The Collier Report of U.S. Government Contracting

Old School Reporting Using Modern Technology

Northwest Hydraulic Consultants Inc

  • Northwest Hydraulic Consultants Inc

  • View government funding actions
  • West Sacramento, CA 956913480
  • Phone:
  • Corporate URL: www.nhcweb.com
  • Estimated Number of Employees: 100
  • Estimated Annual Receipts: $14,973,729
  • Business Start Date: 1979
  • Contact Person: Daniel Airola
  • Contact Phone: 916-371-7400
  • Contact Email: dairola@nhcweb.com
  • Business Structure:
  • Corporate Entity (Not Tax Exempt)
  • Business Type:
  • Foreign Owned and Located
  • For Profit Organization
  • Industries Served: Engineering Services, Computer Systems Design Services
  • Product Areas: MAT HANDLING EQ - NONSELF-PROPELLED, MATERIAL HANDLING EQUIPMENT, NONSELF-PROPELLED, MISC MATERIALS HANDLING EQ, MISCELLANEOUS MATERIALS HANDLING EQUIPMENT, QUALITY CONTROL- MATERIALS HANDLING EQUIPMENT, QUALITY CONT SV/MATERIAL HANDLIN EQ, EQ TEST SVCS/MATERIALS HANDLING EQ, EQUIPMENT AND MATERIALS TESTING- MATERIALS HANDLING EQUIPMENT, EQ TEST SVCS/ROPE-CABLE-CHAIN, EQUIPMENT AND MATERIALS TESTING- ROPE, CABLE, CHAIN, AND FITTINGS, EQUIPMENT AND MATERIALS TESTING- HAND TOOLS, EQ TEST SVCS/HAND TOOLS, INSPECT SVCS/MATERIALS HANDLING EQ, INSPECTION- MATERIALS HANDLING EQUIPMENT, MAINT-REP OF MATERIALS HANDLING EQ, MAINT/REPAIR/REBUILD OF EQUIPMENT- MATERIALS HANDLING EQUIPMENT, MOD OF MATERIALS HANDLING EQ, MODIFICATION OF EQUIPMENT- MATERIALS HANDLING EQUIPMENT, MOD OF ROPE-CABLE-CHAIN, MODIFICATION OF EQUIPMENT- ROPE, CABLE, CHAIN, AND FITTINGS, TECHNICAL REPRESENTATIVE- ROPE, CABLE, CHAIN, AND FITTINGS, TECH REP SVCS/ROPE-CABLE-CHAIN, INSTALL OF MATERIALS HANDLING EQ, INSTALLATION OF EQUIPMENT- MATERIALS HANDLING EQUIPMENT, LEASE-RENT OF MATERIALS HANDLING EQ, LEASE OR RENTAL OF EQUIPMENT- MATERIALS HANDLING EQUIPMENT

Sampling of Federal Government Funding Actions/Set Asides

In order by amount of set aside monies.

  • $43,841 - Friday the 18th of November 2011
    Department Of Army
    W075 ENDIST SACRAMENTO
    PROJECT TITLE AND LOCATION: SACRAMENTO RIVER SEDIMENT STUDY, PHASE II, CA; THE PURPOSE OF THIS MODIFICATION IS TO ADD CLIN 0005 FOR TASKS 17-19, AND CLINS 0006-0008 FOR OPTIONAL TASK 3.
  • $16,047 - Thursday the 31st of May 2012
    Department Of Army
    W075 ENDIST SACRAMENTO
    PROJECT TITLE AND LOCATION: SACRAMENTO RIVER SEDIMENT STUDY, PHASE II, CA (AMERICAN RIVER WATERSHED COMMON FEATURES GRR, SACRAMENTO, CA). THE PURPOSE OF THIS MODIFICATION IS TO ADD WORK WITHIN SCOPE ON ADDITIONAL CONTRACT LINE ITEMS NUMBERS (CLIN)S.
  • $12,070 - Thursday the 26th of July 2012
    Department Of Army
    W075 ENDIST SACRAMENTO
    THIS CONTRACT PROVIDES FOR THE INCORPORATION OF THE EXNER 7 BED MIXING ALGORITHM IN TO THE HYDROLOGIC ENGINEERING CENTER'S RIVERSHED ANALYSIS SUITE OF SOFTWARE.

© Copyright 2019
The Collier Report
published by 1918 Media LLC.
Information displayed in this dossier has been provided through available open source or public sources. No reliance should be made by readers or Collier Report subscribers. Funding actions are complicated and do not always represent dollar-for-dollar payments to vendors nor do they represent payments in certain instances. Requests for the modification of displayed information may be made to help.desk@1918.media.