Raveco/e Corp Jv Llc

Sampling of Federal Government Funding Actions/Set Asides

In order by amount of set aside monies.

  • $92,713 - Friday the 5th of October 2012
    Department Of Army
    W071 ENDIST SEATTLE
    CONTRACT FOR MAIN POST CHAPEL RENOVATION AT JBLM, WA. REFERENCE NO. R00009 FL009 VARIOUS ARCHITECTURAL UPGRADES FL009 VARIOUS ARCHITECTURAL UPGRADES VARIOUS ARCHITECTURAL UPGRADE PROVIDE ALL LABOR, EQUIPMENT AND MATERIAL TO PERFORM THE FOLLOWING: A. REPLACE AS NECESSARY, 32 EACH, SIZE 18"X36", AMBER COLORED FROSTED GLASS FINISH PANELS THROUGHOUT THE BASEMENT SPACE, MAIN POST CHAPEL BLDG 2001. B. INSTALL 32 EACH STORM WINDOWS WITH THERMAL ENERGY EFFICIENT PROTECTION AND UV PROTECTED RAYS THROUGHOUT THE BASEMENT SPACE, MAIN POST CHAPEL BLDG 2001. C. REFERENCE PLATE NO. A100, EXTERIOR BASEMENT LOCATION OUTSIDE OF TOILET ROOM B15, CATHOLIC MORNING CHAPEL. REPAIR/REPLACE DAMAGED EXTERIOR CONCRETE STRINGER, CONCRETE STEPS, AND TO INCLUDE REFURBISH OF IRON HANDRAIL. D. REFERENCE PLATE NO. A101. ADD NOTE,"IN BETWEEN MAIN CHAPEL (102) AND FORWARD OF FOYER (100) EXPOSED SPRINKLER PIPING INSTALLED TIGHT AGAINST CONCRETE BEAM THAT RUN PARALLEL TO GRIDLINES "02","03" AND "04" AND TIGHT AGAINST THE CONCRETE BEAM THAT RUNS PARALLEL TO GRIDLINE "I" MUST BE CONCEALED WITH A SOFFIT SYSTEM, PLASTER FINISH AND PAINTED TO MATCH EXISTING SURROUNDING". E. REFERENCE PLATE NO. A100, ASSEMBLY ROOM B13. ADD NOTE,"IN ASSEMBLY ROOM B13 PROVIDE NEW SOFFIT SYSTEM TO RUN PARALLEL TO GRIDLINES "C" AND "D" AND BETWEEN GRIDLINES "02" AND "04", TO CONCEAL EXPOSED CONCRETE BEAM. F. REFERENCE PLATE NO. A103, A/V CONTROL BOOTH A206. ADD NOTE, "PROVIDE A CEILING THAT IS INTRUSION PROOF WITH ADEQUATE VENTILATION". G. REFERENCE PLATE NO.A101, COPPER ROOF AREA. GRID LINE "C" AND "01" LINE. ADD NOTE,"REPLACE EXTERIOR ROOF TO WALL METAL FLASHING. H. REFERENCE PLATE NO. E100, CHAPEL BASEMENT LIGHTING, BETWEEN GRID LINES E AND F. ADD NOTE, "PROVIDE EIGHT (8) EACH ADDITIONAL 2X2 FLUORESCENT LIGHT FIXTURES IN HALL AREA. TAKE POWER FROM PNL "F". I. REFERENCE PLATE NO. A103, ASSEMBLY (AUDITORIUM) ROOM A211. ADD NOTE, "REPAIR PLASTER BEAMS DAMAGED DUE TO RAIN WATER INFILTRATION BETWEEN GRIDLINES "CA" AND "GA". J. REFERENCE PLATE NO. E500 AND E503, ELECTRICAL ROOM A108. REMOVE/REPLACE EXISTING PANEL "MP", 3P4W, 120/208Y, 400A "MAIN" WITH BRANCH BREAKERS; 1-3P150A CB; 1-3P100A CB; 1-3P70A CB; 1-3P125A CB; 1- 3P400A "MAIN". K. REFERENCE PLATE NO. FP401, ROOM A105 OFFICE. REVISE CONTROL WIRING IN ROOM A105 TO ACCOMODATE DDC CONTROLS AND ELEVATOR PENETRATION. L. REFERENCE PLATE NO. A400, A411, AND A412. PROVIDE ADDITIONAL WALL TILES IN ROOM(S) A109,A208,A209,B01 AND B04 WHICH WERE NOT IDENTIFIED IN ORIGINAL CONTRACT SCOPE AND DRAWINGS. M. REFERENCE PLATE NO. A122, A123, AND A400. PROVIDE STAINLESS STEEL ACCESS PANELS IN ALL RESTROOMS. N. REFERENCE PLATE NO. E200, BOILER ROOM B17. PROVIDE VARIABLE FREQUENCY DRIVE (VFD) WIRING AND COMBO STARTER FOR AHU-1 HC PUMP # 8,FUSED,SIZE 1,NEMA 1. O. REFERENCE PLATE NO. E200, BOILER ROOM B17. PROVIDE FIVE (5) EACH ADDITIONAL FLUORESCENT LIGHTING THROUGHOUT THE BOILER ROOM. P. REFERENCE PLATE NO. A102, CLASSROOM A113, REPAIR DAMAGED PLASTER IN ROOM A113. Q. REFERENCE PLATE NO. A101, STAIRS 001. PROVIDE SOFFIT TO ENCLOSE EXISTING PIPING.
  • $60,161 - Friday the 5th of October 2012
    Department Of Army
    W071 ENDIST SEATTLE
    CONTRACT FOR MAIN POST CHAPEL RENOVATION AT JBLM, WA. REFERENCE NO. R00006 FL004 COMMUNICATIONS DESIGN CORRECTIONS 1. REVISE CONTRACT DRAWING TD-500 AS FOLLOWS: A. REVISE REFERENCE NOTE 1 TO READ: DISCONNECT EXISTING 25-PAIR #24 AWG PE-89 COPPER AND 12-STRAND SINGLE-MODE FIBER OPTIC ENTRANCE CABLES FROM EXISTING TELCOM CABINET AND 66-BLOCKS MOUNTED ON PLYWOOD BACKBOARD. PROVIDE AND INSTALL TWO SEPARATE RUNS OF EMT CONDUITS WITH NEW 50-PAIR #24 AWG PE-89 COPPER AND 12-STRAND SINGLE-MODE FIBER OPTIC CABLES FROM MAIN CHAPEL BASEMENT ROOM 001- STAIR CORRIDOR (INTERIOR SOUTHWEST CORNER) AND EXTEND TO INTERCEPT NEW COMM ROOM A-120.IN CHAPEL ANNEX. B. REVISE 3RD SENTENCE OF REFERENCE NOTE 2 TO READ: PROVIDE NEW 2-HOUR RATED PLYWOOD BACKBOARD ON THE ENTIRE ADJACENT WALL AS INDICATED IN PHOTO AND RELOCATE TELECOM CABINET TO NEW BACKBOARD. 2. ADD REFERENCE NOTE TO DRAWING T102 REQUIRING THE INSTALLATION OF TMGB GROUNDING SYSTEM IN ROOM A-120 AS REQUIRED BY I3A. 3. ADD FLOOR PLAN NOTE TO DRAWING A-001, AND APPLY TO EXISTING WINDOWS FOR ROOM A-120 ON DRAWING A-102. THE NOTE SHALL REQUIRE THAT THE EXISTING WINDOWS BE COVERED FROM THE INSIDE WITH PLYWOOD, AND "BLACKED OUT" ON THE EXTERIOR SIDE SO THAT EXTERIOR APPEARANCE IS MAINTAINED. 4. REVISE DRAWING A600 TO SHOW ROOM NAME FOR A-102 AS COMMS RATHER THAN COPY. REVISE FLOOR FINISH IN ROOM A-120 TO ANTI-STATIC COATING RATHER THAN CPT-1 TO MEET I3A REQUIREMENTS. 5. ADD A REFERENCE NOTE TO DRAWING ED-202 WHICH REQUIRES THAT THE TWO EXISTING OUTLETS BE MOVED FROM THE EAST AND WEST WALLS, TO THE NORTH AND WEST WALLS. NOTE: BOTH OF THE CONVENIENT RECEPTACLES SHALL BE ON DEDICATED 120 VAC, 20 AMP CIRCUITS. 7. PLATE A100. REVISE DRAWING A-100 TO SHOW A DOORWAY ADJACENT TO STAIRS 001, WHICH WILL ALLOW ACCESS TO SOUTHWEST CORNER OF CHAPEL BASEMENT (OLD COMMUNICATIONS ENTRY POINT). 8. ADD REFERENCE NOTE TO DRAWING T102 REQUIRING INSTALLATION OF A WALL MOUNT TELEPHONE OUTLET WITH CAT 6 WIRING IN COMM ROOM A-120 AS REQUIRED BY I3A REQUIREMENTS. WIRING&JACKS SHALL BE BLUE.
  • $39,192 - Friday the 5th of October 2012
    Department Of Army
    W071 ENDIST SEATTLE
    CONTRACT FOR MAIN POST CHAPEL RENOVATION AT JBLM, WA. REFERENCE NO. R00004 FL005 WALL REPAIRS UNDER CHALKBOARDS 1. ADD NEW DEMOLITION NOTE D42 TO DRAWING A001 WHICH REQUIRES THE REMOVAL OF EXISTING CHALKBOARDS AND UNDERLYING WOOD FRAMES IN CLASSROOMS. ADD FLOOR PLAN NOTE F33 TO A001 WHICH REQUIRES THE INFILL OF REMOVED CHALKBOARD FRAMES AND BEPLASTERING TO MATCH SURROUNDING AREA. (REF. RFI-0039). 2. REVISE DRAWING AD102 TO REFER TO NOTE D42 AT EXISTING CHALKBOARD LOCATIONS IN ROOMS A102, A103, A105, A106, A112, A113, A115, A116, A117, A118 AND A119. REVISE DRAWING A102 TO REFER TO NOTE F33 AT THESE SAME LOCATIONS. 3. REVISE DRAWING AD103 TO REFER TO TO REFER TO NOTE D42 AT EXISTING CHALKBOARD LOCATIONS IN ROOMS A202, A203, A204, A205 AND A206. (REF. RFI-0039). REVISE DRAWING A103 TO REFER TO NOTE F33 AT THESE SAME LOCATIONS.
  • $31,228 - Friday the 5th of October 2012
    Department Of Army
    W071 ENDIST SEATTLE
    CONTRACT FOR MAIN POST CHAPEL RENOVATION AT JBLM, WA. REFERENCE NO. R00003 FL002 MECHANICAL&ELECTRICAL REPAIRS 1. REVISE CONTRACT DRAWING MP-100 TO SHOW SAW CUT LINES CONTINUED FROM BOILER FLOOR DRAIN TO SUMP PIT. REPLACE THE EXISTING 2" DIAMETER DRAIN PIPING WITH 4" PIPING. RECONNECT THE 2" TRAP ARM FROM THE EXISTING FLOOR DRAIN WHERE THIS PIPE MEETS WITH NEW 4" WASTE LINE (REF. RFI-0002). 2. REVISE CONTRACT DRAWING MP-100 FOR TOILET ROOM B15 (CONNER NEAR GRID LINES C AND 05) WITH A FLAG NOTE TO REMOVE BACK WALL (WEST SIDE OF ROOM) AND REPAIR EXISTING LEAKING PLUMBING (REF. RFI-0003). 3. ADD A REFERENCE NOTE TO CONTRACT DRAWING ED-102 WHICH REQUIRES DEMO OF TWO (2) EXISTING PILOT LIGHTS IN ROOM A-104. (REF. RFI-0010). 4. ADD A REFERENCE NOTE TO CONTRACT DRAWING ED-202 TO DEMO THREE (3) RECEPTACLES NOT CURRENTLY SHOWN ON THE DRAWING. DISCONNECT AND REMOVE THE RECEPTACLES AND WIREMOLD BACK TO NEAREST JUNCTION BOX. (REF. RFI-0011). 5. REVISE CONTRACT DRAWING E-203 TO REPLACE THE 60AS/40AF DISCONNECT FOR RTU-1 WITH A 200AS/150AF DISCONNECT (REF. RFI-0031). 6. REVISE CONTRACT DRAWING E-202, REFERENCE NOTE 8, TO REQUIRE CONNECTION OF NEW WATER HEATER WH-1 TO MDP RATHER THAN TO EXISTING SPACE IN MP. (REF. RFI-0032): 7. AMEND REFERENCE NOTE 1 ON CONTRACT DRAWING E-202 TO REQUIRE REPLACEMENT OF EXISTING CONDUCTORS IN ORDER TO PROVIDE DEDICATED NEUTRALS AND ONE GROUND PER RACEWAY. (REF. RFI-0036).
  • $29,055 - Friday the 5th of October 2012
    Department Of Army
    W071 ENDIST SEATTLE
    CONTRACT FOR MAIN POST CHAPEL RENOVATION AT JBLM, WA. REFERENCE NO. R00008 FL008 MISC ELECTRICAL/MECHANICAL REVISIONS A. REVISE CONTRACT DRAWING MH100 (BASEMENT HVAC PLAN), (REF RFI-0066) TO ADD A PLAN NOTE FOR HEATING SUPPLY, CHILLED SUPPLY AND CHILLED RETURN PIPING. PROVIDE NEW HWS, HWR, CHS AND CHR PIPING TO BE INSTALLED SUCH THAT THE NEW PIPING DOES NOT INTERFERE WITH NEW SOFFIT. B. REVISE CONTRACT DRAWINGS A100, MP100 AND M502 (BASEMENT PLUMBING PLAN), (REF RFI-0124) TO ADD A PLAN NOTE TO REPLACE WORN-OUT WATER HEATER DUE TO RUSTY CORROSION. C. REVISE CONTRACT DRAWING MP100 (BASEMENT PLUMBING PLAN), (REF RFI-0125). ADD NOTE # 18 WHICH READS AS FOLLOWS: "INSTALL P-I PRIMER AUTOMATIC TRAP PRIMER VALVE IN BOILER ROOM". D. REVISE CONTRACT DRAWING E201 (CHAPEL MAIN FLOOR PLAN), (REF RFI-0129) TO ADD A PLAN NOTE FOR EXTERIOR LIGHTING LOADS. PROVIDE NEW BRANCH CIRCUIT CONDUIT (GRC/EMT/PVC) AND WIRING FROM NEW PANEL "F" TO NEW PHOTO-ELECTRIC SENSOR, AND INTERCEPT EXISTING POLE LIGHTS, CHAPEL ENTRY LIGHTS AND READER BOARD. E. REVISE CONTRACT DRAWING S104 (ROOF PLAN ANNEX), (REF RFI-0130) TO ADD A PLAN NOTE FOR EXTERIOR SECURITY LIGHTING LOAD. PROVIDE NEW BRANCH CIRCUIT CONDUIT (GRC/EMT) AND WIRING FROM NEW PANEL "B" TO INTERCEPT FLOODLIGHT FIXTURES ON ANNEX BUILDING ROOF. F. REFERENCE PLATE NO. A100, ADD NOTE,"IN ASSEMBLY ROOM B13, REMOVE EXISTING HEAT AND SMOKE DETECTION WIRING FOR HVAC SYSTEM CURRENTLY WRAPPED AROUND THE HOT WATER PIPING". RE-ROUTE NEW WIRING IN NEW T-BAR CEILING BETWEEN GRIDLINES "02" AND "04", AND PARALLEL TO GRIDLINES "C" AND "I". G. REFERENCE PLATE NO. A103, DRESSING ROOM'S A213 AND A214. ROOM A213: FURR OUT WALL TO MATCH EXISTING, WHERE ONCE REMOVED DUCT WORK. ROOM A214: REPAIR AND LEVEL FLOOR. REMOVE LATH AND PLASTER, AND FURR-OUT WALLS TO MATCH EXISTING CONDITIONS. H. REFERENCE PLATE NO. A-401, DETAILS C4&C5. ARTISTIC FEATURE NEXT TO WHEEL-CHAIR LIFT: REMOVE EXISTING FLUORESCENT STRIP-LIGHTING" FIXTURES AND REPLACE WITH LED LIGHT FIXTURES OR EQUAL. 9K. ' 8 I) REFERENCE PLATE NO.A401, DETAIL C1 AND PLATE NO. A101, GRID LINE "C" AND "01" LINE. ADD NOTE,"FURR-OUT WALLS FROM BASEMENT TO CEILING AND CONCEAL RED-BRICKS. J. REFERENCE PLATE NO.A101, LOBBY ROOM A100. GRID LINE "6A". ADD NOTE,"FURR-OUT WALLS FROM BASEMENT TO CEILING AND CONCEAL RED-BRICKS. K. REFERENCE PLATE NO. A103, ASSEMBLY ROOM A211. FURR-OUT WALL ALONG GRIDLINE GA TO ACCEPT WOOD WALL PANELS FROM FLOOR TO CEILING.
  • $23,095 - Friday the 5th of October 2012
    Department Of Army
    W071 ENDIST SEATTLE
    CONTRACT FOR MAIN POST CHAPEL RENOVATION AT JBLM, WA. REFERENCE NO. R00005 FL006 MISCELLANEOUS REPAIRS&CORRECTIONS 1. REVISE CONTRACT DRAWING E-502 TO SHOW A NEW DEDICATED BRANCH CIRCUIT 120/208Y IN PANEL F FOR THE ORGAN BLOWER. PROVIDE NEW CONDUIT AND WIRING FOR THIS CIRCUIT FROM PANEL F, TO INTERCEPT ORGAN BLOWER IN CHAPEL ROOM 201 (REF. RFI-0069). 2. ADD CONSTRUCTION NOTE TO DRAWING FA-401 3. ADD CONSTRUCTION NOTE TO DRAWING FA-301 4. ADD CONSTRUCTION NOTE TO DRAWING FA-302 5. REVISE DRAWING E-203 TO MOVE PANEL B TO THE SOUTH APPROXIMATELY 24". INSTALL NEW FEEDER CABLE AND PROVIDE TERMINATION AS REQUIRED (REF. RFI-0083). 6. REVISE DRAWING E-101 TO SHOW AN EU IN STORAGE ROOM A105 (REF. RFI-0090). 7. REVISE DRAWING E505 TO SHOW THAT FIXTURE TYPE F3 IS TO INCLUDE A DIMMING BALLAST (REF. RFI-0092). 8. REVISE DRAWING MH-103 TO SHOW A RADIANT WALL HEATER IN EACH OF THE NEW RESTROOMS A-208 AND A-209. EACH HEATERS SHALL BE SIMILAR TO RH-16 (DRAWING-602), 2'-0: LONG, WITH AN OUTPUT OF 2,476 BTU. INSTALL AT THE WEST END OF EACH REST ROOM BELOW THE WINDOWS. PROVIDE 3/4" HWS&R BRANCH LINES FROM THE 2" HWS&R RISERS IN THE 2ND FLOOR CHASE NORTH OF THE KITCHEN. INSTALL THE WALL HEATERS PER DETAIL 7/M604. PROVIDE ONE NEW TEMPERATURE SENSOR FOR EACH HEATER LOCATED ADJACENT TO DOORS A208 AND A209, AND COORDINATE WITH LIGHT SWITCH LOCATIONS. CONCEAL PIPING AND CONTROL WIRING ABOVE CEILING AND IN THE PLUMBING CHASES BEHIND THE TOILETS. (REF. RFI-0103). 9. ON DRAWING M-402, REVISE BOTH SUPPLY DUCTS THROUGH THE WALL TO 43.5" X 15.5" WITH 1" SOUNDLINING, THEN TRANSITION TO 48" X 15" WITH 1" SOUNDLINING (PER MH-100) THROUGH THE SQUARE-THROATED RECTANGULAR ELBOWS WITH TURNING VANES ON NORTH SIDE OF THE WALL BETWEEN THE BOILER ROOM B17 AND ASSEMBLY ROOM B13 (REF. RFI-0107). 10. ADD A FLAG NOTE TO DRAWING M-402 WHICH REQUIRES REPLACEMENT OF THE EXISTING CLEANOUT IN MEN'S RESTROOM A-109 (REF. RFI-0109). 11. ADD A FLAG NOTE TO DRAWING M-403 WHICH REQUIRES REPLACEMENT OF EXISTING 3" PIPING FOR THE ANNEX KITCHEN LOCATED IN THE OVERHEAD OF ROOM A-106 (REF. RFI-0115). 12. ADD A FLAG NOTE TO DRAWING MP-100 WHICH REQUIRES REPLACEMENT OF THE FLOOR DRAINS IN ROOMS B-01 AND MECHANICAL ROOM B-02 (REF. RFI-0115). 13. ADD DETAIL TO DRAWING S-100 WHICH SHOWS 3 HOLES, AT 6" DIAMETER CORED THROUGH HORIZONTAL BEAM IN ASSEMBLY ROOM B13. THESE HOLES ARE PROVIDED FOR THE ROUTING OF FIRE SUPPRESSION PIPING AND ELECTRICAL CABLES (REF. RFI-0116).
  • $13,723 - Friday the 5th of October 2012
    Department Of Army
    W071 ENDIST SEATTLE
    CONTRACT FOR MAIN POST CHAPEL RENOVATION AT JBLM, WA. REFERENCE NO. R00002 FL003 ARCHITECTURAL&ELECTRICAL CHANGES 1. REVISE CONTRACT DRAWING ED-201 TO SHOW THE EXISTING SOUND ENERGY 12" X 12" JBOX IN WORK ROOM 109. ADD A REFERENCE NOTE TO ED-201 WHICH REQUIRES THAT THE JBOX AND ASSOCIATED CONDUIT/WIRING IS TO BE DEMOLISHED (REF. RFI-0018). 2. REVISE CONTRACT DRAWING ED-200 TO SHOW THE ADDITIONAL TWO 120 VOLT OUTLETS IN ROOM B13 THAT ARE NOT CURRENTLY DEPICTED. ADD A REFERENCE NOTE TO ED-200 WHICH REQUIRES THAT THESE TWO OUTLETS AND ASSOCIATED CONDUIT/WIRING ARE TO BE DEMOLISHED (REF. RFI-0025). 3. REVISE CONTRACT DRAWING ED-200 TO SHOW THE ADDITIONAL FOUR 120 VOLT OUTLETS IN ROOM B07 THAT ARE NOT CURRENTLY DEPICTED. ADD A REFERENCE NOTE TO ED-200 WHICH REQUIRES THAT THESE FOUR OUTLETS AND ASSOCIATED CONDUIT/WIRING ARE TO BE DEMOLISHED (REF. RFI-0026). 4. REVISE FLOOR PLAN NOTE F06 ON CONTRACT DRAWING A-001 AS FOLLOWS (REF. RFI-0038): A. RELOCATE THE EXISTING ORGAN PANEL FROM THE WEST SIDE OF MEMORIAL ROOM 112 TO THE EAST SIDE OF THE ROOM. B. RELOCATE THE ENTRY DOORWAY OF MEMORIAL ROOM 112 UP AND TO THE WEST TO ALLOW FOR RAISING OF THE FLOOR IN THIS AREA AND TO CLEAR THE ORGAN COMPONENTS LOCATED ABOVE THE EXISTING DOORWAY. PROVIDE TYPICAL WALL DOOR FRAMING, 2X4 DOUBLE JAMBS WITH (2) 2X6 HEADERS BEARING ON THE 2X4'S. THE RELOCATED DOORWAY SHALL BE THE SAME SIZE AS THE EXISTING DOORWAY. C. SHORTEN THE DOOR FOR CLOSET ROOM 113 TO ALLOW FOR RAISING OF THE FLOOR IN THIS AREA. 5. AMEND REFERENCE NOTE 3 ON CONTRACT DRAWING E-500 TO REQUIRE A FLOATING NEUTRAL BUS BAR AND A SEPARATE BUS BAR IN BACK-FED PANEL MP (REF. RFI-0044). 6. REVISE CONTRACT DRAWING FA-301 TO SHOW THE HOLD-OPENS DEPICTED ON E-200, AND DRAWING FA-402 TO SHOW THE HOLD-OPENS DEPICTED ON E-203. ADD (2) 120 VOLT FA CONTROL OUTPUT RELAYS AND CONNECT TO EXISTING FIRE ALARM SYSTEM (REF. RFI-0046). 7. REVISE CONTRACT DRAWING A-602 TO INCLUDE A DETAIL FOR TRANSOMS ABOVE DOORWAYS DEPICTED IN A1/A210 AND A4/A210. ADD TO WINDOW SCHEDULE ON A-602 WITH SCHEDULE NOTE [7] INCLUDED IN THE NOTES COLUMN (PROVIDE FIXED STORM WINDOW). (REF. RFI-0051). 8. REVISE CONTRACT DRAWING A-102 TO SHOW THE EAST WALL OF NEW ELECTRICAL ROOM 108 APPROXIMATELY 2'-6" TO THE EAST OF THE CURRENTLY SPECIFIED LOCATION TO THE EXISTING COLUMN (REF. RFI-0061).
  • $131,623 - Friday the 5th of October 2012
    Department Of Army
    W071 ENDIST SEATTLE
    MAIN POST CHAPEL RENOVATION
  • $1,098,551 - Friday the 5th of October 2012
    Department Of Army
    W071 ENDIST SEATTLE
    PACKAGED LIFT STATION

© Copyright 2019
The Collier Report
published by 1918 Media LLC.
Information displayed in this dossier has been provided through available open source or public sources. No reliance should be made by readers or Collier Report subscribers. Funding actions are complicated and do not always represent dollar-for-dollar payments to vendors nor do they represent payments in certain instances. Requests for the modification of displayed information may be made to help.desk@1918.media.