The Collier Report of U.S. Government Contracting

Old School Reporting Using Modern Technology

Opn Architects Inc

Sampling of Federal Government Funding Actions/Set Asides

In order by amount of set aside monies.

  • $6,349 - Wednesday the 4th of January 2012
    Public Buildings Service
    GSA/PUBLIC BUILDINGS SERVICE
    PROVIDE DSIGN AND DOCUMENT SERVICES FOR OPN AND CONSULTANTS (KJWW, CCI) AS NECESSARY TO REVISE FLOOR PLANS, ENGINEERING AND SYSTEMS CHANGES AS REQUIRED AND APPROVED PER THE U.S. ATTORNEY REQUEST(S). SEE SOW FOR ITC-096.
  • $5,885 - Monday the 9th of January 2012
    Public Buildings Service
    GSA/PUBLIC BUILDINGS SERVICE
    PROVIDE DESIGN AND DOCUMENT SERVICES FOR OPN AND CONSULTANTS (KJWW AND LE MESSIEUR) AS NECESSARY TO REVISE CEILING PLANS, ENGINEERING AND SYSTEMS CHANGES AS REQURED TO ACCOMMODATE THE ART IN ARCHITECTURE CHANGES.
  • $5,862 - Monday the 9th of January 2012
    Public Buildings Service
    GSA/PUBLIC BUILDINGS SERVICE
    PROVIDE DESIGN AND DOCUMENT SERVICES FOR OPN AND CONSULTANTS (KJWW, CCI) AS NECESSARY TO REVISE FLOOR PLANS, ENGINEERING AND SYSTEMS CHANGES AS REQUIRED AND APPROVED PER THE U.S. ATTORNEY REQUEST(S).
  • $5,648 - Friday the 30th of March 2012
    Public Buildings Service
    GSA/PUBLIC BUILDINGS SERVICE
    WORK DELIVERED UNDER THIS ACTION INCLUDES BUT IS NOT LIMITED TO: PROVIDE DESIGN AND DOCUMENT SERVICES AS NECESSARY TO REVISE FLOOR PLANS, ENGINEERING AND SYSTEMS CHANGES AS REQUESTED AND APPROVED.
  • $193,963 - Friday the 18th of May 2012
    Public Buildings Service
    GSA/PUBLIC BUILDINGS SERVICE
    PROVIDE PROFESSIONAL SERVICES TO EXTEND CONSTRUCTION ADMINISTRATION PHASE THROUGH 8/10/12.
  • $15,850 - Wednesday the 4th of January 2012
    Public Buildings Service
    GSA/PUBLIC BUILDINGS SERVICE
    THIS MODIFICATION WAS INITIALLY ISSUED AS A PDL TO PROVIDE FOR THE FOLLOWING ADDITIONAL ENGINEERING SERVICES ASSOCIATED WITH CHANGES TO THE SECURITY SYSTEM DESIGN RECEIVED FROM ADT AND THE USMS: A) ENGINEERING AND MEETING TIME WITH THE PROJECT TEAM, THE ADT REPRESENTATIVES, AND THE USMS. B) ENGINEERING DESIGN AND DOCUMENT SERVICES FOR THE SECURITY SYSTEM INFRASTRUCTURE CHANGES TO ACCOMODATE REFERENCED CHANGES. ALL REVISED INFRASTRUCTURE WILL BE ISSUED AS AN INSTRUCTIONS TO CONTRACTORS. NO EXTENSION OF TIME IS INCLUDED WITHIN.
  • $15,387 - Tuesday the 27th of December 2011
    Public Buildings Service
    GSA/PUBLIC BUILDINGS SERVICE
    PROVIDE ADDITIONAL SERVICES AS FOLLOWS: PROVIDE MEASUREMENT AND VERIFICATION SERVICES FOR ENERGY AND EQUIPMENT PERFORMANCE DURING THE ONE YEAR MONITORING PERIOD REQUIRED FOR LEED CERTIFICATION. AE CONSULTANTS TO COORDINATE WORK WITH GSA MANAGEMENT.
  • $13,956 - Friday the 17th of August 2012
    Public Buildings Service
    GSA/PUBLIC BUILDINGS SERVICE
    PS77 IS BEING ISSUED TO FUND VARIOUS DESIGN UPDATES.
  • $11,973 - Tuesday the 27th of December 2011
    Public Buildings Service
    GSA/PUBLIC BUILDINGS SERVICE
    PROVIDE ADDITIONAL SERVICES AS FOLLOWS: A) REVISE CONTRACT DOCUMENTS TO REFLECT INFRASTRUCTURE CHANGES AS REQUIRED BY CHANGE IN AV DESIGN AND TELECOMMUNICATIONSS' DESIGN. B) ISSUANCE OF REVISED ITC. C) COORDINATION WITH CONSULTANTS INCLUDING SMITH&BOUCHER AND SPECTRUM ENGINEERING.
  • $11,559 - Monday the 19th of December 2011
    Public Buildings Service
    GSA/PUBLIC BUILDINGS SERVICE
    REIMBURSE USGBC INVOICE #90600374 FOR DESIGN CREDIT SUBMITTAL FOR LEED NC2.1 CERTIFICATION, PLUS ASSOCIATED SHIPPING COSTS.

© Copyright 2019
The Collier Report
published by 1918 Media LLC.
Information displayed in this dossier has been provided through available open source or public sources. No reliance should be made by readers or Collier Report subscribers. Funding actions are complicated and do not always represent dollar-for-dollar payments to vendors nor do they represent payments in certain instances. Requests for the modification of displayed information may be made to help.desk@1918.media.