The Collier Report of U.S. Government Contracting

Old School Reporting Using Modern Technology

Hohl Industrial Services Inc

  • Contact Person: Molly Britt
  • Contact Phone: 716-332-0466
  • Contact Email: mbritt@hohlind.com
  • Business Structure:
  • Corporate Entity (Not Tax Exempt)
  • Business Type:
  • For Profit Organization
  • Industries Served: Water and Sewer Line and Related Structures Construction, Oil and Gas Pipeline and Related Structures Construction, Power and Communication Line and Related Structures Construction, Highway, Street, and Bridge Construction, Other Heavy and Civil Engineering Construction, Structural Steel and Precast Concrete Contractors, Other Foundation, Structure, and Building Exterior Contractors, Other Building Equipment Contractors, All Other Specialty Trade Contractors, Prefabricated Metal Building and Component Manufacturing, Fabricated Structural Metal Manufacturing, Rolling Mill and Other Metalworking Machinery Manufacturing, All Other Support Services
  • Product Areas: LAND (MANAGEMENT/SUPPORT), R&D- NATURAL RESOURCE: LAND (MANAGEMENT/SUPPORT)

Sampling of Federal Government Funding Actions/Set Asides

In order by amount of set aside monies.

  • $931,200 - Friday the 28th of December 2012
    Saint Lawrence Seaway Development Corporation
    DEPT OF TRANS/SLSDC
    IGF::OT::IGF AWARD ADDITIONAL CONTRACT LINE ITEM ACCORDING TO THE TERMS OF THE CONTRACT.
  • $9,000 - Thursday the 1st of December 2011
    Department Of Army
    W072 ENDIST PITTSBURGH
    GATE #1 REHABILITATION
  • $76,500 - Monday the 11th of June 2012
    Department Of Navy
    NAVAL FAC ENGINEERING CMD MID LANT
    REPAIR PEDESTRIAN BRIDGE&QUAY WALL
  • $454,758 - Tuesday the 17th of July 2012
    Saint Lawrence Seaway Development Corporation
    DEPT OF TRANS/SLSDC
    FURNISH ALL PLANT, LABOR, AND EQUIPMENT TO MODIFY THE NORTH SIDE VALVE OPERATING EQUIPMENT AT BOTH EISENHOWER AND SNELL LOCKS LOCATED IN MASSENA, NY.
  • $39,562 - Monday the 17th of September 2012
    Department Of Navy
    NAVAL FAC ENGINEERING CMD MID LANT
    REPAIR PEDESTRIAN BRIDGE&QUAY WALL
  • $39,290 - Wednesday the 15th of February 2012
    Saint Lawrence Seaway Development Corporation
    DEPT OF TRANS/SLSDC
    ADDITIONAL WORK TO REMOVE AND REPOSITION THE EISENHOWER LOCK NORTH DOWNSTREAM OUTBOARD TORQUE SHAFT BEARING SUPPORT, AND TO REMOVE LOOSE ANCHORS
  • $24,851 - Monday the 17th of September 2012
    Department Of Navy
    NAVAL FAC ENGINEERING CMD MID LANT
    REPAIR PEDESTRIAN BRIDGE&QUAY WALL
  • $202,907 - Monday the 17th of September 2012
    Department Of Navy
    NAVAL FAC ENGINEERING CMD MID LANT
    REPAIR PEDESTRIAN BRIDGE&QUAY WALL
  • $20,000 - Tuesday the 3rd of April 2012
    Saint Lawrence Seaway Development Corporation
    DEPT OF TRANS/SLSDC
    AWARD INCENTIVE FEE IN ACCORDANCE WITH CONTRACT TERMS FOR EARLY COMPLETION.
  • $10,494,400 - Friday the 28th of December 2012
    Saint Lawrence Seaway Development Corporation
    DEPT OF TRANS/SLSDC
    IGF::OT::IGF CONSTRUCT/INSTALL AN ICE FLUSHING SYSTEM AT SNELL LOCK IN MASSENA, NY.

© Copyright 2019
The Collier Report
published by 1918 Media LLC.
Information displayed in this dossier has been provided through available open source or public sources. No reliance should be made by readers or Collier Report subscribers. Funding actions are complicated and do not always represent dollar-for-dollar payments to vendors nor do they represent payments in certain instances. Requests for the modification of displayed information may be made to help.desk@1918.media.