  • $35,856 - Thursday the 2nd of February 2012
    Public Buildings Service
    ACQUISITION DIV/PROGRAM SUPPORT&CAPITAL PROJECTS
    THE PURPOSE OF THIS MODIFICATION IS TO AUTHORIZE THE CONTRACTOR TO PROVIDE ALL LABOR AND MATERIALS FOR THE FOLLOWING: (1) ADDITIONAL COST OF INSTALLING EXTERIOR STAINLESS STEEL ESCUTCHEON RINGS AROUND THE GROUND FLOOR STORM LEAD PIPES; (2) ADDING NEW FLOOR SUPPORTS FOR EXISTING ELEVATORS #1 AND #2. DURING FLOORING REPLACEMENT, IT WAS NOTICED THAT HTE NECESSARY STEEL SUPPORTS FOR THE FLOOR WAS NOT PRESENT IN THE EXISTING ELEVATORS; (3) ADDITIONAL COST OF THE ADA REVISIONS MADE TO THE 3RD FLOOR BATHROOM, THE GROUND FLOOR SHOWER ROOM AND THE ADDITIONAL ADA RAMP TO THE GROUND FLOOR FITNESS AREA.
  • $22,500 - Wednesday the 31st of October 2012
    Public Buildings Service
    ACQUISITION DIV/PROGRAM SUPPORT&CAPITAL PROJECTS
    MODIFICATION FOR UPGRADE THE EXISTING HOT WATER HEAT LOOP BY 1. REPLACE/UPGRADE 16 DI-ELECTRIC UNIONS WITH PROPRESS (OR EQUAL) UNIONS RATED TO 250F (VS 200F FOR THE DI-ELECTRIC UNIONS), 2. MODIFY THE CONTROLS SEQUENCE TO INCLUDE ADDITIONAL SAFETIES ON THE HOT WATER LOOP SYSTEM, AND 3. REPLACE ANY ASSOCIATED PIPE INSULATION IN THE MARTIN LUTHER KING, JR. FEDERAL BUILDING, ATLANTA, GEORGIA.
  • $164,523 - Monday the 3rd of December 2012
    Public Buildings Service
    ACQUISITION DIV/PROGRAM SUPPORT&CAPITAL PROJECTS
    OTHER FUNCTIONS RENOVATION OF MLK FEDERAL BUILDING, ATLANTA, GA THE PURPOSE OF THIS MODIFICATION IS TO PROVIDE ALL LABOR AND MATERIALS FOR THE FOLLOWING: (1) FURNISH AND INSTALL 1 FIRE ALARM SPEAKER INSIDE STAIRWELL #2; (2) PATCH AND PAINT ALL AFFECTED LOCATIONS WHERE NEW SPRINKLER HEADS AND THE SPEAKER ARE INSTALLED; (3) FURNISH AND INSTALL 2 AUTOMATIC SPRINKLER HEADS AND PIPING IN STAIR #2. THIS WORK SHALL BE PERFORMED IN ACCORDANCE WITH YOUR PROPOSALS PC-0079 DATED FEBRUARY 1, 2012. THE TOTAL COST OF THIS MODIFICATION IS $3,192.00. THE NEW CONTRACT TOTAL IS $61,068,009.67. THE PERIOD OF PERFORMANCE REMAINS UNCHANGED.
  • $144,140 - Monday the 3rd of December 2012
    Public Buildings Service
    ACQUISITION DIV/PROGRAM SUPPORT&CAPITAL PROJECTS
    OTHER FUNCTIONS RENOVATION OF MLK FEDERAL BUILDING, ATLANTA, GA CONTRACTOR SHALL PROVIDE THE FOLLOWING: (1) ADDING FLOOR CORES FOR THE 1ST, 2ND, AND 3RD FLOORS; (2) ADDING A NEW BOOSTER PUMP ON THE TERRACE LEVEL ; (3) ADDING STAIR TREADS TO STAIRWELL #2; (4) WATERPROOFING UNDER THE FORSYTH STREET ADA METAL RAMP; (5) ADDING PUSH/PULL ROUND BUTTONS TO GLASS DOORS; (6) OVERHAULING THE EXISTING AIR HANDLING UNITS ON FLOORS 2 AND 3; AND (7) INSTALLING THERMOSTATS ON REVISED DEMOUNTABLE WALL PARTITIONS ON FLOOR 2 AND 3.

© Copyright 2019
The Collier Report
published by 1918 Media LLC.
Information displayed in this dossier has been provided through available open source or public sources. No reliance should be made by readers or Collier Report subscribers. Funding actions are complicated and do not always represent dollar-for-dollar payments to vendors nor do they represent payments in certain instances. Requests for the modification of displayed information may be made to help.desk@1918.media.