The Collier Report of U.S. Government Contracting

Old School Reporting Using Modern Technology

Shalom Baranes Associates P C

  • Shalom Baranes Associates P C

  • View government funding actions
  • Washington, DC 20007
  • Phone:
  • Estimated Number of Employees: 100
  • Estimated Annual Receipts: $20,000,000
  • Business Start Date: 1993
  • Contact Person: Debra Baugh
  • Contact Phone: 202-342-2200
  • Contact Email: dbaugh@sbaranes.com
  • Business Structure:
  • Corporate Entity (Not Tax Exempt)
  • Business Type:
  • For Profit Organization
  • Subchapter S Corporation
  • Industries Served: Architectural Services
  • Product Areas: SPECIAL STUDIES/ANALYSIS- ENERGY, ENERGY STUDIES, ARCHITECT AND ENGINEERING- GENERAL: INSPECTION (NON-CONSTRUCTION), A/E - INSPECT - NON CONTRUCT, ARCHITECT AND ENGINEERING- GENERAL: MANAGEMENT ENGINEERING, A&E MANAGEMENT ENGINEERING SERVICES, A/E PROD ENG SVCS (INCL DESIGN-CONT, ARCHITECT AND ENGINEERING- GENERAL: PRODUCTION ENGINEERING, ENVIRONMENTAL SYSTEMS PROTECTION- WATER QUALITY SUPPORT, WATER QUALITY SUPPORT SERVICES, ENGINEERING AND TECHNICAL SERVICES, SUPPORT- PROFESSIONAL: ENGINEERING/TECHNICAL, LECTURES FOR TRAINING, EDUCATION/TRAINING- LECTURES, SCIENTIFIC AND MANAGEMENT EDUCATION, EDUCATION/TRAINING- SCIENTIFIC/MANAGEMENT, EDUCATION/TRAINING- VOCATIONAL/TECHNICAL, VOCATIONAL/TECHNICAL, TRAINING/CURRICULUM DEVELOPMENT, EDUCATION/TRAINING- TRAINING/CURRICULUM DEVELOPMENT

Sampling of Federal Government Funding Actions/Set Asides

In order by amount of set aside monies.

  • $83,655 - Thursday the 17th of November 2011
    Public Buildings Service
    WPHBA - CAPITAL CONSTRUCTION BRANCH
    THIS MODIFICATION IS TO PROVIDE FOR COST ESTIMATES FOR 50%, 75%, AND 100% SUBMISSIONS RELATED TO THE TENANT FIT-OUT DESIGN IN SUPPORT OF THE 1800F MODERNIZATION.
  • $77,387 - Tuesday the 22nd of May 2012
    Public Buildings Service
    WPHBA - CAPITAL CONSTRUCTION BRANCH
    THE CONTRACTOR SHALL PROVIDE COST ESTIMATING SERVICES RELATED TO THE RECENTLY RELEASED BULLETIN 44. ESTIMATE SHALL INCLUDE ALL WORK RELATED TO TENANT FIT-OUT AS WELL AS BASE BUILDING MODIFICATIONS.
  • $7,100 - Tuesday the 7th of February 2012
    Public Buildings Service
    WPHBA - CAPITAL CONSTRUCTION BRANCH
    RECALCULATE SQUARE FOOTAGE FOR EACH FLOOR DUE TO MECHANICAL AND IT SCOPE REVISIONS. USE 1996 BOMA GUIDELINES.
  • $63,250 - Monday the 25th of July 2016
    Public Buildings Service
    WPHBA - CAPITAL CONSTRUCTION BRANCH
    CONTRACTOR TO PROVIDE DESIGN SERVICES FOR AN ACCESSIBLE RAMP AT C STREET ENTRANCE TO SERVE AS A TEMPORARY ENTRACE TO THE BUILDING.
  • $5,798 - Friday the 28th of June 2013
    Public Buildings Service
    WPHBA - CAPITAL CONSTRUCTION BRANCH
    PROVIDE ENGINEERING AND DESIGN FOR FLOOR TRENCHING IN CONFERENCE ROOMS TO ACCOMMODATE POWER, DATA AND AV DROPS IN ACCORDANCE WITH THE CONTRACTOR PROPOSAL DATED 25 JUNE 2012.
  • $5,279 - Wednesday the 25th of April 2012
    Public Buildings Service
    WPHBA - CAPITAL CONSTRUCTION BRANCH
    REVISE BASE BUILDING RENDERING TO REFLECT PHASE 1 ONLY
  • $42,582 - Monday the 25th of July 2016
    Public Buildings Service
    WPHBA - CAPITAL CONSTRUCTION BRANCH
    CONTRACTOR TO PROVIDE FEASIBILITY STUDY FOR A CONFERENCE CENTER FOR THE FORMER MUSEUM SPACE IN WING 2 AT THE DEPARTMENT OF INTERIOR.
  • $41,786 - Tuesday the 7th of February 2012
    Public Buildings Service
    WPHBA - CAPITAL CONSTRUCTION BRANCH
    EXTEND AND INCREASE THE EGRESS CAPACITY OF STAIR 5.4 TO PROVIDE EGRESS FOR ALL FLOORS. ALSO, DESIGN AND DOCUMENT TEMPORARY EGRESS STAIR IN THE EAST COURTYARD TO PROVIDE THE NECESSARY AND REQUIRED EGRESS DURING PHASE 2 CONSTRUCTION.
  • $384,461 - Monday the 25th of July 2016
    Public Buildings Service
    WPHBA - CAPITAL CONSTRUCTION BRANCH
    RE: DOI MODERNIZATION PROJECT PROVIDE ASSITIONAL POST DESIGN SERVICES FOR CHILD CARE CENTER, ARRA GREEN PROJECTS, COURTYARD EE, B-200 AREA, PENTHOUSE UPGRADES, LEED CERTIFICATION MANAGEMENT AND WING 1 FOUNDATION WATERPROOFING. PROVIDE ADDITIONAL ASSISTANCE WITH PUNCHLIST ITEMS PROVIDE ADDITIONAL SITE MEETINGS AND REVIEWS AS NEEDED FOR CLOSE-OUT AND COMPLETION.
  • $35,116 - Tuesday the 22nd of May 2012
    Public Buildings Service
    WPHBA - CAPITAL CONSTRUCTION BRANCH
    THE CONTRACTOR SHALL REVISE THE LAYOUT OF THE OIGS NEW SPACE ON THE GROUND FLOOR PER THE TENANT'S FUNCTIONAL REQUIREMENTS. ENGINEER A NEW DATA CENTER IN ACCORDANCE WITH THE TECHNICAL REQUIREMENTS PROVIDED UNDER SEPARATE COVER.

© Copyright 2019
The Collier Report
published by 1918 Media LLC.
Information displayed in this dossier has been provided through available open source or public sources. No reliance should be made by readers or Collier Report subscribers. Funding actions are complicated and do not always represent dollar-for-dollar payments to vendors nor do they represent payments in certain instances. Requests for the modification of displayed information may be made to help.desk@1918.media.