  • S T Wooten Corporation

  • View government funding actions
  • Wilson, NC 278939568
  • Phone: 252-291-5165
  • Estimated Number of Employees: 925
  • Estimated Annual Receipts: $290,000,000
  • Business Start Date: 1956
  • Contact Person: Doug Godwin
  • Contact Phone: 252-291-5165
  • Contact Email: doug@stwcorp.com
  • Business Structure:
  • Corporate Entity (Not Tax Exempt)
  • Business Type:
  • For Profit Organization
  • Subchapter S Corporation
  • Industries Served: Water and Sewer Line and Related Structures Construction, Highway, Street, and Bridge Construction, Other Heavy and Civil Engineering Construction, Poured Concrete Foundation and Structure Contractors, Structural Steel and Precast Concrete Contractors, Site Preparation Contractors, Asphalt Paving Mixture and Block Manufacturing, Ready-Mix Concrete Manufacturing
  • Product Areas: FOOD COOKING, BAKING, AND SERVING EQUIPMENT, FOOD COOKING BAKING SERVING EQ, FIRE PREVENTION AND CONTROL (BASIC), R&D- COMMUNITY SVC/DEVELOP: FIRE PREVENTION/CONTROL (BASIC RESEARCH), R&D- COMMUNITY SVC/DEVELOP: FIRE PREVENTION/CONTROL (ADVANCED DEVELOPMENT), R&D-FIRE PREVENT & CONT-ADV DEV, QUALITY CONT SV/FOOD PREP-SERVE EQ, QUALITY CONTROL- FOOD PREPARATION AND SERVING EQUIPMENT, MAINT/REPAIR/REBUILD OF EQUIPMENT- FOOD PREPARATION AND SERVING EQUIPMENT, MAINT-REP OF FOOD PREP-SERVING EQ, MAINT/REPAIR/REBUILD OF EQUIPMENT- CLEANING EQUIPMENT AND SUPPLIES, MAINT-REP OF CLEANING EQ, HOUSEKEEPING- CUSTODIAL JANITORIAL, CUSTODIAL JANITORIAL SERVICES, FIRE PROTECTION SERVICES, HOUSEKEEPING- FIRE PROTECTION

Sampling of Federal Government Funding Actions/Set Asides

In order by amount of set aside monies.

  • $57,327 - Tuesday the 28th of August 2012
    Department Of Navy
    NAVAL FAC ENGINEERING CMD MID LANT
    BASE BID, P00004 REMOVE 80 LF OF FENCE, INSTALL NEW FENCE AND GATES
  • $52,113 - Tuesday the 19th of June 2012
    Department Of Navy
    NAVAL FAC ENGINEERING CMD MID LANT
    WATER LINE LOCATION IN ORIGINAL PROJECT WAS NOT CORRECT, PLAN FOR THIS UTILITIES EXTENSION INTERFERED WITH EXISTING UTILITIES AND THE WATER LINE NEEDED TO BE MOVED, BASE LANDFILL IS NO LONGER ALLOWING CONTRACTORS TO HAUL DEBRIS THERE AS IT IS OVER CAPACITY PCO 03 THE CONTRACTOR SHALL PROVIDE ALL MATERIAL, LABOR, TRANSPORTATION, AND SUPERVISION TO FACILITATE THE INSTALLATION OF THE 36" STEEL CASING TO BE INSTALLED BY BORE AND JACK UNDER SNEADS FERRY ROAD AND 18" STEEL CASING TO BE INSTALLED BY BORE AND JACK UNDER PINEY GREEN ROAD ON SHEET CU128 AS FOLLOWS: - PROVIDE ADDITIONAL 35 LF OF A 36" STEEL CASING TO BE INSTALLED BY BORE AND JACK UNDER SNEADS FERRY ROAD ON SHEET CU101. - PROVIDE ADDITIONAL 20 LF OF 18" STEEL CASING TO BE INSTALLED BY BORE AND JACK UNDER PINEY GREEN ROAD ON SHEET CU128. - DELETE THE 20" CASING AND JACK AND BORE OPERATION AT THE TRAFFIC CIRCLE. - APPLY SAFETY MEASURES IN ACCORDANCE WITH THE EM-385-1-1. PCO 06 THE CONTRACTOR SHALL PROVIDE ALL MATERIAL, LABOR, TRANSPORTATION, AND SUPERVISION TO HAUL CLEARING DEBRIS FOR THIS PROJECT AS FOLLOWS: - HAUL CLEARING DEBRIS OFF SITE FROM GOVERNMENT PROPERTY AND DISPOSE OFF-SITE AT AN APPROVED LANDFILL. SOLID WASTE DISPOSAL OFF-SITE MUST COMPLY WITH MOST STRINGENT LOCAL, STATE, AND FEDERAL REQUIREMENTS INCLUDING 40 CFR 241, 40 CFR 243, AND 40 CFR 258. - APPLY SAFETY MEASURES IN ACCORDANCE WITH THE EM-385-1-1.
  • $4,467 - Thursday the 12th of January 2012
    Department Of Navy
    SUPPLY DIRECTORATE
    READY-MADE CONCRETE
  • $296,543 - Wednesday the 11th of January 2012
    Department Of Navy
    NAVAL FAC ENGINEERING CMD MID LANT
    RESURFACE WITH 1.5 IN FROM 7TH AVE TO WORK AREA 4
  • $1,438,590 - Saturday the 29th of September 2012
    Department Of Navy
    NAVAL FAC ENGINEERING CMD MID LANT
    ADDITIONAL MILLING&PAVING

© Copyright 2019
The Collier Report
published by 1918 Media LLC.
Information displayed in this dossier has been provided through available open source or public sources. No reliance should be made by readers or Collier Report subscribers. Funding actions are complicated and do not always represent dollar-for-dollar payments to vendors nor do they represent payments in certain instances. Requests for the modification of displayed information may be made to help.desk@1918.media.