The Collier Report of U.S. Government Contracting

Old School Reporting Using Modern Technology

Lake Contracting Inc

  • Lake Contracting Inc

  • View government funding actions
  • Addieville, IL 622141532
  • Phone: 618-824-6522
  • Estimated Number of Employees: 20
  • Estimated Annual Receipts: $5,000,000
  • Business Start Date: 1989
  • Contact Person: David Lake
  • Contact Phone: 618-824-6522
  • Contact Email: lci@egyptian.net
  • Business Structure:
  • Corporate Entity (Not Tax Exempt)
  • Business Type:
  • For Profit Organization
  • Industries Served: Other Heavy and Civil Engineering Construction, Poured Concrete Foundation and Structure Contractors, Other Foundation, Structure, and Building Exterior Contractors, Site Preparation Contractors, All Other Specialty Trade Contractors
  • Product Areas: LATHES, MILLING MACHINES, MECHANICAL PRESSES, POWER DRIVEN, PUNCHING AND SHEARING MACHINES

Sampling of Federal Government Funding Actions/Set Asides

In order by amount of set aside monies.

  • $94,200 - Monday the 27th of February 2012
    Department Of Army
    W07V ENDIST ST LOUIS
    OPTION YEAR TWO (2) VEGETATIVE MANAGEMENT/TO REPAIR FLOODING DAMAGED LEVEE TOPS AND BIKE TRAILS AT REND LAKE, BENTON, IL
  • $83,210 - Friday the 6th of July 2012
    Department Of Army
    W07V ENDIST ST LOUIS
    OPTION YEAR 2/TO REPAIR FLOOD DAMAGED BREAKWATERS AND PLACE RIPRAP AT REND LAKE, BENTON, IL
  • $790 - Tuesday the 22nd of May 2012
    Department Of Army
    W07V ENDIST ST LOUIS
    OPTION YEAR 1/TO INSTALL SIGNS AND SIGN POSTS AND TO FORM AND POUR CONCRETE AT JACKIE BRANCH BOAT RAMP, BENTON, IL
  • $7,600 - Thursday the 13th of September 2012
    Department Of Army
    W07V ENDIST ST LOUIS
    OPTION YEAR 2/BEACH SAND FOR SS&DALE MILLER, REND LAKE, BENTON, IL
  • $7,560 - Tuesday the 28th of February 2012
    Department Of Army
    W07V ENDIST ST LOUIS
    OPTION YEAR TWO (2) VEGETATIVE MGMT/INSTALL LOW WATER CROSSING AT WHITETAIL RIDGE GATE&REPLACE CULVERT AT NORTH GREENTREE WATER CONTROL STRUCTURE AT REND LAKE, BENTON, IL
  • $7,350 - Thursday the 17th of May 2012
    Department Of Army
    W07V ENDIST ST LOUIS
    OPTION YEAR THREE VEG MANAGEMENT/SEEDING&DEBRIS REMOVAL AT REND LAKE, BENTON, IL
  • $6,516 - Tuesday the 24th of April 2012
    Department Of Army
    W07V ENDIST ST LOUIS
    OPTION YEAR 1/DEMOLISH AND DISPOSE OF CONDEMMED SHELTER IN NM, REND LAKE, BENTON, IL
  • $64,000 - Tuesday the 29th of May 2012
    Department Of Army
    W07V ENDIST ST LOUIS
    ALL PLANT, LABOR, EQUIPMENT, AND MATERIALS FOR THE PROCUREMENT OF A FOUR SIDED 30 FOOT X 40 FOOT SHELTER AND CONCRETE SLAB FLOORING AT REND LAKE, BENTON, IL. PROJECT NO.:107151
  • $6,325 - Thursday the 13th of September 2012
    Department Of Army
    W07V ENDIST ST LOUIS
    OPTION YEAR THREE VEG MANAGEMENT/HYDRO-AXING AT REND LAKE, BENTON, IL
  • $61,950 - Friday the 25th of May 2012
    Department Of Army
    W07V ENDIST ST LOUIS
    OPTION YEAR 1/T.O. TO REPAIR FLOOD DAMAGED BREAKWATERS AND PLACE RIP RAP AT REND LAKE, BENTON, IL

© Copyright 2019
The Collier Report
published by 1918 Media LLC.
Information displayed in this dossier has been provided through available open source or public sources. No reliance should be made by readers or Collier Report subscribers. Funding actions are complicated and do not always represent dollar-for-dollar payments to vendors nor do they represent payments in certain instances. Requests for the modification of displayed information may be made to help.desk@1918.media.