Skanska Usa Building Inc

  • Skanska Usa Building Inc

  • View government funding actions
  • San Antonio, TX 782583504
  • Phone: 210-301-7102
  • Estimated Number of Employees: 52,000
  • Estimated Annual Receipts: $18,379,000,000
  • Business Start Date: 2000
  • Contact Person: Katie Cheung
  • Contact Phone: 267-470-1083
  • Contact Email: federal@skanska.com
  • Business Structure:
  • Corporate Entity (Not Tax Exempt)
  • Business Type:
  • Foreign Owned and Located
  • For Profit Organization
  • Industries Served: Commercial and Institutional Building Construction
  • Product Areas: HARVESTING EQUIPMENT, R&D- AGRICULTURE: PRODUCTION (COMMERCIALIZED), R&D-AGRI PRODUCTION-COMERCLIZ

Sampling of Federal Government Funding Actions/Set Asides

In order by amount of set aside monies.

  • $72,052,980 - Friday the 21st of September 2012
    Department Of Army
    W076 ENDIST FT WORTH
    CONSTRUCTION OF LACKLAND AMBULATORY CARE CENTER PHASE 3 (THREE) REPLACEMENT OF OLD WILFORD HALL HOSP ON LACKLAND AIR FORCE BASE, SAN ANTONIO, TEXAS.
  • $7,057 - Thursday the 26th of April 2012
    Department Of Army
    W076 ENDIST FT WORTH
    LACC PHASE 2: ALL WORK TO 5 FOOT LINE STRUCTURAL WALL ALIGNMENT AT COLUMN E
  • $292,150 - Wednesday the 29th of August 2012
    Department Of Army
    W076 ENDIST FT WORTH
    LACC PHASE 2: ALL WORK TO 5 FOOT LINE MJ019 EXTERIOR FINISH CHANGES THIS MODIFICATION COMPENSATES THE CONTRACTOR FOR REQUIRED CHANGES TO EXTERIOR ALUMINUM FINISHES AND SPANDREL GLASS TO MATCH ACC PH1 BUILDING. 1) ALUMINUM: THE FINISH ON ALL ALUMINUM DOORS, FRAMES AND CURTAIN WALL SHALL BE CHANGED FROM CLEAR ANODIZED TO KYNAR 70%, 2 COAT FINISH WITH COLOR CFT6162 GAUNTLET GRAY MICA. 2) SPANDREL GLASS: AT THE 2ND SURFACE, THE GLASS IS TO BE SOLARBAN 70. THE SPANDREL COATING SHALL BE MOVED FROM THE 3RD SURFACE TO THE 4TH SURFACE.
  • $187,395 - Monday the 27th of August 2012
    Department Of Army
    W076 ENDIST FT WORTH
    LACC PHASE 2: ALL WORK TO 5 FOOT LINE MJ013 WATER DISTRIBUTION SYSTEM RE-ROUTE MJ017 RFI-0112 MEDIUM VOLTAGE CONDUIT MJ020 RELOCATE SITE LIGHTING POWER MJ021 STRUCTURAL CHANGES TO STAIR 9&11 MJ022 MISSING FIRE DAMPER AT TOWER B, 2ND LVL MJ024 INFRASTRUCTURE FOR OR MICROSCOPE
  • $1,435,669 - Monday the 2nd of July 2012
    Department Of Army
    W076 ENDIST FT WORTH
    LACC PHASE 2: ALL WORK TO 5 FOOT LINE MJ005 SUPER MOD I. DESCRIPTION OF CHANGE: PURSUANT TO THE CHANGES CLAUSE OF THE CONTRACT ENTITLED, "ACC PHASE II", THE CONTRACTOR SHALL FURNISH ALL PLANT, LABOR, MATERIALS, AND PERFORM ALL WORK NECESSARY TO ACCOMPLISH THE FOLLOWING DESCRIBED WORK. DETAILS OF WORK TO BE PERFORMED ARE DESCRIBED IN THE DRAWINGS AND SPECS WHICH CONTAIN CHANGES/ REVISIONS TO THE SPECIFICATIONS AND DRAWINGS TO INCLUDE ALL CHANGES REFLECTED ON THIS REQUEST, THE FOLLOWING WAS DESCRIBED AND PROVIDED TO THE CONTRACTOR. REQUIREMENTS OF THE FOLLOWING DOCUMENTS INCLUDING SPREADSHEETS, SPECIFICATIONS AND DRAWINGS ARE INCORPORATED INTO THIS CONTRACT BY REASON OF THE MODIFICATION. 1). DRAWINGS VOLUMES 1 THROUGH 9 DATED NOV 8, 2011. 2). SPECIFICATIONS VOLUMES 1 THROUGH 4 DATED NOV 8, 2011. NOTE: NO CHANGES RELATED TO ELECTRICAL IN DRAWINGS VOLUME 7 OR VOLUME 9 MOD #1 DATED NOV 8, 2011, AS WELL AS ANY ELECTRICAL WORK IN MOD #1 DATED NOV 8, 2011 RELATED WITH THE FIRE ALARM, NURSE CALL, PAGING OR SOUND MASKING SYSTEMS. THIS WORK WILL BE ADDRESSED ON A FORTH COMING MODIFICATION. ALL OTHER REQUIREMENTS OF THE CONTRACT REMAIN UNCHANGED BY REASON OF THIS MODIFICATION.
  • $109,605 - Monday the 23rd of April 2012
    Department Of Army
    W076 ENDIST FT WORTH
    LACC PHASE 2: ALL WORK TO 5 FOOT LINE MJ003 SOIL TESTING 1)THIS MODIFICATION COMPENSATES THE CONTRACTOR FOR REQUIRED SOIL TESTING TO ESTABLISH AN ENVIRONMENTAL BASELINE FOR PHASE II IN ORDER TO MANIFEST SOILS OFF SITE OR STORE ON SITE FOR REUSE AT A LATER TIME. PER THE CONTRACT DOCUMENTS SECTION TITLED "SOIL MANAGEMENT PROGRAM DOCUMENT" THE CONTRACTOR SHALL COORDINATE WITH THE BCE ENVIRONMENTAL TO ESTABLISH ENVIRONMENTAL REQUIREMENTS AND CONSTRAINTS. 2) THIS MODIFICATION ALSO PROVIDES COMPENSATION FOR GENERAL CONDITIONS FOR 9 CALENDAR DAYS DELAY TO THE CRITICAL PATH.

© Copyright 2019
The Collier Report
published by 1918 Media LLC.
Information displayed in this dossier has been provided through available open source or public sources. No reliance should be made by readers or Collier Report subscribers. Funding actions are complicated and do not always represent dollar-for-dollar payments to vendors nor do they represent payments in certain instances. Requests for the modification of displayed information may be made to help.desk@1918.media.