Pnk Constructors Llc

  • Pnk Constructors Llc

  • View government funding actions
  • Coalville, UT 840179751
  • Phone: 435-336-8010
  • Estimated Number of Employees: 12
  • Estimated Annual Receipts: $7,174,465
  • Business Start Date: 2004
  • Contact Person: Jimmie Keyes
  • Contact Phone: 801-699-1400
  • Contact Email: jkeyes.pnk@allwest.net
  • Business Structure:
  • Sole Proprietorship
  • Business Type:
  • For Profit Organization
  • Limited Liability f
  • Industries Served: Highway, Street, and Bridge Construction, Other Heavy and Civil Engineering Construction
  • Product Areas: PASSENGER MOTOR VEHICLES, FIRE FIGHTING EQUIPMENT, MOTOR VEHICLE MAINT EQ, MOTOR VEHICLE MAINTENANCE AND REPAIR SHOP SPECIALIZED EQUIPMENT, INSPECT SVCS/FIRE-RESCUE-SAFETY EQ, INSPECTION- FIRE FIGHTING/RESCUE/SAFETY EQUIPMENT; ENVIRON PROTECT EQUIPMENT/MATLS, MAINT/REPAIR/REBUILD OF EQUIPMENT- FIRE CONTROL EQUIPMENT, MAINT-REP OF FIRE CONT EQ, MAINT/REPAIR/REBUILD OF EQUIPMENT- GROUND EFFECT VEHICLES, MOTOR VEHICLES, TRAILERS, AND CYCLES, MAINT-REP OF VEHICLES-TRAILERS-CYC, MAINT-REP OF VEHICULAR EQ, MAINT/REPAIR/REBUILD OF EQUIPMENT- VEHICULAR EQUIPMENT COMPONENTS, MAINT/REPAIR/REBUILD OF EQUIP- FIRE FIGHTING/RESCUE/SAFETY EQUIP; ENVIRON PROTECT EQUIP/MATLS, MAINT-REP OF FIRE-RESCUE-SAFETY EQ, MODIFICATION OF EQUIPMENT- FIRE CONTROL EQUIPMENT, MOD OF FIRE CONT EQ, MODIFICATION OF EQUIPMENT- GROUND EFFECT VEHICLES, MOTOR VEHICLES, TRAILERS, AND CYCLES, MOD OF VEHICLES-TRAILERS-CYC, MODIFICATION OF EQUIPMENT- FIRE FIGHTING/RESCUE/SAFETY EQUIPMENT; ENVIRON PROTECT EQUIPMENT/MATLS, MOD OF FIRE-RESCUE-SAFETY EQ, INSTALLATION OF EQUIPMENT- FIRE CONTROL EQUIPMENT, INSTALL OF FIRE CONT EQ, INSTALLATION OF EQUIPMENT- GROUND EFFECT VEHICLES, MOTOR VEHICLES, TRAILERS, AND CYCLES, INSTALL OF VEHICLES-TRAILERS-CYC, INSTALL OF VEHICULAR EQ, INSTALLATION OF EQUIPMENT- VEHICULAR EQUIPMENT COMPONENTS, INSTALLATION OF EQUIPMENT- FIRE FIGHTING/RESCUE/SAFETY EQUIPMENT; ENVIRON PROTECT EQUIPMENT/MATLS, INSTALL OF FIRE-RESCUE-SAFETY EQ

Sampling of Federal Government Funding Actions/Set Asides

In order by amount of set aside monies.

  • $80,923 - Saturday the 8th of September 2012
    Bureau Of Reclamation
    SALT LAKE CITY REGIONAL OFFICE
    CONSTRUCTION SERVICES TO UPGRADE SEISMIC STANDARDS OF ECHO DAM TO WITHSTAND EARTHQUAKE BY EXCAVATING DOWNSTREAM AND UPSTREAM PART OF THE DAM AND REFILLING IT WITH SUITABLE MATERIAL. MOD NO. 0008 IS TO REMOVE APPROXIMATELY 4,200 CUBIC YARDS OF EXCESS MATERIAL FROM LEFT SIDE OF SPILLWAY AND RELOCATE FENCE OUT OF EXCAVATION AREA.
  • $4,976 - Tuesday the 18th of September 2012
    Bureau Of Reclamation
    SALT LAKE CITY REGIONAL OFFICE
    CONSTRUCTION SERVICES TO UPGRADE SEISMIC STANDARDS OF ECHO DAM TO WITHSTAND EARTHQUAKE BY EXCAVATING DOWNSTREAM AND UPSTREAM PARTS OF THE DAM AND REFILLING IT WITH SUITABLE MATERIAL. MOD NO. 0010 IS TO ADD 2-FOOT CONCRETE RING SECTIONS TO INSPECTION WELLS 1, 2, 5, AND 6.
  • $31,654 - Thursday the 26th of July 2012
    Bureau Of Reclamation
    SALT LAKE CITY REGIONAL OFFICE
    CONSTRUCTION SERVICES TO UPGRADE SEISMIC STANDARDS OF ECHO DAM TO WITHSTAND EARTHQUAKE BY EXCAVATING DOWNSTREAM AND UPSTREAM PART OF THE DAM AND REFILLING IT WITH SUITABLE MATERIAL. MOD NO. 0007 IS TO FURNISH AND INSTALL DRAIN ROCK BETWEEN STATIONS 1+00 AND 12+00 AT ECHO DAM.
  • $315,324 - Friday the 22nd of June 2012
    Bureau Of Reclamation
    SALT LAKE CITY REGIONAL OFFICE
    CONSTRUCTION SERVICES TO UPGRADE SEISMIC STANDARDS OF ECHO DAM TO WITHSTAND EARTHQUAKES BY EXCAVATING DOWNSTREAM AND UPSTREAM PART OF THE DAM AND REFILLING IT WITH SUITABLE MATERIAL. MOD NO. 0005 ADDS UP TO MAXIMUM OF 6 SUMP PUMPS FOR DEWATERING SYSTEM SO CONTRACTOR CAN EXCAVATE AND BACKFILL.
  • $2,324 - Tuesday the 5th of June 2012
    Bureau Of Reclamation
    SALT LAKE CITY REGIONAL OFFICE
    CONSTRUCTION SERVICES TO UPGRADE SEISMIC STANDARDS OF ECHO DAM TO WITHSTAND EARTHQUAKES BY EXCAVATING DOWNSTREAM AND UPSTREAM PART OF THE DAM AND REFILLING IT WITH SUITABLE MATERIAL.
  • $18,240 - Friday the 29th of June 2012
    Bureau Of Reclamation
    SALT LAKE CITY REGIONAL OFFICE
    CONSTRUCTION SERVICES TO UPGRADE SEISMIC STANDARDS OF ECHO DAM TO WITHSTAND EARTHQUAKE BY EXCAVATING DOWNSTEAM AND UPSTREAM PART OF THE DAM AND REFILLING IT WITH SUITABLE MATERIAL. MOD NO. 0006 INCREASES AND DECREASES EXCAVATION AND BACKFILL MATERIAL DUE TO SLIGHT CHANGES IN THE STATION NUMBERS OF 2 DRAWINGS.
  • $162,123 - Monday the 5th of December 2011
    Bureau Of Reclamation
    SALT LAKE CITY REGIONAL OFFICE
    PURPOSE OF CONTRACT IS TO UPGRADE THE SEISMIC STANDARDS OF ECHO DAM TO WITHSTAND EARTHQUAKES BY EXCAVATING THE DOWNSTREAM AND UPSTREAM PART OF THE DAM AND REFILLING IT WITH SUITABLE MATERIALS.
  • $1,490 - Wednesday the 19th of October 2011
    Bureau Of Reclamation
    SALT LAKE CITY REGIONAL OFFICE
    PURPOSE OF CONTRACT IS TO UPGRADE THE SEISMIC STANDARDS OF ECHO DAM TO WITHSTAND EARTHQUAKES BY EXCAVATING THE DOWNSTREAM AND UPSTREAM PART OF THE DAM AND REFILLING IT WITH SUITABLE MATERIALS.
  • $1,202,213 - Monday the 17th of September 2012
    Bureau Of Reclamation
    SALT LAKE CITY REGIONAL OFFICE
    CONSTRUCTION SERVICES TO UPGRADE SEISMIC STANDARDS OF ECHO DAM TO WITHSTAND EARTHQUAKE BY EXCAVATING DOWNSTREAM AND UPSTREAM PART OF THE DAM AND REFILLING IT WITH SUITABLE MATERIAL. MOD NO. 0009 IS TO FURNISH AND PLACE RIPRAP, RIPRAP BEDDING, AND SLOPE PROTECTION TO PROVIDE STABILITY TO ECHO DAM.

© Copyright 2019
The Collier Report
published by 1918 Media LLC.
Information displayed in this dossier has been provided through available open source or public sources. No reliance should be made by readers or Collier Report subscribers. Funding actions are complicated and do not always represent dollar-for-dollar payments to vendors nor do they represent payments in certain instances. Requests for the modification of displayed information may be made to help.desk@1918.media.