K R Environmental Services Inc

  • K R Environmental Services Inc

  • View government funding actions
  • Huntington Beach, CA 926482043
  • Phone: 714-378-0834
  • Estimated Number of Employees: 4
  • Estimated Annual Receipts: $323,651
  • Business Start Date: 1996
  • Contact Person: Kurt Baumann
  • Contact Phone: 714-754-7800
  • Contact Email: kurt@krenvironmental.com
  • Business Structure:
  • Corporate Entity (Not Tax Exempt)
  • Business Type:
  • For Profit Organization
  • Industries Served: Environmental Consulting Services
  • Product Areas: R&D- MINING: MINING RECLAMATION METHODS (BASIC RESEARCH), MINING RECLAMATION METHODS (BASIC), AERIAL SEEDING SERVICES, NATURAL RESOURCES/CONSERVATION- AERIAL SEEDING, FOREST-RANGE FIRE REHABILITATION, NATURAL RESOURCES/CONSERVATION- FOREST/RANGE FIRE REHABILITATION (NON-CONSTRUCTION), NATURAL RESOURCES/CONSERVATION- RANGE SEEDING (GROUND EQUIPMENT), RANGE SEEDING - GROUND EQ

Sampling of Federal Government Funding Actions/Set Asides

In order by amount of set aside monies.

  • $8,900 - Tuesday the 27th of March 2012
    Public Buildings Service
    LOS ANGELES SERVICE CENTER, NORTH LOS ANGELES FIELD OFFICE
    TO PERFORM MOLD SAMPLING, ABATEMENT, INSPECTION, MONITORING AND CLEARANCE IN THE ROYBAL CAFETERIA DINING ROOM.
  • $6,100 - Thursday the 20th of September 2012
    Public Buildings Service
    DESIGN AND CONSTRUCTION DIVISION
    THIS MODIFICATION IS BEING ISSUED TO PROVIDE FOR ALL LABOR, EQUIPMENT, AND MATERIALS NECESSARY TO PROVIDE FOR EIGHT (8) ADDITIONAL AIR MONITORING SHIFTS, ALONG WITH ALL ASSOCIATED TESTING, DURING ABATEMENT WORK REQUIRED ON THE 2ND FLOOR TO ACCOMMODATE THE INSTALLATION OF AIR HANDLING UNITS (AHUS) AND THEIR ASSOCIATED DUCTWORK AS A PART OF THE WEST ENTRY PAVILION RENOVATION OCCURRING AT THE FEDERAL BUILDING LOCATED AT 300 NORTH LOS ANGELES STREET IN LOS ANGELES, CALIFORNIA.
  • $5,862 - Monday the 18th of June 2012
    Public Buildings Service
    DESIGN AND CONSTRUCTION DIVISION
    THIS MODIFICATION IS BEING ISSUED TO PROVIDE FOR ALL LABOR, EQUIPMENT, AND MATERIALS NECESSARY TO PROVIDE FOR TWELVE (12) ADDITIONAL AIR MONITORING SHIFTS. THESE ADDITIONAL SHIFTS ARE REQUIRED DUE TO CHANGES IN THE SCHEDULE FOR THE ABATEMENT WORK OCCURRING AS A PART OF THE WEST ENTRY PAVILION RENOVATION AT THE FEDERAL BUILDING LOCATED AT 300 NORTH LOS ANGELES STREET IN LOS ANGELES, CALIFORNIA.
  • $4,300 - Monday the 12th of March 2012
    Public Buildings Service
    LOS ANGELES SERVICE CENTER, NORTH LOS ANGELES FIELD OFFICE
    ABATE THE INSULATION; CLEAN, DISINFECT, MONITOR, AND RUN CLEARANCE CASSETTES OF THE SOUTH BASEMENT AIR HANDLER UNIT FEDERAL BUILDING, 300 N LOS ANGELES ST, LOS ANGELES, CA
  • $3,766 - Friday the 9th of March 2012
    Public Buildings Service
    LOS ANGELES SERVICE CENTER, NORTH LOS ANGELES FIELD OFFICE
    PROJECT: AIR HANDLER UNIT IN THE NORTH BASEMENT MECHANICAL ROOM OF THE FEDERAL BUILDING, 300 N. LOS ANGELES ST., LOS ANGELES. TO PERFORM MOLD SAMPLING, ABATEMENT, INSPECTION, MONITORING AND CLEARANCE IN THE BASEMENT AIR HANDLER ON THE NORTH SIDE OF THE FEDERAL BUILDING.
  • $35,580 - Wednesday the 28th of March 2012
    Public Buildings Service
    FACILITIES MANAGEMENT&SVCS PROGRAM DIVISION, CONTRACTS SECTION
    NON- ARRA LEED CAFETERIA ABATEMENT MONITORING THE PURPOSE OF THIS MODIFICATION IS TO INCLUDE ADDITIONAL ABATEMENT MONITORING FOR THE CONSTRUCTION OF THE CAFETERIA, IN AN AMOUNT NOT TO EXCEED OF $35,580.00. THE WORK TO BE PROVIDED IN SECOND (2ND) FLOOR IN AN AMOUNT OF $29,932.75 AND THE EAST LOBBY AREA IN AN AMOUNT OF $5,656.25. IN ADDITION, THE CONTRACT DELIVERY DATE IS EXTENDED FROM SEPTEMBER 30, 2011 TO FEBRUARY 29, 2012 DUE TO THE ADDITIONAL WORKS. PLEASE NOTE: THIS MODIFICATION IS NOT FUNDED BY THE RECOVERY ACT. PLEASE TRACK AND INVOICE SEPARATELY FOR ARRA FUNDED WORKS. DO NOT INCLUDE THIS MODIFICATION INTO THE ARRA FEDERAL REPORTING. THIS CHANGE WILL INCREASE THE CONTRACT TOTAL PRICE FROM $28,400.00 TO $63,980.00. ARRA FUNDED: NO CHNAGED - $28,400. NON -ARRA FUNDED: CHANGED TO $35,580 ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED.
  • $2,455 - Tuesday the 3rd of July 2012
    Public Buildings Service
    DESIGN AND CONSTRUCTION DIVISION
    THIS MODIFICATION IS BEING ISSUED TO PROVIDE FOR ALL LABOR, EQUIPMENT, AND MATERIALS NECESSARY TO PROVIDE FOR FIVE (5) ADDITIONAL AIR MONITORING SHIFTS, ALONG WITH ALL ASSOCIATED TESTING, DURING LEAD ABATEMENT WORK ON THE EXISTING STEEL COLUMNS AS A PART OF THE WEST ENTRY PAVILION RENOVATION OCCURRING AT THE FEDERAL BUILDING LOCATED AT 300 NORTH LOS ANGELES STREET IN LOS ANGELES, CALIFORNIA.

© Copyright 2019
The Collier Report
published by 1918 Media LLC.
Information displayed in this dossier has been provided through available open source or public sources. No reliance should be made by readers or Collier Report subscribers. Funding actions are complicated and do not always represent dollar-for-dollar payments to vendors nor do they represent payments in certain instances. Requests for the modification of displayed information may be made to help.desk@1918.media.