  • $9,698 - Thursday the 12th of September 2013
    Bureau Of Reclamation
    BILLINGS REGIONAL OFFICE
    MODIFICATION TO DEFINITIZE MOD 06 ISSUED AS A UNILATERAL CHANGE TO DIRECT CONTRACTOR TO PROVIDE WORK ON MACHINING AND GRINDING OF THE THRUST RUNNER UPPER GUIDE BEARING JOURNAL AND MODIFY TWO TURBINE GUIDE BEARINGS.
  • $7,500 - Thursday the 12th of September 2013
    Bureau Of Reclamation
    BILLINGS REGIONAL OFFICE
    UNILATERAL DIRECTED MODIFICATION FOR CHANGES TO RELOCATE THE LOWER BEARING BRIDGE SO THE BOTTOM VAPOR SEALS OF THE GENERATOR ARE CONCENTRIC TO THE SHAFT.
  • $7,100 - Thursday the 12th of September 2013
    Bureau Of Reclamation
    BILLINGS REGIONAL OFFICE
    CRITICAL FUNCTION THIS MODIFICATION DIRECTS THE CONTRACTOR TO PROVIDE LABOR, MATERIAL AND EQUIPMENT TO ELIMINATE THE OIL LEAK ON THE THRUST TUB; REPLACE THE GATE VALVE ON THE OIL LINE; REDESIGN AND INSTALL A NEW SEAL ON THE OIL TUB.
  • $63,080 - Thursday the 12th of September 2013
    Bureau Of Reclamation
    BILLINGS REGIONAL OFFICE
    CRITICAL FUNCTION - THIS MODIFICATION DEFINITIZES UNILATERAL MODIFICATION 0011 TO REMOVE THE TURBINE BEARING AT FLATIRON PP, BORE TO CORRECT MEASUREMENTS AND REINSTALL THE TURBINE BEARING.
  • $51,538 - Monday the 24th of February 2014
    Bureau Of Reclamation
    BILLINGS REGIONAL OFFICE
    CRITICAL FUNCTIONS - THIS MODIFICATION PROVIDE AN EQUITABLE ADJUSTMENT TO THE CONTRACTOR FOR WORK COMPLETED UNDER THE CONTRACT RELATED TO THE REPAIR OF THE SUPPORT RING TORQUED INCORRECTLY BY RECLAMATION - THE CONTRACTOR REQUESTED A REA.
  • $39,874 - Thursday the 12th of September 2013
    Bureau Of Reclamation
    BILLINGS REGIONAL OFFICE
    CLOSELY ASSOCIATED THIS MODIFICATION DEFINITIZES UNILATERAL MOD 0007 (11/12/2009)AND PROVIDES AN EQUITABLE ADJUSTMENT TO THE CONTRACTOR FOR WORK PERFORMED UNDER MOD 0007.
  • $32,292 - Thursday the 12th of September 2013
    Bureau Of Reclamation
    BILLINGS REGIONAL OFFICE
    THIS MODIFICATION DEFINITIZES MOD 008, ISSUED AS A UNILATERAL CHANGE ON 1/8/2010, TO DIRECT THE CONTRACTO TO PERFORM ABRASIVE BLAST AND COATING FOR GENERATOR 1 THRUST TUB INTERIOR.
  • $30,000 - Thursday the 12th of September 2013
    Bureau Of Reclamation
    BILLINGS REGIONAL OFFICE
    MODIFICATION TO DIRECT THE CONTRACTOR TO PROCEED WITH REPAIR OF THE UPPER GUIDE BEARING SUPPORT. PROVIDE SHOP DRAWING OF THE JACK SCREW. MANUFACTURE UPPED GUIDE BEARING JACK SCREW AND REPLACE THEM. UNILATERAL CHANGE.
  • $25,000 - Thursday the 12th of September 2013
    Bureau Of Reclamation
    BILLINGS REGIONAL OFFICE
    CRITICAL FUNCTIONS UNILATERAL MODIFICATION TO CORRECT THE UPPER GUIDE BEARING HEATING AND SHOE ALIGNMENT AND REPLACE LEAKING THRUST TUB BLONZE VALVE.

© Copyright 2019
The Collier Report
published by 1918 Media LLC.
Information displayed in this dossier has been provided through available open source or public sources. No reliance should be made by readers or Collier Report subscribers. Funding actions are complicated and do not always represent dollar-for-dollar payments to vendors nor do they represent payments in certain instances. Requests for the modification of displayed information may be made to help.desk@1918.media.