTENDED BY 1 CALENDAR DAY BY REASON OF THIS MODIFICATION.
  • $11,035 - Sunday the 30th of September 2012
    Department Of Army
    W075 ENDIST LOS ANGELES
    R00007 SM022 REMOVE ABANDONED FUEL TANK $11,125 ADD 1 CALENDAR DAY MARCH AFB, CA

© Copyright 2019
The Collier Report
published by 1918 Media LLC.
Information displayed in this dossier has been provided through available open source or public sources. No reliance should be made by readers or Collier Report subscribers. Funding actions are complicated and do not always represent dollar-for-dollar payments to vendors nor do they represent payments in certain instances. Requests for the modification of displayed information may be made to help.desk@1918.media.