Rn Civil Construction Llc

  • Rn Civil Construction Llc

  • View government funding actions
  • Centennial, CO 801114592
  • Phone: 303-482-3059
  • Estimated Number of Employees: 25
  • Estimated Annual Receipts: $15,000,000
  • Business Start Date: 2002
  • Contact Person: Dan Niehus
  • Contact Phone: 303-482-3059
  • Contact Email: rpyziak@rncivilconstruction.com
  • Business Structure:
  • Other
  • Business Type:
  • For Profit Organization
  • Limited Liability f
  • Industries Served: Water Supply and Irrigation Systems, Sewage Treatment Facilities, Industrial Building Construction, Water and Sewer Line and Related Structures Construction, Other Heavy and Civil Engineering Construction, Poured Concrete Foundation and Structure Contractors, Plumbing, Heating, and Air-Conditioning Contractors, Site Preparation Contractors, All Other Specialty Trade Contractors, All Other Miscellaneous Fabricated Metal Product Manufacturing, Commercial and Industrial Machinery and Equipment (except Automotive and Electronic) Repair and Maintenance
  • Product Areas: INSTALL OF PUMPS & COMPRESSORS, INSTALLATION OF EQUIPMENT- PUMPS AND COMPRESSORS, INSTALL OF WATER PURIFICATION EQ, INSTALLATION OF EQUIPMENT- WATER PURIFICATION AND SEWAGE TREATMENT EQUIPMENT

Sampling of Federal Government Funding Actions/Set Asides

In order by amount of set aside monies.

  • $7,255 - Wednesday the 2nd of May 2012
    Department Of Army
    W071 ENDIST OMAHA
    TAS::96 3135::TAS ARRA::YES::ARRA RECOVERYPROJECT#::323621::RP# REHAB SERVICE/EMERG GATES/TRASHRACK AT CHATFIELD DAM, CO REHAB WATERTIGHT DOOR AT BEAR CREEK DAM CO A1100-ARRA-RECOVERY FUNDS THE EAST SERVICE GATE LEAF NUT HAS NOT YET BEEN REMOVED. IT IS UNCLEAR EVEN WITH GOVERNMENT DIRECTION ON A NON-DESTRUCTIVE REMOVAL APPROACH, IF THIS LEAF NUT WILL BE DAMAGED DURING REMOVAL. THIS SUPPLEMENT IS TO DIRECT THE CONTRACTOR TO FABRICATE AN ADDITIONAL LEAF NUT TO EITHER REPLACE THE EAST GATE LEAF NUT OR SERVE AS A SPARE FOR FUTURE WORK ON THE GATES. DUE TO THE LONG LEAD TIME REQUIRED TO FABRICATE AND DELIVER THESE LEAF NUTS, HAVING THIS LEAF NUT READILY AVAILABLE WILL MINIMIZE SCHEDULE IMPACTS IN THE EVENT THAT THE EAST LEAF NUT IS DAMAGED DURING REMOVAL. CD-M CONSTRUCTION DIVISION CONSTRUCTION CONTRACT MODIFICATION R20003, $7,254.98
  • $54,081 - Wednesday the 6th of June 2012
    Department Of Army
    W071 ENDIST OMAHA
    CD-M CONSTRUCTION DIVISION, CONSTRUCTION CONTRACT MODIFICAT5ION R30007, $362,163.00 TE 488 DAYS NON ARRA - BEAR CREEK DAM MARINE DOOR
  • $308,082 - Wednesday the 6th of June 2012
    Department Of Army
    W071 ENDIST OMAHA
    TAS::96 3135::TAS ARRA::YES::ARRA RECOVERYPROJECT#::323621::RP# REHAB SERVICE/EMERG GATES/TRASHRACK AT CHATFIELD DAM, CO REHAB WATERTIGHT DOOR AT BEAR CREEK DAM, CO A1100-ARRA-RECOVERY FUNDS THIS CHANGE IS TO SETTLE THE FULL SCOPE OF THE BRIDGE CRANE MODIFICATION TO INCLUDE COST AND TIME. THIS WILL ENABLE THE CONTRACTOR TO COMPLETE FABRICATION OF THE BRIDGE CRANE STEEL STRUCTURE, INSTALL THE STATIC STRUCTURE, INSTALL THE BRIDGE CRANE, AND COMPLETE ALL ASSOCIATED TESTING PRIOR TO COMPLETING THE BALANCE OF THE ORIGINAL CONTRACT. CD-M CONSTRUCTION DIVISION, CONSTRUCTION CONTRACT MODIFICATION R30007, $362,163.00 TE 488 DAYS.
  • $300,000 - Wednesday the 2nd of May 2012
    Department Of Army
    W071 ENDIST OMAHA
    TAS::96 3135::TAS ARRA::YES::ARRA RECOVERYPROJECT#::323621::RP# REHAB SERVICE/EMERGENCY GATES/TRASHRACK AT CHATFIELD DAM, CO REHAB WATERTIGHT DOOR AT BEAR CREEK DAM, CO A1100-ARRA-RECOVERY FUNDS AN IMMEDIATE NTP TO INCREASE THE NOT TO EXCEED AMOUNT IS REQUIRED BECAUSE THE FINAL DESIGN FOR THE MODIFICATION CANNOT BE COMPLETED WITHOUT SHOP DRAWINGS FOR THE BRIDGE CRANE SO LOADING AND ELECTRICAL REQUIREMENTS CAN BE DETERMINED. AT THIS TIME A TEMPORARY SPECIALIZED HOIST NEEDS TO BE PROCURED IN ORDER TO REINSTALL THE WEST SERVICE GATE PRIOR TO PEAK SNOWMELT AND TO PREVENT FLOODING. THIS GATE WILL BE REINSTALLED IN THE EARLY MAY TIMEFRAME USING THE TEMPORARY HOIST SYSTEM ON THE CONSTRUCTED BRIDGE CRANE STRUCTURE. THIS SPECIALIZED HOIST IS NOT COMMONLY AVAILABLE. SECURING THE HOIST AT THIS TIME ENSURES ITS AVAILABILITY TO REINSTALL THE GATE AND PRIOR TO THE POTENTIAL FLOOD SEASON. IN ADDITION, AN IMMEDIATE NTP IS NEEDED BECAUSE THE BRIDGE CRANE HAS A LEAD TIME FOR FABRICATION OF 22 WEEKS AND APPROXIMATELY THREE (3) WEEKS FOR SHIPPING AND INSTALLATION. IT IS DESIRABLE BY OPERATIONS TO INSTALL AND MAKE OPERATIONAL THIS PERMANENT CRANE AS SOON AS POSSIBLE TO HAVE A FULLY OPERATIONAL TOWER. GIVING THE CONTRACTOR AN IMMEDIATE NTP WILL ALLOW THE CONTRACTOR TO SECURE THE TEMPORARY HOIST AND BEGIN FABRICATING THE CRANE IMMEDIATELY AND CONCURRENTLY WITH THE COMPLETION OF THE FINAL BRIDGE CRANE DESIGN. CD-M CONSTRUCTION DIVISION, CONSTRUCTION CONTRACT MODIFICATION R10007, $300,000.00
  • $20,000 - Wednesday the 2nd of May 2012
    Department Of Army
    W071 ENDIST OMAHA
    TAS::96 3135::TAS ARRA::YES::ARRA RECOVERYPROJECT#::323621::RP# REHAB SERVICE/EMERGENCY GATES/TRASHRACK AT CHATFIELD DAM, CO REHAB WATERTIGHT DOOR AT BEAR CREEK DAM, CO AFTER INSPECTION AND REVIEW OF THE CHATFIELD BRIDGE LEADING TO THE TOWER, STRUCTURAL ENGINEERS HAVE DETERMINED THAT THE BRIDGE CAN ONLY SUPPORT A GROSS VEHICLE WEIGHT OF 27,500 POUNDS FOR INFREQUENT USE. THIS WEIGHT LIMITATION PRECLUDES THE USE OF THE ORIGINAL CRANE FOR REMOVAL AND INSTALL OF THE EMERGENCY AND SERVICE GATES DURING ROUTINE MAINTENANCE. CONSEQUENTLY, A PERMANENT BRIDGE CRANE NEEDS TO BE CONSTRUCTED ON THE TOWER FOR REMOVAL AND INSTALL OF THESE GATES. THIS APPROACH SUPERSEDES THE AIR CRANE SUPPORT APPROACH UNDER R10006. A 2-PART MODIFICATION IS NEEDED BECAUSE FINAL DESIGN DOCUMENTS FOR THE BRIDGE CRANE ARE STILL UNDER DEVELOPMENT BY USACE, BUT THE CONTRACTOR COULD BEGIN DEVELOPING SHOP DRAWINGS FOR THE BRIDGE CRANE WITH THE EXISTING DRAFT FINAL DESIGN DOCUMENTS. PROVIDING DIRECTION IN THE SHORT TERM FOR THE CONTRACTOR TO START WORK ON THE SHOP DRAWINGS COULD SAVE AS MUCH AS FOUR WEEKS ON THE SCHEDULE. THIS IS CRITICAL BECAUSE IT IS ANTICIPATED THAT DESIGN, INSTALL, AND TESTING OF THE BRIDGE CRANE WILL TAKE APPROXIMATELY SEVEN (7) MONTHS TO COMPLETE AND IT IS DESIRABLE TO COMPLETE THIS WORK PRIOR TO THE SUMMER 2012 SNOWMELT SEASON. CD-M CONSTRUCTION DIVISION, CONSTRUCTION CONTRACT MODIFICATION R00007, $20,000.00 NTE A1100-ARRA-RECOVERY FUNDS

© Copyright 2019
The Collier Report
published by 1918 Media LLC.
Information displayed in this dossier has been provided through available open source or public sources. No reliance should be made by readers or Collier Report subscribers. Funding actions are complicated and do not always represent dollar-for-dollar payments to vendors nor do they represent payments in certain instances. Requests for the modification of displayed information may be made to help.desk@1918.media.