Northern Taiga Ventures Inc

Sampling of Federal Government Funding Actions/Set Asides

In order by amount of set aside monies.

  • $9,993 - Friday the 20th of January 2012
    Department Of Army
    W2SD ENDIST BALTIMORE
    BUILDING 9960 CHILLER PLANT UPGRADE AU CT 1&2 VFDS PAD ADDITION&PANEL RELO ITEM 1. FURNISH LABOR, MATERIALS AND EQUIPMENT NECESSARY TO PROVIDE CONCRETE HOUSEKEEPING PADS UNDER THE COOLING TOWER 1&2 VFDS TO ALLOW THE RESINOUS FLOORING TO HAVE A PROPER TERMINATION POINT. ITEM 2. FURNISH LABOR, MATERIALS AND EQUIPMENT NECESSARY TO RELOCATE PNL N41-AH14.6 TO MAKE SPACE FOR EXISITNG CHEMICAL CABINET AND ALLOW USABLE ACCESS TO EXISITNG GATE VALVE. EXTEND CONTROL CONDUIT FROM TOP OF VFDS AT COOLING TOWER 1 TO DIRECTLY OVERHEAD AND MEET EXISITNG CONTROL CONDUITS WITH A 4X4 PULL BOX.
  • $9,859 - Wednesday the 16th of November 2011
    Department Of Army
    W2SD ENDIST BALTIMORE
    BUILDING 9960 CHILLER PLANT UPGRADE-FIELD MODIFICATION P00037 BN BY CC CG
  • $9,224 - Wednesday the 4th of January 2012
    Department Of Army
    W2SD ENDIST BALTIMORE
    BUILDING 9960 CHILLER PLANT UPGRADE BP CHANGE MAKEUP WATER VALVES FROM 1" TO 2" FURNISH ALL LABOR, MATERIAL, AND EQUIPMENT TO INSTALL 2" AUTOMATED BALL VALVES IN THE CHILLED WATER MAKEUP LINE IN LIEU OF 1" AS SHOWN ON CONTRACT DRAWINGS. BU INSTALL BACKFLOW PREVENTER ON FP C-13 FURNISH ALL LABOR, MATERIAL, AND EQUIPMENT TO INSTALL AN ASSE 1013/AWWA C511 REDUCED PRESSURE PRINCIPLE BACKFLOW PREVENTER ON THE 2" MAKEUP WATER LINE CONNECTING TO FILTER PUMP FP C-13. CB REPLACE CH 5 GASKETS FURNISH LABOR, MATERIALS, AND EQUIPMENT NECESSARY TO PROVIDE NEW GASKETS ON CONDENSER AND EVAPORATOR HEADS AFTER COMMISSIONING HAS BEEN PERFORMED AND HEADS ARE REMOVED FOR INSPECTION BY AGENCY.
  • $8,667 - Wednesday the 11th of January 2012
    Department Of Army
    W2SD ENDIST BALTIMORE
    BUILDING 9960 CHILLER PLANT UPGRADE CY STAGGER CHILLER START IF TES IS CHARGED FURNISH ALL LABOR, MATERIAL, AND EQUIPMENT NECESSARY TO INCORPORATE THE THERMAL ENERGY STORAGE (TES) TANK AVAILABILITY INTO THE CHILLER STAGING WHEN COMING OUT OF AN EMERGENCY (EPO BUTTON IS PRESSED), FOR THE BLACK START AND AFTER A RETURN TO NORMAL POWER. START AND PROVE THE CHILLERS ONE AT A TIME LETTING THEM TAKE THE LOAD FOR 5 MINUTES (ADJ) BETWEEN STARTS IF THE 10TH TEMPERATURE SENSOR (ADJ) FROM THE BOTTOM OF THE TANK IS BELOW 45 DEGREES (ADJ).
  • $8,286 - Thursday the 19th of January 2012
    Department Of Army
    W2SD ENDIST BALTIMORE
    BUILDING 9960 CHILLER PLANT UPGRADE 00002 REMOVE OR RELOCATE CENTRAL VACUUM SYSTEM FURNISH LABOR, MATERIALS AND EQUIPMENT NECESSARY TO ACCOMMODATE CUSTOMER'S REQUEST CONCERNING LEAVING THE CENTRAL VACUUM SYSTEM IN PLACE AND RELOCATING THE PROPOSED CRAC E-12 VERSUS REMOVING THE EXISTING CENTRAL VACUUM SYSTEM PER THE CONTRACT DOCUMENTS. AV REPLACE CH 2 GASKETS FURNISH LABOR, MATERIALS, AND EQUIPMENT NECESSARY TO PROVIDE NEW GASKETS ON CONDENSER AND EVAPORATOR HEADS AFTER COMMISSIONING HAS BEEN PERFORMED AND HEADS ARE REMOVED FOR INSPECTION BY AGENCY. BD FIREPROOFING INSTALLATION FURNISH LABOR, MATERIALS AND EQUIPMENT TO INSTALL FIRE PROOFING ON THE AREAS WHERE PATCHING IS REQUIRED DUE TO HANGER CONNECTIONS OR DETERIORATION FROM BEAM STIFFNESS OCCURRING PRIOR TO COMMENCEMENT OF WORK ON THIS CONTRACT.
  • $8,223 - Tuesday the 20th of December 2011
    Department Of Army
    W2SD ENDIST BALTIMORE
    BUILDING 9960 CHILLER PLANT UPGRADE - FIELD CHANGES "CK" - ADD BOLLARDS AND STEPS AT LANDING, AND "CP" - REPLACE CHILLER 6 GASKETS
  • $649,758 - Wednesday the 4th of January 2012
    Department Of Army
    W2SD ENDIST BALTIMORE
    BUILDING 9960 CHILLER PLANT UPGRADE REFERENCE NO. R00031 BR CONSTRUCTION BULLETIN #7 CONTRACTOR TO FURNISH ALL LABOR, MATERIALS AND EQUIPMENT REQUIRED TO PERFORM THE WORK ASSOCIATED WITH THE CHANGE IN THE CHILLED WATER RETURN (CHWR) PIPING CONNECTION POINT FOR THE THERMAL ENERGY STORAGE (TES) TANK AS PER CONSTRUCTION BULLETIN 7, OPTION 1. WORK ALSO INCLUDES INSTALLATION OF AN ADDITIONAL 24" ISOLATION VALVE FOR THE FLOW METER IN THE CURRENT DECOUPLER PIPING AND INSTALLING THE NEW 24" CHWR PIPING IN THE CORRIDOR BEHIND ALL THE PRIMARY CHILLED WATER PUMPS, INCLUDING PUMPS 1 AND 2, BELOW THE EXISTING 16" CHILLED WATER LINES.
  • $60,951 - Thursday the 5th of January 2012
    Department Of Army
    W2SD ENDIST BALTIMORE
    BUILDING 9960 CHILLER PLANT UPGRADE BJ DELETE FM4 FROM TES-1 CONTRACTOR TO PROVIDE CREDIT FOR EQUIPMENT, MATERIALS, AND LABOR TO PROVIDE FM4 AT TES-1 OVERFLOW DRAIN/ PIPING. BM ADDITIONAL FILL MATERIAL FURNISH ALL LABOR, MATERIAL AND EQUIPMENT TO REMOVE 749 CY OF UNSUITABLE FILL DEPOSITS, AND REPLACE WITH SUITABLE COMPACTED STRUCTURAL FILL.
  • $6,057 - Tuesday the 3rd of April 2012
    Department Of Army
    W2SD ENDIST BALTIMORE
    BUILDING 9960 CHILLER PLANT UPGRADE DD 2" MAKEUP WATER VALVES CONTRACTOR TO FURNISH ALL LABOR, MATERIAL, AND EQUIPMENT NECESSARY TO REPLACE 2 PNUEMATIC ACTUATED GLOBE VALVES WITH MOTORIZED SPRING RETURN BALL VALVES ON THE 2" CHILLED WATER MAKEUP LINE AS REFERENCED IN CONTRACT DRAWING M-023. SCOPE OF WORK TO INCLUDE ISOLATING EXISTING VALVES, SOLDERING NEW FITTINGS, REPLACING PNUEMATIC SWITCHES IN CONTROL PANEL WITH ELECTRIC RELAYS AND PULLING NEW WIRES FOR ELECTRIC THROUGH EXISTING CONDUIT.
  • $5,894 - Wednesday the 21st of December 2011
    Department Of Army
    W2SD ENDIST BALTIMORE
    BUILDING 9960 CHILLER PLANT UPGRADE CT TES TANK SEQUENCE AND VALVE PROOF ITEM 1. FURNISH ALL LABOR, MATERIAL AND EQUIPMENT NECESSARY TO PROVE THE OPEN STATUS OF TANK ISOLATION VALVES PRIOR TO CLOSING THE DECOUPLER VALVE AND VICE VERSA. ITEM 2. FURNISH ALL LABOR, MATERIAL AND EQUIPMENT NECESSARY TO HAVE THE EMCS ALARM ON A LOW LEVEL BY BOTH THE TOP AND BOTTOM LEVEL SENSORS, AND ALSO ALARM THE MAKEUP WATER RUNNING CONTINUOUSLY. MAINTAIN THE PROVISION WHERE A SINGLE OPERATOR COMMAND WILL SWITCH THE SYSTEM BETWEEN THERMAL ENERGY STORAGE MODE AND NON-THERMAL ENERGY STORAGE MODE BUT DELETE THE AUTOMATED SWITCH FROM THE TWO MODES ON A HIGH-HIGH ALARM.

© Copyright 2019
The Collier Report
published by 1918 Media LLC.
Information displayed in this dossier has been provided through available open source or public sources. No reliance should be made by readers or Collier Report subscribers. Funding actions are complicated and do not always represent dollar-for-dollar payments to vendors nor do they represent payments in certain instances. Requests for the modification of displayed information may be made to help.desk@1918.media.