The Collier Report of U.S. Government Contracting

Old School Reporting Using Modern Technology

Lockheed Martin Services Inc

  • Lockheed Martin Services Inc

  • View government funding actions
  • Houston, TX 77058
  • Phone: 856-486-5156
  • Estimated Number of Employees: 140,000
  • Estimated Annual Receipts: $41,899,999,232
  • Business Start Date: 1993
  • Contact Person: Sandra Hutches
  • Contact Phone: 985-386-6005
  • Contact Email: SANDRA.A.PERRIN@LMCO.COM
  • Business Structure:
  • Corporate Entity (Not Tax Exempt)
  • Business Type:
  • For Profit Organization
  • Industries Served: Other Scientific and Technical Consulting Services
  • Product Areas: CARE OF REMAINS AND/OR FUNERAL SVCS, SOCIAL- CARE OF REMAINS AND/OR FUNERAL

Sampling of Federal Government Funding Actions/Set Asides

In order by amount of set aside monies.

  • $98,362 - Friday the 10th of July 2015
    National Aeronautics And Space Administration
    STENNIS SPACE CENTER
    THE NATIONAL AERONAUTICS AND SPACE ADMINISTRATION'S (NASA) JOHN C. STENNIS SPACE CENTER (SSC) REQUIRES A CONTRACTOR TO PROVIDE TEST OPERATIONS, CORE OPERATIONS AND MAINTENANCE ACTIVITIES. SUCCESSFULLY MEETING THE REQUIREMENTS OF THIS PERFORMANCE WORK STATEMENT (PWS) REQUIRES KNOWLEDGEABLE AND EXPERIENCED ENGINEERS, TECHNICIANS, TRADES AND PROJECT MANAGERS. THIS PWS INCLUDES PERFORMANCE REQUIREMENTS OF CURRENT TEST PROJECT ACTIVITIES AT SSC, SPECIFICALLY DESCRIBING WORK ACCORDING TO THE EXISTING SCOPE AND PROCESSES. CONSISTENT WITH GOALS FOR THIS EFFORT, NASA EXPECTS TO ACHIEVE CONTINUAL PROCESS IMPROVEMENTS IN THE AREAS OF SAFETY MISSION ASSURANCE, EFFICIENCY, AND BEST PRACTICES. THIS PWS REQUIRES THE CONTRACTOR TO SEEK AND DEVELOP ASSIGNED TASKS FOR INNOVATION AND STREAMLINING. THIS PWS IS ORGANIZED TO ADDRESS THE SCOPE OF THE TEST OPERATIONS CONTRACT (TOC) AT SSC. INNOVATIVE IDEAS MAY BE PROPOSED, WITH SUFFICIENT JUSTIFICATION, TO ADDRESS THE ENTIRE SCOPE OF THIS CONTRACT. THE CONTRACTOR WILL BE A SIGNIFICANT DRIVING FORCE IN IDENTIFYING AND DEVELOPING RATIONALE FOR PROCESS IMPROVEMENTS TO BE IMPLEMENTED OVER THE TERM OF THE CONTRACT. 1.0 PROJECT MANAGEMENT&ADMINISTRATION. THIS SECTION CONTAINS TASKS ASSOCIATED WITH BUSINESS AND ADMINISTRATIVE PLANNING, ORGANIZING, DIRECTING, COORDINATING, CONTROLLING AND APPROVAL ACTIONS DESIGNATED TO ACCOMPLISH OVERALL OBJECTIVES. THE CONTRACTOR SHALL PROVIDE PROJECT FORMULATION, DESIGN DEVELOPMENT, EXECUTION AND CLOSEOUT SUPPORT, FOR TEST AND OTHER PROJECTS. PROVIDE OVERALL PROJECT MANAGEMENT FOR SPECIFIC TEST PROJECTS. THE MAJORITY OF EFFORT UNDER THIS PERFORMANCE WORK STATEMENT (PWS) IS FOR PROJECT MANAGEMENT AS WELL AS SUPPORT, BUT THE CAPABILITY FOR TOTAL PROJECT MANAGEMENT WILL BE REQUIRED FOR SPECIFIC PROJECTS. ALL PROJECT MANAGEMENT AND RELATED ACTIVITIES WILL BE IN ACCORDANCE WITH SCWI-8080-0001, PROPULSION TEST PROJECT MANAGEMENT AND REFERENCED DOCUMENTS WITHIN THE WORK INSTRUCTION. THE MANAGEMENT AND ADMINISTRATION FUNCTIONS ARE THOSE NECESSARY TO SUCCESSFULLY EXECUTE TESTING AND OTHER SUPPORTING OPERATIONS AT SSC AS DESCRIBED IN THIS PWS. THE CONTRACTOR S MANAGEMENT TEAM PER DR MA02 SHALL FOCUS ON ACCOMPLISHING SAFE AND SECURE OPERATIONS USING SOUND BUSINESS PRACTICES. AN AUTOMATED INFORMATION REPORT SHALL BE SUBMITTED PER DR PT03 WHEN WARRANTED. THE MANAGEMENT TEAM SHALL EFFICIENTLY UTILIZE PERSONNEL ACROSS THE CENTER TO THE MAXIMUM EXTENT POSSIBLE, STREAMLINE AND CONSOLIDATE BUSINESS AND TECHNICAL PROCESSES. 1.1 PROJECT ADMINISTRATION: THE CONTRACTOR SHALL PERFORM TASKS ASSOCIATED WITH FACILITATING THE EXECUTION OF PROJECTS. INCLUDED ARE THE BUSINESS AND ADMINISTRATIVE OVERSIGHT, PLANNING, ORGANIZING, DIRECTING, CONTROLLING, AND APPROVAL PROCESSES USED TO ACCOMPLISH EACH PROJECT S GOALS AND MISSION.1.1.1 INTEGRATED CONTRACT TEAM THE CONTRACTOR SHALL SUPPLY AND ADMINISTER A FLEXIBLE, COMPETENT, AND QUALIFIED STAFF, TO FULLY SUPPORT AND ACCOMPLISH THE CONTRACT REQUIREMENTS. THERE SHALL BE AN ONSITE MANAGER AT SSC WHO IS A SINGLE POINT OF CONTACT FOR ALL CONTRACT OPERATIONS. THIS INDIVIDUAL WILL ACT AS PRIMARY INTERFACE BETWEEN THE CONTRACTOR AND THE NASA/SSC CONTRACTING OFFICER (CO) AND THE CONTRACTING OFFICER S TECHNICAL REPRESENTATIVE (COTR). SUBCONTRACTORS AND/OR TEAMING ARRANGEMENTS SHALL INTEGRATE THE MANAGEMENT STRUCTURE TOGETHER WITH THE CONTRACTOR. THE CONTRACTOR SHALL ALSO BE RESPONSIBLE FOR COMPREHENSIVE SUBCONTRACT MANAGEMENT. THE WORKFORCE AND WORK HOURS SHALL BE STRUCTURED TO SUCCESSFULLY SUPPORT NASA PROGRAM REQUIREMENTS AND SCHEDULES. NASA SHALL DEFINE CORE HOURS TO SUPPORT PROJECTS WHICH MAY VARY FROM ONE SHIFT A DAY FIVE DAYS A WEEK, TO POTENTIALLY 24-HOUR OPERATIONS, SEVEN (7) DAYS A WEEK. IN ADDITION, SHORT-TERM TECHNICAL TASKS, SUCH AS SPECIAL DESIGNS AND STUDIES, MAY REQUIRE PROVISION OF HIGHLY SPECIALIZED TECHNICAL PERSONNEL OR SERVICES.THE CONTRACTOR SHALL PROVIDE INTEGRATED MANAGEMENT AND ADMINISTRATIVE SERVICES
  • $836,137 - Friday the 10th of July 2015
    National Aeronautics And Space Administration
    STENNIS SPACE CENTER
    THE NATIONAL AERONAUTICS AND SPACE ADMINISTRATION'S (NASA) JOHN C. STENNIS SPACE CENTER (SSC) REQUIRES A CONTRACTOR TO PROVIDE TEST OPERATIONS, CORE OPERATIONS AND MAINTENANCE ACTIVITIES. SUCCESSFULLY MEETING THE REQUIREMENTS OF THIS PERFORMANCE WORK STATEMENT (PWS) REQUIRES KNOWLEDGEABLE AND EXPERIENCED ENGINEERS, TECHNICIANS, TRADES AND PROJECT MANAGERS. THIS PWS INCLUDES PERFORMANCE REQUIREMENTS OF CURRENT TEST PROJECT ACTIVITIES AT SSC, SPECIFICALLY DESCRIBING WORK ACCORDING TO THE EXISTING SCOPE AND PROCESSES. CONSISTENT WITH GOALS FOR THIS EFFORT, NASA EXPECTS TO ACHIEVE CONTINUAL PROCESS IMPROVEMENTS IN THE AREAS OF SAFETY MISSION ASSURANCE, EFFICIENCY, AND BEST PRACTICES. THIS PWS REQUIRES THE CONTRACTOR TO SEEK AND DEVELOP ASSIGNED TASKS FOR INNOVATION AND STREAMLINING. THIS PWS IS ORGANIZED TO ADDRESS THE SCOPE OF THE TEST OPERATIONS CONTRACT (TOC) AT SSC. INNOVATIVE IDEAS MAY BE PROPOSED, WITH SUFFICIENT JUSTIFICATION, TO ADDRESS THE ENTIRE SCOPE OF THIS CONTRACT. THE CONTRACTOR WILL BE A SIGNIFICANT DRIVING FORCE IN IDENTIFYING AND DEVELOPING RATIONALE FOR PROCESS IMPROVEMENTS TO BE IMPLEMENTED OVER THE TERM OF THE CONTRACT. 1.0 PROJECT MANAGEMENT&ADMINISTRATION THIS SECTION CONTAINS TASKS ASSOCIATED WITH BUSINESS AND ADMINISTRATIVE PLANNING, ORGANIZING, DIRECTING, COORDINATING, CONTROLLING AND APPROVAL ACTIONS DESIGNATED TO ACCOMPLISH OVERALL OBJECTIVES. THE CONTRACTOR SHALL PROVIDE PROJECT FORMULATION, DESIGN DEVELOPMENT, EXECUTION AND CLOSEOUT SUPPORT, FOR TEST AND OTHER PROJECTS. PROVIDE OVERALL PROJECT MANAGEMENT FOR SPECIFIC TEST PROJECTS. THE MAJORITY OF EFFORT UNDER THIS PERFORMANCE WORK STATEMENT (PWS) IS FOR PROJECT MANAGEMENT AS WELL AS SUPPORT, BUT THE CAPABILITY FOR TOTAL PROJECT MANAGEMENT WILL BE REQUIRED FOR SPECIFIC PROJECTS. ALL PROJECT MANAGEMENT AND RELATED ACTIVITIES WILL BE IN ACCORDANCE WITH SCWI-8080-0001, PROPULSION TEST PROJECT MANAGEMENT AND REFERENCED DOCUMENTS WITHIN THE WORK INSTRUCTION. THE MANAGEMENT AND ADMINISTRATION FUNCTIONS ARE THOSE NECESSARY TO SUCCESSFULLY EXECUTE TESTING AND OTHER SUPPORTING OPERATIONS AT SSC AS DESCRIBED IN THIS PWS. THE CONTRACTOR S MANAGEMENT TEAM PER DR MA02 SHALL FOCUS ON ACCOMPLISHING SAFE AND SECURE OPERATIONS USING SOUND BUSINESS PRACTICES. AN AUTOMATED INFORMATION REPORT SHALL BE SUBMITTED PER DR PT03 WHEN WARRANTED. THE MANAGEMENT TEAM SHALL EFFICIENTLY UTILIZE PERSONNEL ACROSS THE CENTER TO THE MAXIMUM EXTENT POSSIBLE, STREAMLINE AND CONSOLIDATE BUSINESS AND TECHNICAL PROCESSES. 1.1 PROJECT ADMINISTRATION: THE CONTRACTOR SHALL PERFORM TASKS ASSOCIATED WITH FACILITATING THE EXECUTION OF PROJECTS. INCLUDED ARE THE BUSINESS AND ADMINISTRATIVE OVERSIGHT, PLANNING, ORGANIZING, DIRECTING, CONTROLLING, AND APPROVAL PROCESSES USED TO ACCOMPLISH EACH PROJECT S GOALS AND MISSION. 1.1.1 INTEGRATED CONTRACT TEAM THE CONTRACTOR SHALL SUPPLY AND ADMINISTER A FLEXIBLE, COMPETENT, AND QUALIFIED STAFF, TO FULLY SUPPORT AND ACCOMPLISH THE CONTRACT REQUIREMENTS. THERE SHALL BE AN ONSITE MANAGER AT SSC WHO IS A SINGLE POINT OF CONTACT FOR ALL CONTRACT OPERATIONS. THIS INDIVIDUAL WILL ACT AS PRIMARY INTERFACE BETWEEN THE CONTRACTOR AND THE NASA/SSC CONTRACTING OFFICER (CO) AND THE CONTRACTING OFFICER S TECHNICAL REPRESENTATIVE (COTR). SUBCONTRACTORS AND/OR TEAMING ARRANGEMENTS SHALL INTEGRATE THE MANAGEMENT STRUCTURE TOGETHER WITH THE CONTRACTOR. THE CONTRACTOR SHALL ALSO BE RESPONSIBLE FOR COMPREHENSIVE SUBCONTRACT MANAGEMENT. THE WORKFORCE AND WORK HOURS SHALL BE STRUCTURED TO SUCCESSFULLY SUPPORT NASA PROGRAM REQUIREMENTS AND SCHEDULES. NASA SHALL DEFINE CORE HOURS TO SUPPORT PROJECTS WHICH MAY VARY FROM ONE SHIFT A DAY FIVE DAYS A WEEK, TO POTENTIALLY 24-HOUR OPERATIONS, SEVEN (7) DAYS A WEEK. IN ADDITION, SHORT-TERM TECHNICAL TASKS, SUCH AS SPECIAL DESIGNS AND STUDIES, MAY REQUIRE PROVISION OF HIGHLY SPECIALIZED TECHNICAL PERSONNEL OR SERVICES. THE CONTRACTOR SHALL PROVIDE INTEGRATED MANAGEMENT AND ADMINISTRATIVE SERVICES
  • $82,623 - Friday the 10th of July 2015
    National Aeronautics And Space Administration
    STENNIS SPACE CENTER
    THE NATIONAL AERONAUTICS AND SPACE ADMINISTRATION'S (NASA) JOHN C. STENNIS SPACE CENTER (SSC) REQUIRES A CONTRACTOR TO PROVIDE TEST OPERATIONS, CORE OPERATIONS AND MAINTENANCE ACTIVITIES. SUCCESSFULLY MEETING THE REQUIREMENTS OF THIS PERFORMANCE WORK STATEMENT (PWS) REQUIRES KNOWLEDGEABLE AND EXPERIENCED ENGINEERS, TECHNICIANS, TRADES AND PROJECT MANAGERS. THIS PWS INCLUDES PERFORMANCE REQUIREMENTS OF CURRENT TEST PROJECT ACTIVITIES AT SSC, SPECIFICALLY DESCRIBING WORK ACCORDING TO THE EXISTING SCOPE AND PROCESSES. CONSISTENT WITH GOALS FOR THIS EFFORT, NASA EXPECTS TO ACHIEVE CONTINUAL PROCESS IMPROVEMENTS IN THE AREAS OF SAFETY MISSION ASSURANCE, EFFICIENCY, AND BEST PRACTICES. THIS PWS REQUIRES THE CONTRACTOR TO SEEK AND DEVELOP ASSIGNED TASKS FOR INNOVATION AND STREAMLINING. THIS PWS IS ORGANIZED TO ADDRESS THE SCOPE OF THE TEST OPERATIONS CONTRACT (TOC) AT SSC. INNOVATIVE IDEAS MAY BE PROPOSED, WITH SUFFICIENT JUSTIFICATION, TO ADDRESS THE ENTIRE SCOPE OF THIS CONTRACT. THE CONTRACTOR WILL BE A SIGNIFICANT DRIVING FORCE IN IDENTIFYING AND DEVELOPING RATIONALE FOR PROCESS IMPROVEMENTS TO BE IMPLEMENTED OVER THE TERM OF THE CONTRACT. 1.0 PROJECT MANAGEMENT&ADMINISTRATION THIS SECTION CONTAINS TASKS ASSOCIATED WITH BUSINESS AND ADMINISTRATIVE PLANNING, ORGANIZING, DIRECTING, COORDINATING, CONTROLLING AND APPROVAL ACTIONS DESIGNATED TO ACCOMPLISH OVERALL OBJECTIVES. THE CONTRACTOR SHALL PROVIDE PROJECT FORMULATION, DESIGN DEVELOPMENT, EXECUTION AND CLOSEOUT SUPPORT, FOR TEST AND OTHER PROJECTS. PROVIDE OVERALL PROJECT MANAGEMENT FOR SPECIFIC TEST PROJECTS. THE MAJORITY OF EFFORT UNDER THIS PERFORMANCE WORK STATEMENT (PWS) IS FOR PROJECT MANAGEMENT AS WELL AS SUPPORT, BUT THE CAPABILITY FOR TOTAL PROJECT MANAGEMENT WILL BE REQUIRED FOR SPECIFIC PROJECTS. ALL PROJECT MANAGEMENT AND RELATED ACTIVITIES WILL BE IN ACCORDANCE WITH SCWI-8080-0001, PROPULSION TEST PROJECT MANAGEMENT AND REFERENCED DOCUMENTS WITHIN THE WORK INSTRUCTION. THE MANAGEMENT AND ADMINISTRATION FUNCTIONS ARE THOSE NECESSARY TO SUCCESSFULLY EXECUTE TESTING AND OTHER SUPPORTING OPERATIONS AT SSC AS DESCRIBED IN THIS PWS. THE CONTRACTOR S MANAGEMENT TEAM PER DR MA02 SHALL FOCUS ON ACCOMPLISHING SAFE AND SECURE OPERATIONS USING SOUND BUSINESS PRACTICES. AN AUTOMATED INFORMATION REPORT SHALL BE SUBMITTED PER DR PT03 WHEN WARRANTED. THE MANAGEMENT TEAM SHALL EFFICIENTLY UTILIZE PERSONNEL ACROSS THE CENTER TO THE MAXIMUM EXTENT POSSIBLE, STREAMLINE AND CONSOLIDATE BUSINESS AND TECHNICAL PROCESSES. 1.1 PROJECT ADMINISTRATION: THE CONTRACTOR SHALL PERFORM TASKS ASSOCIATED WITH FACILITATING THE EXECUTION OF PROJECTS. INCLUDED ARE THE BUSINESS AND ADMINISTRATIVE OVERSIGHT, PLANNING, ORGANIZING, DIRECTING, CONTROLLING, AND APPROVAL PROCESSES USED TO ACCOMPLISH EACH PROJECT S GOALS AND MISSION. 1.1.1 INTEGRATED CONTRACT TEAM THE CONTRACTOR SHALL SUPPLY AND ADMINISTER A FLEXIBLE, COMPETENT, AND QUALIFIED STAFF, TO FULLY SUPPORT AND ACCOMPLISH THE CONTRACT REQUIREMENTS. THERE SHALL BE AN ONSITE MANAGER AT SSC WHO IS A SINGLE POINT OF CONTACT FOR ALL CONTRACT OPERATIONS. THIS INDIVIDUAL WILL ACT AS PRIMARY INTERFACE BETWEEN THE CONTRACTOR AND THE NASA/SSC CONTRACTING OFFICER (CO) AND THE CONTRACTING OFFICER S TECHNICAL REPRESENTATIVE (COTR). SUBCONTRACTORS AND/OR TEAMING ARRANGEMENTS SHALL INTEGRATE THE MANAGEMENT STRUCTURE TOGETHER WITH THE CONTRACTOR. THE CONTRACTOR SHALL ALSO BE RESPONSIBLE FOR COMPREHENSIVE SUBCONTRACT MANAGEMENT. THE WORKFORCE AND WORK HOURS SHALL BE STRUCTURED TO SUCCESSFULLY SUPPORT NASA PROGRAM REQUIREMENTS AND SCHEDULES. NASA SHALL DEFINE CORE HOURS TO SUPPORT PROJECTS WHICH MAY VARY FROM ONE SHIFT A DAY FIVE DAYS A WEEK, TO POTENTIALLY 24-HOUR OPERATIONS, SEVEN (7) DAYS A WEEK. IN ADDITION, SHORT-TERM TECHNICAL TASKS, SUCH AS SPECIAL DESIGNS AND STUDIES, MAY REQUIRE PROVISION OF HIGHLY SPECIALIZED TECHNICAL PERSONNEL OR SERVICES. THE CONTRACTOR SHALL PROVIDE INTEGRATED MANAGEMENT AND ADMINISTRATIVE SERVICES
  • $820,137 - Friday the 10th of July 2015
    National Aeronautics And Space Administration
    STENNIS SPACE CENTER
    THE NATIONAL AERONAUTICS AND SPACE ADMINISTRATION S (NASA) JOHN C. STENNIS SPACE CENTER (SSC) REQUIRES A CONTRACTOR TO PROVIDE TEST OPERATIONS, CORE OPERATIONS AND MAINTENANCE ACTIVITIES. SUCCESSFULLY MEETING THE REQUIREMENTS OF THIS PERFORMANCE WORK STATEMENT (PWS) REQUIRES KNOWLEDGEABLE AND EXPERIENCED ENGINEERS, TECHNICIANS, TRADES AND PROJECT MANAGERS. THIS PWS INCLUDES PERFORMANCE REQUIREMENTS OF CURRENT TEST PROJECT ACTIVITIES AT SSC, SPECIFICALLY DESCRIBING WORK ACCORDING TO THE EXISTING SCOPE AND PROCESSES. CONSISTENT WITH GOALS FOR THIS EFFORT, NASA EXPECTS TO ACHIEVE CONTINUAL PROCESS IMPROVEMENTS IN THE AREAS OF SAFETY MISSION ASSURANCE, EFFICIENCY, AND BEST PRACTICES. THIS PWS REQUIRES THE CONTRACTOR TO SEEK AND DEVELOP ASSIGNED TASKS FOR INNOVATION AND STREAMLINING. THIS PWS IS ORGANIZED TO ADDRESS THE SCOPE OF THE TEST OPERATIONS CONTRACT (TOC) AT SSC. INNOVATIVE IDEAS MAY BE PROPOSED, WITH SUFFICIENT JUSTIFICATION, TO ADDRESS THE ENTIRE SCOPE OF THIS CONTRACT. THE CONTRACTOR WILL BE A SIGNIFICANT DRIVING FORCE IN IDENTIFYING AND DEVELOPING RATIONALE FOR PROCESS IMPROVEMENTS TO BE IMPLEMENTED OVER THE TERM OF THE CONTRACT. 1.0 PROJECT MANAGEMENT&ADMINISTRATION THIS SECTION CONTAINS TASKS ASSOCIATED WITH BUSINESS AND ADMINISTRATIVE PLANNING, ORGANIZING, DIRECTING, COORDINATING, CONTROLLING AND APPROVAL ACTIONS DESIGNATED TO ACCOMPLISH OVERALL OBJECTIVES. THE CONTRACTOR SHALL PROVIDE PROJECT FORMULATION, DESIGN DEVELOPMENT, EXECUTION AND CLOSEOUT SUPPORT, FOR TEST AND OTHER PROJECTS. PROVIDE OVERALL PROJECT MANAGEMENT FOR SPECIFIC TEST PROJECTS. THE MAJORITY OF EFFORT UNDER THIS PERFORMANCE WORK STATEMENT (PWS) IS FOR PROJECT MANAGEMENT AS WELL AS SUPPORT, BUT THE CAPABILITY FOR TOTAL PROJECT MANAGEMENT WILL BE REQUIRED FOR SPECIFIC PROJECTS. ALL PROJECT MANAGEMENT AND RELATED ACTIVITIES WILL BE IN ACCORDANCE WITH SCWI-8080-0001, PROPULSION TEST PROJECT MANAGEMENT AND REFERENCED DOCUMENTS WITHIN THE WORK INSTRUCTION. THE MANAGEMENT AND ADMINISTRATION FUNCTIONS ARE THOSE NECESSARY TO SUCCESSFULLY EXECUTE TESTING AND OTHER SUPPORTING OPERATIONS AT SSC AS DESCRIBED IN THIS PWS. THE CONTRACTOR S MANAGEMENT TEAM PER DR MA02 SHALL FOCUS ON ACCOMPLISHING SAFE AND SECURE OPERATIONS USING SOUND BUSINESS PRACTICES. AN AUTOMATED INFORMATION REPORT SHALL BE SUBMITTED PER DR PT03 WHEN WARRANTED. THE MANAGEMENT TEAM SHALL EFFICIENTLY UTILIZE PERSONNEL ACROSS THE CENTER TO THE MAXIMUM EXTENT POSSIBLE, STREAMLINE AND CONSOLIDATE BUSINESS AND TECHNICAL PROCESSES. 1.1 PROJECT ADMINISTRATION: THE CONTRACTOR SHALL PERFORM TASKS ASSOCIATED WITH FACILITATING THE EXECUTION OF PROJECTS. INCLUDED ARE THE BUSINESS AND ADMINISTRATIVE OVERSIGHT, PLANNING, ORGANIZING, DIRECTING, CONTROLLING, AND APPROVAL PROCESSES USED TO ACCOMPLISH EACH PROJECT S GOALS AND MISSION. 1.1.1 INTEGRATED CONTRACT TEAM THE CONTRACTOR SHALL SUPPLY AND ADMINISTER A FLEXIBLE, COMPETENT, AND QUALIFIED STAFF, TO FULLY SUPPORT AND ACCOMPLISH THE CONTRACT REQUIREMENTS. THERE SHALL BE AN ONSITE MANAGER AT SSC WHO IS A SINGLE POINT OF CONTACT FOR ALL CONTRACT OPERATIONS. THIS INDIVIDUAL WILL ACT AS PRIMARY INTERFACE BETWEEN THE CONTRACTOR AND THE NASA/SSC CONTRACTING OFFICER (CO) AND THE CONTRACTING OFFICER S TECHNICAL REPRESENTATIVE (COTR). SUBCONTRACTORS AND/OR TEAMING ARRANGEMENTS SHALL INTEGRATE THE MANAGEMENT STRUCTURE TOGETHER WITH THE CONTRACTOR. THE CONTRACTOR SHALL ALSO BE RESPONSIBLE FOR COMPREHENSIVE SUBCONTRACT MANAGEMENT. THE WORKFORCE AND WORK HOURS SHALL BE STRUCTURED TO SUCCESSFULLY SUPPORT NASA PROGRAM REQUIREMENTS AND SCHEDULES. NASA SHALL DEFINE CORE HOURS TO SUPPORT PROJECTS WHICH MAY VARY FROM ONE SHIFT A DAY FIVE DAYS A WEEK, TO POTENTIALLY 24-HOUR OPERATIONS, SEVEN (7) DAYS A WEEK. IN ADDITION, SHORT-TERM TECHNICAL TASKS, SUCH AS SPECIAL DESIGNS AND STUDIES, MAY REQUIRE PROVISION OF HIGHLY SPECIALIZED TECHNICAL PERSONNEL OR SERVICES. THE CONTRACTOR SHALL PROVIDE INTEGRATED MANAGEMENT AND ADMINISTRATIVE SERVICES
  • $80,000 - Friday the 10th of July 2015
    National Aeronautics And Space Administration
    STENNIS SPACE CENTER
    THE NATIONAL AERONAUTICS AND SPACE ADMINISTRATION'S (NASA) JOHN C. STENNIS SPACE CENTER (SSC) REQUIRES A CONTRACTOR TO PROVIDE TEST OPERATIONS, CORE OPERATIONS AND MAINTENANCE ACTIVITIES. SUCCESSFULLY MEETING THE REQUIREMENTS OF THIS PERFORMANCE WORK STATEMENT (PWS) REQUIRES KNOWLEDGEABLE AND EXPERIENCED ENGINEERS, TECHNICIANS, TRADES AND PROJECT MANAGERS. THIS PWS INCLUDES PERFORMANCE REQUIREMENTS OF CURRENT TEST PROJECT ACTIVITIES AT SSC, SPECIFICALLY DESCRIBING WORK ACCORDING TO THE EXISTING SCOPE AND PROCESSES. CONSISTENT WITH GOALS FOR THIS EFFORT, NASA EXPECTS TO ACHIEVE CONTINUAL PROCESS IMPROVEMENTS IN THE AREAS OF SAFETY MISSION ASSURANCE, EFFICIENCY, AND BEST PRACTICES. THIS PWS REQUIRES THE CONTRACTOR TO SEEK AND DEVELOP ASSIGNED TASKS FOR INNOVATION AND STREAMLINING. THIS PWS IS ORGANIZED TO ADDRESS THE SCOPE OF THE TEST OPERATIONS CONTRACT (TOC) AT SSC. INNOVATIVE IDEAS MAY BE PROPOSED, WITH SUFFICIENT JUSTIFICATION, TO ADDRESS THE ENTIRE SCOPE OF THIS CONTRACT. THE CONTRACTOR WILL BE A SIGNIFICANT DRIVING FORCE IN IDENTIFYING AND DEVELOPING RATIONALE FOR PROCESS IMPROVEMENTS TO BE IMPLEMENTED OVER THE TERM OF THE CONTRACT. 1.0 PROJECT MANAGEMENT&ADMINISTRATION. THIS SECTION CONTAINS TASKS ASSOCIATED WITH BUSINESS AND ADMINISTRATIVE PLANNING, ORGANIZING, DIRECTING, COORDINATING, CONTROLLING AND APPROVAL ACTIONS DESIGNATED TO ACCOMPLISH OVERALL OBJECTIVES. THE CONTRACTOR SHALL PROVIDE PROJECT FORMULATION, DESIGN DEVELOPMENT, EXECUTION AND CLOSEOUT SUPPORT, FOR TEST AND OTHER PROJECTS. PROVIDE OVERALL PROJECT MANAGEMENT FOR SPECIFIC TEST PROJECTS. THE MAJORITY OF EFFORT UNDER THIS PERFORMANCE WORK STATEMENT (PWS) IS FOR PROJECT MANAGEMENT AS WELL AS SUPPORT, BUT THE CAPABILITY FOR TOTAL PROJECT MANAGEMENT WILL BE REQUIRED FOR SPECIFIC PROJECTS. ALL PROJECT MANAGEMENT AND RELATED ACTIVITIES WILL BE IN ACCORDANCE WITH SCWI-8080-0001, PROPULSION TEST PROJECT MANAGEMENT AND REFERENCED DOCUMENTS WITHIN THE WORK INSTRUCTION. THE MANAGEMENT AND ADMINISTRATION FUNCTIONS ARE THOSE NECESSARY TO SUCCESSFULLY EXECUTE TESTING AND OTHER SUPPORTING OPERATIONS AT SSC AS DESCRIBED IN THIS PWS. THE CONTRACTOR S MANAGEMENT TEAM PER DR MA02 SHALL FOCUS ON ACCOMPLISHING SAFE AND SECURE OPERATIONS USING SOUND BUSINESS PRACTICES. AN AUTOMATED INFORMATION REPORT SHALL BE SUBMITTED PER DR PT03 WHEN WARRANTED. THE MANAGEMENT TEAM SHALL EFFICIENTLY UTILIZE PERSONNEL ACROSS THE CENTER TO THE MAXIMUM EXTENT POSSIBLE, STREAMLINE AND CONSOLIDATE BUSINESS AND TECHNICAL PROCESSES. 1.1 PROJECT ADMINISTRATION: THE CONTRACTOR SHALL PERFORM TASKS ASSOCIATED WITH FACILITATING THE EXECUTION OF PROJECTS. INCLUDED ARE THE BUSINESS AND ADMINISTRATIVE OVERSIGHT, PLANNING, ORGANIZING, DIRECTING, CONTROLLING, AND APPROVAL PROCESSES USED TO ACCOMPLISH EACH PROJECT S GOALS AND MISSION.1.1.1 INTEGRATED CONTRACT TEAM THE CONTRACTOR SHALL SUPPLY AND ADMINISTER A FLEXIBLE, COMPETENT, AND QUALIFIED STAFF, TO FULLY SUPPORT AND ACCOMPLISH THE CONTRACT REQUIREMENTS. THERE SHALL BE AN ONSITE MANAGER AT SSC WHO IS A SINGLE POINT OF CONTACT FOR ALL CONTRACT OPERATIONS. THIS INDIVIDUAL WILL ACT AS PRIMARY INTERFACE BETWEEN THE CONTRACTOR AND THE NASA/SSC CONTRACTING OFFICER (CO) AND THE CONTRACTING OFFICER S TECHNICAL REPRESENTATIVE (COTR). SUBCONTRACTORS AND/OR TEAMING ARRANGEMENTS SHALL INTEGRATE THE MANAGEMENT STRUCTURE TOGETHER WITH THE CONTRACTOR. THE CONTRACTOR SHALL ALSO BE RESPONSIBLE FOR COMPREHENSIVE SUBCONTRACT MANAGEMENT. THE WORKFORCE AND WORK HOURS SHALL BE STRUCTURED TO SUCCESSFULLY SUPPORT NASA PROGRAM REQUIREMENTS AND SCHEDULES. NASA SHALL DEFINE CORE HOURS TO SUPPORT PROJECTS WHICH MAY VARY FROM ONE SHIFT A DAY FIVE DAYS A WEEK, TO POTENTIALLY 24-HOUR OPERATIONS, SEVEN (7) DAYS A WEEK. IN ADDITION, SHORT-TERM TECHNICAL TASKS, SUCH AS SPECIAL DESIGNS AND STUDIES, MAY REQUIRE PROVISION OF HIGHLY SPECIALIZED TECHNICAL PERSONNEL OR SERVICES.THE CONTRACTOR SHALL PROVIDE INTEGRATED MANAGEMENT AND ADMINISTRATIVE SERVICES
  • $79,752 - Friday the 10th of July 2015
    National Aeronautics And Space Administration
    STENNIS SPACE CENTER
    THE NATIONAL AERONAUTICS AND SPACE ADMINISTRATION'S (NASA) JOHN C. STENNIS SPACE CENTER (SSC) REQUIRES A CONTRACTOR TO PROVIDE TEST OPERATIONS, CORE OPERATIONS AND MAINTENANCE ACTIVITIES. SUCCESSFULLY MEETING THE REQUIREMENTS OF THIS PERFORMANCE WORK STATEMENT (PWS) REQUIRES KNOWLEDGEABLE AND EXPERIENCED ENGINEERS, TECHNICIANS, TRADES AND PROJECT MANAGERS. THIS PWS INCLUDES PERFORMANCE REQUIREMENTS OF CURRENT TEST PROJECT ACTIVITIES AT SSC, SPECIFICALLY DESCRIBING WORK ACCORDING TO THE EXISTING SCOPE AND PROCESSES. CONSISTENT WITH GOALS FOR THIS EFFORT, NASA EXPECTS TO ACHIEVE CONTINUAL PROCESS IMPROVEMENTS IN THE AREAS OF SAFETY MISSION ASSURANCE, EFFICIENCY, AND BEST PRACTICES. THIS PWS REQUIRES THE CONTRACTOR TO SEEK AND DEVELOP ASSIGNED TASKS FOR INNOVATION AND STREAMLINING. THIS PWS IS ORGANIZED TO ADDRESS THE SCOPE OF THE TEST OPERATIONS CONTRACT (TOC) AT SSC. INNOVATIVE IDEAS MAY BE PROPOSED, WITH SUFFICIENT JUSTIFICATION, TO ADDRESS THE ENTIRE SCOPE OF THIS CONTRACT. THE CONTRACTOR WILL BE A SIGNIFICANT DRIVING FORCE IN IDENTIFYING AND DEVELOPING RATIONALE FOR PROCESS IMPROVEMENTS TO BE IMPLEMENTED OVER THE TERM OF THE CONTRACT. 1.0 PROJECT MANAGEMENT&ADMINISTRATION THIS SECTION CONTAINS TASKS ASSOCIATED WITH BUSINESS AND ADMINISTRATIVE PLANNING, ORGANIZING, DIRECTING, COORDINATING, CONTROLLING AND APPROVAL ACTIONS DESIGNATED TO ACCOMPLISH OVERALL OBJECTIVES. THE CONTRACTOR SHALL PROVIDE PROJECT FORMULATION, DESIGN DEVELOPMENT, EXECUTION AND CLOSEOUT SUPPORT, FOR TEST AND OTHER PROJECTS. PROVIDE OVERALL PROJECT MANAGEMENT FOR SPECIFIC TEST PROJECTS. THE MAJORITY OF EFFORT UNDER THIS PERFORMANCE WORK STATEMENT (PWS) IS FOR PROJECT MANAGEMENT AS WELL AS SUPPORT, BUT THE CAPABILITY FOR TOTAL PROJECT MANAGEMENT WILL BE REQUIRED FOR SPECIFIC PROJECTS. ALL PROJECT MANAGEMENT AND RELATED ACTIVITIES WILL BE IN ACCORDANCE WITH SCWI-8080-0001, PROPULSION TEST PROJECT MANAGEMENT AND REFERENCED DOCUMENTS WITHIN THE WORK INSTRUCTION. THE MANAGEMENT AND ADMINISTRATION FUNCTIONS ARE THOSE NECESSARY TO SUCCESSFULLY EXECUTE TESTING AND OTHER SUPPORTING OPERATIONS AT SSC AS DESCRIBED IN THIS PWS. THE CONTRACTOR S MANAGEMENT TEAM PER DR MA02 SHALL FOCUS ON ACCOMPLISHING SAFE AND SECURE OPERATIONS USING SOUND BUSINESS PRACTICES. AN AUTOMATED INFORMATION REPORT SHALL BE SUBMITTED PER DR PT03 WHEN WARRANTED. THE MANAGEMENT TEAM SHALL EFFICIENTLY UTILIZE PERSONNEL ACROSS THE CENTER TO THE MAXIMUM EXTENT POSSIBLE, STREAMLINE AND CONSOLIDATE BUSINESS AND TECHNICAL PROCESSES. 1.1 PROJECT ADMINISTRATION: THE CONTRACTOR SHALL PERFORM TASKS ASSOCIATED WITH FACILITATING THE EXECUTION OF PROJECTS. INCLUDED ARE THE BUSINESS AND ADMINISTRATIVE OVERSIGHT, PLANNING, ORGANIZING, DIRECTING, CONTROLLING, AND APPROVAL PROCESSES USED TO ACCOMPLISH EACH PROJECT S GOALS AND MISSION. 1.1.1 INTEGRATED CONTRACT TEAM THE CONTRACTOR SHALL SUPPLY AND ADMINISTER A FLEXIBLE, COMPETENT, AND QUALIFIED STAFF, TO FULLY SUPPORT AND ACCOMPLISH THE CONTRACT REQUIREMENTS. THERE SHALL BE AN ONSITE MANAGER AT SSC WHO IS A SINGLE POINT OF CONTACT FOR ALL CONTRACT OPERATIONS. THIS INDIVIDUAL WILL ACT AS PRIMARY INTERFACE BETWEEN THE CONTRACTOR AND THE NASA/SSC CONTRACTING OFFICER (CO) AND THE CONTRACTING OFFICER S TECHNICAL REPRESENTATIVE (COTR). SUBCONTRACTORS AND/OR TEAMING ARRANGEMENTS SHALL INTEGRATE THE MANAGEMENT STRUCTURE TOGETHER WITH THE CONTRACTOR. THE CONTRACTOR SHALL ALSO BE RESPONSIBLE FOR COMPREHENSIVE SUBCONTRACT MANAGEMENT. THE WORKFORCE AND WORK HOURS SHALL BE STRUCTURED TO SUCCESSFULLY SUPPORT NASA PROGRAM REQUIREMENTS AND SCHEDULES. NASA SHALL DEFINE CORE HOURS TO SUPPORT PROJECTS WHICH MAY VARY FROM ONE SHIFT A DAY FIVE DAYS A WEEK, TO POTENTIALLY 24-HOUR OPERATIONS, SEVEN (7) DAYS A WEEK. IN ADDITION, SHORT-TERM TECHNICAL TASKS, SUCH AS SPECIAL DESIGNS AND STUDIES, MAY REQUIRE PROVISION OF HIGHLY SPECIALIZED TECHNICAL PERSONNEL OR SERVICES. THE CONTRACTOR SHALL PROVIDE INTEGRATED MANAGEMENT AND ADMINISTRATIVE SERVICES
  • $610,000 - Friday the 10th of July 2015
    National Aeronautics And Space Administration
    STENNIS SPACE CENTER
    THE NATIONAL AERONAUTICS AND SPACE ADMINISTRATION S (NASA) JOHN C. STENNIS SPACE CENTER (SSC) REQUIRES A CONTRACTOR TO PROVIDE TEST OPERATIONS, CORE OPERATIONS AND MAINTENANCE ACTIVITIES. SUCCESSFULLY MEETING THE REQUIREMENTS OF THIS PERFORMANCE WORK STATEMENT (PWS) REQUIRES KNOWLEDGEABLE AND EXPERIENCED ENGINEERS, TECHNICIANS, TRADES AND PROJECT MANAGERS. THIS PWS INCLUDES PERFORMANCE REQUIREMENTS OF CURRENT TEST PROJECT ACTIVITIES AT SSC, SPECIFICALLY DESCRIBING WORK ACCORDING TO THE EXISTING SCOPE AND PROCESSES. CONSISTENT WITH GOALS FOR THIS EFFORT, NASA EXPECTS TO ACHIEVE CONTINUAL PROCESS IMPROVEMENTS IN THE AREAS OF SAFETY MISSION ASSURANCE, EFFICIENCY, AND BEST PRACTICES. THIS PWS REQUIRES THE CONTRACTOR TO SEEK AND DEVELOP ASSIGNED TASKS FOR INNOVATION AND STREAMLINING. THIS PWS IS ORGANIZED TO ADDRESS THE SCOPE OF THE TEST OPERATIONS CONTRACT (TOC) AT SSC. INNOVATIVE IDEAS MAY BE PROPOSED, WITH SUFFICIENT JUSTIFICATION, TO ADDRESS THE ENTIRE SCOPE OF THIS CONTRACT. THE CONTRACTOR WILL BE A SIGNIFICANT DRIVING FORCE IN IDENTIFYING AND DEVELOPING RATIONALE FOR PROCESS IMPROVEMENTS TO BE IMPLEMENTED OVER THE TERM OF THE CONTRACT. 1.0 PROJECT MANAGEMENT&ADMINISTRATION THIS SECTION CONTAINS TASKS ASSOCIATED WITH BUSINESS AND ADMINISTRATIVE PLANNING, ORGANIZING, DIRECTING, COORDINATING, CONTROLLING AND APPROVAL ACTIONS DESIGNATED TO ACCOMPLISH OVERALL OBJECTIVES. THE CONTRACTOR SHALL PROVIDE PROJECT FORMULATION, DESIGN DEVELOPMENT, EXECUTION AND CLOSEOUT SUPPORT, FOR TEST AND OTHER PROJECTS. PROVIDE OVERALL PROJECT MANAGEMENT FOR SPECIFIC TEST PROJECTS. THE MAJORITY OF EFFORT UNDER THIS PERFORMANCE WORK STATEMENT (PWS) IS FOR PROJECT MANAGEMENT AS WELL AS SUPPORT, BUT THE CAPABILITY FOR TOTAL PROJECT MANAGEMENT WILL BE REQUIRED FOR SPECIFIC PROJECTS. ALL PROJECT MANAGEMENT AND RELATED ACTIVITIES WILL BE IN ACCORDANCE WITH SCWI-8080-0001, PROPULSION TEST PROJECT MANAGEMENT AND REFERENCED DOCUMENTS WITHIN THE WORK INSTRUCTION. THE MANAGEMENT AND ADMINISTRATION FUNCTIONS ARE THOSE NECESSARY TO SUCCESSFULLY EXECUTE TESTING AND OTHER SUPPORTING OPERATIONS AT SSC AS DESCRIBED IN THIS PWS. THE CONTRACTOR S MANAGEMENT TEAM PER DR MA02 SHALL FOCUS ON ACCOMPLISHING SAFE AND SECURE OPERATIONS USING SOUND BUSINESS PRACTICES. AN AUTOMATED INFORMATION REPORT SHALL BE SUBMITTED PER DR PT03 WHEN WARRANTED. THE MANAGEMENT TEAM SHALL EFFICIENTLY UTILIZE PERSONNEL ACROSS THE CENTER TO THE MAXIMUM EXTENT POSSIBLE, STREAMLINE AND CONSOLIDATE BUSINESS AND TECHNICAL PROCESSES. 1.1 PROJECT ADMINISTRATION: THE CONTRACTOR SHALL PERFORM TASKS ASSOCIATED WITH FACILITATING THE EXECUTION OF PROJECTS. INCLUDED ARE THE BUSINESS AND ADMINISTRATIVE OVERSIGHT, PLANNING, ORGANIZING, DIRECTING, CONTROLLING, AND APPROVAL PROCESSES USED TO ACCOMPLISH EACH PROJECT S GOALS AND MISSION. 1.1.1 INTEGRATED CONTRACT TEAM THE CONTRACTOR SHALL SUPPLY AND ADMINISTER A FLEXIBLE, COMPETENT, AND QUALIFIED STAFF, TO FULLY SUPPORT AND ACCOMPLISH THE CONTRACT REQUIREMENTS. THERE SHALL BE AN ONSITE MANAGER AT SSC WHO IS A SINGLE POINT OF CONTACT FOR ALL CONTRACT OPERATIONS. THIS INDIVIDUAL WILL ACT AS PRIMARY INTERFACE BETWEEN THE CONTRACTOR AND THE NASA/SSC CONTRACTING OFFICER (CO) AND THE CONTRACTING OFFICER S TECHNICAL REPRESENTATIVE (COTR). SUBCONTRACTORS AND/OR TEAMING ARRANGEMENTS SHALL INTEGRATE THE MANAGEMENT STRUCTURE TOGETHER WITH THE CONTRACTOR. THE CONTRACTOR SHALL ALSO BE RESPONSIBLE FOR COMPREHENSIVE SUBCONTRACT MANAGEMENT. THE WORKFORCE AND WORK HOURS SHALL BE STRUCTURED TO SUCCESSFULLY SUPPORT NASA PROGRAM REQUIREMENTS AND SCHEDULES. NASA SHALL DEFINE CORE HOURS TO SUPPORT PROJECTS WHICH MAY VARY FROM ONE SHIFT A DAY FIVE DAYS A WEEK, TO POTENTIALLY 24-HOUR OPERATIONS, SEVEN (7) DAYS A WEEK. IN ADDITION, SHORT-TERM TECHNICAL TASKS, SUCH AS SPECIAL DESIGNS AND STUDIES, MAY REQUIRE PROVISION OF HIGHLY SPECIALIZED TECHNICAL PERSONNEL OR SERVICES. THE CONTRACTOR SHALL PROVIDE INTEGRATED MANAGEMENT AND ADMINISTRATIVE SERVICES
  • $591,886 - Friday the 10th of July 2015
    National Aeronautics And Space Administration
    STENNIS SPACE CENTER
    THE NATIONAL AERONAUTICS AND SPACE ADMINISTRATION'S (NASA) JOHN C. STENNIS SPACE CENTER (SSC) REQUIRES A CONTRACTOR TO PROVIDE TEST OPERATIONS, CORE OPERATIONS AND MAINTENANCE ACTIVITIES. SUCCESSFULLY MEETING THE REQUIREMENTS OF THIS PERFORMANCE WORK STATEMENT (PWS) REQUIRES KNOWLEDGEABLE AND EXPERIENCED ENGINEERS, TECHNICIANS, TRADES AND PROJECT MANAGERS. THIS PWS INCLUDES PERFORMANCE REQUIREMENTS OF CURRENT TEST PROJECT ACTIVITIES AT SSC, SPECIFICALLY DESCRIBING WORK ACCORDING TO THE EXISTING SCOPE AND PROCESSES. CONSISTENT WITH GOALS FOR THIS EFFORT, NASA EXPECTS TO ACHIEVE CONTINUAL PROCESS IMPROVEMENTS IN THE AREAS OF SAFETY MISSION ASSURANCE, EFFICIENCY, AND BEST PRACTICES. THIS PWS REQUIRES THE CONTRACTOR TO SEEK AND DEVELOP ASSIGNED TASKS FOR INNOVATION AND STREAMLINING. THIS PWS IS ORGANIZED TO ADDRESS THE SCOPE OF THE TEST OPERATIONS CONTRACT (TOC) AT SSC. INNOVATIVE IDEAS MAY BE PROPOSED, WITH SUFFICIENT JUSTIFICATION, TO ADDRESS THE ENTIRE SCOPE OF THIS CONTRACT. THE CONTRACTOR WILL BE A SIGNIFICANT DRIVING FORCE IN IDENTIFYING AND DEVELOPING RATIONALE FOR PROCESS IMPROVEMENTS TO BE IMPLEMENTED OVER THE TERM OF THE CONTRACT. 1.0 PROJECT MANAGEMENT&ADMINISTRATION THIS SECTION CONTAINS TASKS ASSOCIATED WITH BUSINESS AND ADMINISTRATIVE PLANNING, ORGANIZING, DIRECTING, COORDINATING, CONTROLLING AND APPROVAL ACTIONS DESIGNATED TO ACCOMPLISH OVERALL OBJECTIVES. THE CONTRACTOR SHALL PROVIDE PROJECT FORMULATION, DESIGN DEVELOPMENT, EXECUTION AND CLOSEOUT SUPPORT, FOR TEST AND OTHER PROJECTS. PROVIDE OVERALL PROJECT MANAGEMENT FOR SPECIFIC TEST PROJECTS. THE MAJORITY OF EFFORT UNDER THIS PERFORMANCE WORK STATEMENT (PWS) IS FOR PROJECT MANAGEMENT AS WELL AS SUPPORT, BUT THE CAPABILITY FOR TOTAL PROJECT MANAGEMENT WILL BE REQUIRED FOR SPECIFIC PROJECTS. ALL PROJECT MANAGEMENT AND RELATED ACTIVITIES WILL BE IN ACCORDANCE WITH SCWI-8080-0001, PROPULSION TEST PROJECT MANAGEMENT AND REFERENCED DOCUMENTS WITHIN THE WORK INSTRUCTION. THE MANAGEMENT AND ADMINISTRATION FUNCTIONS ARE THOSE NECESSARY TO SUCCESSFULLY EXECUTE TESTING AND OTHER SUPPORTING OPERATIONS AT SSC AS DESCRIBED IN THIS PWS. THE CONTRACTOR S MANAGEMENT TEAM PER DR MA02 SHALL FOCUS ON ACCOMPLISHING SAFE AND SECURE OPERATIONS USING SOUND BUSINESS PRACTICES. AN AUTOMATED INFORMATION REPORT SHALL BE SUBMITTED PER DR PT03 WHEN WARRANTED. THE MANAGEMENT TEAM SHALL EFFICIENTLY UTILIZE PERSONNEL ACROSS THE CENTER TO THE MAXIMUM EXTENT POSSIBLE, STREAMLINE AND CONSOLIDATE BUSINESS AND TECHNICAL PROCESSES. 1.1 PROJECT ADMINISTRATION: THE CONTRACTOR SHALL PERFORM TASKS ASSOCIATED WITH FACILITATING THE EXECUTION OF PROJECTS. INCLUDED ARE THE BUSINESS AND ADMINISTRATIVE OVERSIGHT, PLANNING, ORGANIZING, DIRECTING, CONTROLLING, AND APPROVAL PROCESSES USED TO ACCOMPLISH EACH PROJECT S GOALS AND MISSION. 1.1.1 INTEGRATED CONTRACT TEAM THE CONTRACTOR SHALL SUPPLY AND ADMINISTER A FLEXIBLE, COMPETENT, AND QUALIFIED STAFF, TO FULLY SUPPORT AND ACCOMPLISH THE CONTRACT REQUIREMENTS. THERE SHALL BE AN ONSITE MANAGER AT SSC WHO IS A SINGLE POINT OF CONTACT FOR ALL CONTRACT OPERATIONS. THIS INDIVIDUAL WILL ACT AS PRIMARY INTERFACE BETWEEN THE CONTRACTOR AND THE NASA/SSC CONTRACTING OFFICER (CO) AND THE CONTRACTING OFFICER S TECHNICAL REPRESENTATIVE (COTR). SUBCONTRACTORS AND/OR TEAMING ARRANGEMENTS SHALL INTEGRATE THE MANAGEMENT STRUCTURE TOGETHER WITH THE CONTRACTOR. THE CONTRACTOR SHALL ALSO BE RESPONSIBLE FOR COMPREHENSIVE SUBCONTRACT MANAGEMENT. THE WORKFORCE AND WORK HOURS SHALL BE STRUCTURED TO SUCCESSFULLY SUPPORT NASA PROGRAM REQUIREMENTS AND SCHEDULES. NASA SHALL DEFINE CORE HOURS TO SUPPORT PROJECTS WHICH MAY VARY FROM ONE SHIFT A DAY FIVE DAYS A WEEK, TO POTENTIALLY 24-HOUR OPERATIONS, SEVEN (7) DAYS A WEEK. IN ADDITION, SHORT-TERM TECHNICAL TASKS, SUCH AS SPECIAL DESIGNS AND STUDIES, MAY REQUIRE PROVISION OF HIGHLY SPECIALIZED TECHNICAL PERSONNEL OR SERVICES. THE CONTRACTOR SHALL PROVIDE INTEGRATED MANAGEMENT AND ADMINISTRATIVE SERVICES
  • $5,805,248 - Friday the 10th of July 2015
    National Aeronautics And Space Administration
    STENNIS SPACE CENTER
    THE NATIONAL AERONAUTICS AND SPACE ADMINISTRATION'S (NASA) JOHN C. STENNIS SPACE CENTER (SSC) REQUIRES A CONTRACTOR TO PROVIDE TEST OPERATIONS, CORE OPERATIONS AND MAINTENANCE ACTIVITIES. SUCCESSFULLY MEETING THE REQUIREMENTS OF THIS PERFORMANCE WORK STATEMENT (PWS) REQUIRES KNOWLEDGEABLE AND EXPERIENCED ENGINEERS, TECHNICIANS, TRADES AND PROJECT MANAGERS. THIS PWS INCLUDES PERFORMANCE REQUIREMENTS OF CURRENT TEST PROJECT ACTIVITIES AT SSC, SPECIFICALLY DESCRIBING WORK ACCORDING TO THE EXISTING SCOPE AND PROCESSES. CONSISTENT WITH GOALS FOR THIS EFFORT, NASA EXPECTS TO ACHIEVE CONTINUAL PROCESS IMPROVEMENTS IN THE AREAS OF SAFETY MISSION ASSURANCE, EFFICIENCY, AND BEST PRACTICES. THIS PWS REQUIRES THE CONTRACTOR TO SEEK AND DEVELOP ASSIGNED TASKS FOR INNOVATION AND STREAMLINING. THIS PWS IS ORGANIZED TO ADDRESS THE SCOPE OF THE TEST OPERATIONS CONTRACT (TOC) AT SSC. INNOVATIVE IDEAS MAY BE PROPOSED, WITH SUFFICIENT JUSTIFICATION, TO ADDRESS THE ENTIRE SCOPE OF THIS CONTRACT. THE CONTRACTOR WILL BE A SIGNIFICANT DRIVING FORCE IN IDENTIFYING AND DEVELOPING RATIONALE FOR PROCESS IMPROVEMENTS TO BE IMPLEMENTED OVER THE TERM OF THE CONTRACT. 1.0 PROJECT MANAGEMENT&ADMINISTRATION THIS SECTION CONTAINS TASKS ASSOCIATED WITH BUSINESS AND ADMINISTRATIVE PLANNING, ORGANIZING, DIRECTING, COORDINATING, CONTROLLING AND APPROVAL ACTIONS DESIGNATED TO ACCOMPLISH OVERALL OBJECTIVES. THE CONTRACTOR SHALL PROVIDE PROJECT FORMULATION, DESIGN DEVELOPMENT, EXECUTION AND CLOSEOUT SUPPORT, FOR TEST AND OTHER PROJECTS. PROVIDE OVERALL PROJECT MANAGEMENT FOR SPECIFIC TEST PROJECTS. THE MAJORITY OF EFFORT UNDER THIS PERFORMANCE WORK STATEMENT (PWS) IS FOR PROJECT MANAGEMENT AS WELL AS SUPPORT, BUT THE CAPABILITY FOR TOTAL PROJECT MANAGEMENT WILL BE REQUIRED FOR SPECIFIC PROJECTS. ALL PROJECT MANAGEMENT AND RELATED ACTIVITIES WILL BE IN ACCORDANCE WITH SCWI-8080-0001, PROPULSION TEST PROJECT MANAGEMENT AND REFERENCED DOCUMENTS WITHIN THE WORK INSTRUCTION. THE MANAGEMENT AND ADMINISTRATION FUNCTIONS ARE THOSE NECESSARY TO SUCCESSFULLY EXECUTE TESTING AND OTHER SUPPORTING OPERATIONS AT SSC AS DESCRIBED IN THIS PWS. THE CONTRACTOR S MANAGEMENT TEAM PER DR MA02 SHALL FOCUS ON ACCOMPLISHING SAFE AND SECURE OPERATIONS USING SOUND BUSINESS PRACTICES. AN AUTOMATED INFORMATION REPORT SHALL BE SUBMITTED PER DR PT03 WHEN WARRANTED. THE MANAGEMENT TEAM SHALL EFFICIENTLY UTILIZE PERSONNEL ACROSS THE CENTER TO THE MAXIMUM EXTENT POSSIBLE, STREAMLINE AND CONSOLIDATE BUSINESS AND TECHNICAL PROCESSES. 1.1 PROJECT ADMINISTRATION: THE CONTRACTOR SHALL PERFORM TASKS ASSOCIATED WITH FACILITATING THE EXECUTION OF PROJECTS. INCLUDED ARE THE BUSINESS AND ADMINISTRATIVE OVERSIGHT, PLANNING, ORGANIZING, DIRECTING, CONTROLLING, AND APPROVAL PROCESSES USED TO ACCOMPLISH EACH PROJECT S GOALS AND MISSION. 1.1.1 INTEGRATED CONTRACT TEAM THE CONTRACTOR SHALL SUPPLY AND ADMINISTER A FLEXIBLE, COMPETENT, AND QUALIFIED STAFF, TO FULLY SUPPORT AND ACCOMPLISH THE CONTRACT REQUIREMENTS. THERE SHALL BE AN ONSITE MANAGER AT SSC WHO IS A SINGLE POINT OF CONTACT FOR ALL CONTRACT OPERATIONS. THIS INDIVIDUAL WILL ACT AS PRIMARY INTERFACE BETWEEN THE CONTRACTOR AND THE NASA/SSC CONTRACTING OFFICER (CO) AND THE CONTRACTING OFFICER S TECHNICAL REPRESENTATIVE (COTR). SUBCONTRACTORS AND/OR TEAMING ARRANGEMENTS SHALL INTEGRATE THE MANAGEMENT STRUCTURE TOGETHER WITH THE CONTRACTOR. THE CONTRACTOR SHALL ALSO BE RESPONSIBLE FOR COMPREHENSIVE SUBCONTRACT MANAGEMENT. THE WORKFORCE AND WORK HOURS SHALL BE STRUCTURED TO SUCCESSFULLY SUPPORT NASA PROGRAM REQUIREMENTS AND SCHEDULES. NASA SHALL DEFINE CORE HOURS TO SUPPORT PROJECTS WHICH MAY VARY FROM ONE SHIFT A DAY FIVE DAYS A WEEK, TO POTENTIALLY 24-HOUR OPERATIONS, SEVEN (7) DAYS A WEEK. IN ADDITION, SHORT-TERM TECHNICAL TASKS, SUCH AS SPECIAL DESIGNS AND STUDIES, MAY REQUIRE PROVISION OF HIGHLY SPECIALIZED TECHNICAL PERSONNEL OR SERVICES. THE CONTRACTOR SHALL PROVIDE INTEGRATED MANAGEMENT AND ADMINISTRATIVE SERVICES
  • $561,013 - Wednesday the 12th of September 2012
    National Aeronautics And Space Administration
    ARMSTRONG FLIGHT RESEARCH CENTER
    THE PURPOSE OF THIS CONTRACT IS FOR SPACE SHUTTLE LANDING&RESEARCH AIRCRAFT SUPPORT SERVICES. THE CONTRACTOR IS REQUIRED TO PROVIDE MANAGEMENT AND TECHNICAL PERSONNEL TO OPERATE, MAINTAIN AND REPAIR SPACE SHUTTLE LANDING AIDS AND COMMUNICATIONS EQUIPMENT PRIOR TO LAUNCH, DURING SPECIFIED ON-ORBIT SPACE FLIGHT OPERATIONS AND DURING SHUTTLE LANDINGS AT EDWARDS.

© Copyright 2019
The Collier Report
published by 1918 Media LLC.
Information displayed in this dossier has been provided through available open source or public sources. No reliance should be made by readers or Collier Report subscribers. Funding actions are complicated and do not always represent dollar-for-dollar payments to vendors nor do they represent payments in certain instances. Requests for the modification of displayed information may be made to help.desk@1918.media.