The Collier Report of U.S. Government Contracting

Old School Reporting Using Modern Technology

Grunley/goel Jv C Llc

Sampling of Federal Government Funding Actions/Set Asides

In order by amount of set aside monies.

  • $969 - Thursday the 23rd of February 2012
    Department Of Army
    W2SD ENDIST BALTIMORE
    SECURITY IMPROVEMENTS
  • $79,227 - Tuesday the 3rd of January 2012
    Department Of Army
    W2SD ENDIST BALTIMORE
    SECURITY IMPROVEMENTS FIELD CHANGES AK AND BP. CHANGE AK: SECURITY SERVER RELOCATION; CHANGE BP: D-B CONDUIT TO DALECARLIA GUARD HOUSE
  • $67,789 - Friday the 30th of December 2011
    Department Of Army
    W2SD ENDIST BALTIMORE
    SECURITY IMPROVEMENTS: CHANGE¿AI¿¿ CREDIT DALECARLIA MAIN GATE MANHOLE AND CONDUIT: PROVIDE A CREDIT TO THE GOVERNMENT FOR LABOR, MATERIALS, AND EQUIPMENT FOR THE FOLLOWING WORK THAT WILL NOT BE PERFORMED AT THE DALECARLIA MAIN GATE: A. INSTALLATION OF THE NEW ELECTRICAL MANHOLE SHOWN ON PLATE 31 TO BE INSTALLED ON THE SOUTHWEST CORNER OF DALECARLIA PLACE ROAD. B. INSTALLATION OF THE FOUR (4) NEW 4-INCH PVC-COATED RGS CONDUITS FOR POWER, FIBER, AND SPARES. C. TRENCHING AND/OR BORING UNDER THE ROAD FROM THE PROPOSED NEW MANHOLE (DELETED ABOVE) TO THE EXISTING MANHOLE # 8, AND INSTEAD USING TWO (2) OF THE SPARE 4-INCH CONDUIT ALREADY INSTALLED FROM MANHOLE # 8 TO EXISTING MANHOLE # 38, TO RUN FIBER AND POWER PER REVISED PLATE 31. CHANGE¿AQ¿¿ WEDGE BARRIERS AT MCMILLAN: PROVIDE ALL MATERIAL, LABOR, AND EQUIPMENT NECESSARY TO INSTALL WEDGE BARRIERS AT THE MCMILLAN MAIN GATE ENTRANCE IN LIEU OF THE POP UP BOLLARDS CALLED OUT IN THE CONTRACT DRAWINGS. THE BASIS OF DESIGN SHALL BE A TWO WEDGE SYSTEM THAT IS K8 RATED. THE PORTION OF THE WEDGE FACING INCOMING TRAFFIC SHALL BE PAINTED TO MATCH THE BOLLARDS, AND NOT STRIPED AS CALLED OUT IN THE CONTRACT DRAWINGS. THE POP UP BOLLARDS THAT WERE TO BE ORIGINALLY INSTALLED SHALL BE TURNED OVER TO THE GOVERNMENT AS SPARE PARTS. REFERENCE REVISED PLATES 43, 44, 45 AND 72 (REVISION DATE 6/1/2011). CHANGE¿AR¿¿ INCREASE BOLLARD HEATER AMPERAGE: PROVIDE ALL MATERIAL, LABOR, AND EQUIPMENT NECESSARY TO INCREASE THE BOLLARD HEATER AMPERAGE TO ACCOMMODATE A 250-WATT HEATER, PER THE RESPONSE TO RFI-0028.
  • $24,142 - Tuesday the 24th of April 2012
    Department Of Army
    W2SD ENDIST BALTIMORE
    SECURITY IMPROVEMENTS
  • $21,550 - Tuesday the 6th of December 2011
    Department Of Army
    W2SD ENDIST BALTIMORE
    SECURITY IMPROVEMENTS
  • $20,733 - Wednesday the 4th of January 2012
    Department Of Army
    W2SD ENDIST BALTIMORE
    SECURITY IMPROVEMENTS FIELD CHANGES BG, BL, AND BM. CHANGE BG: ADDITIONAL DALECARLIA STORM STRUCTURE; CHANGE BL: DALECARLIA CORPAORATION STOP; CHANGE BM: EXTRA CONDUCTOR AT DALECARLIA GUARD HOUSE. $20,733.00 INCREASE TO CONTRACT. NO SCHEDULE CHANGE.
  • $144,599 - Monday the 11th of June 2012
    Department Of Army
    W2SD ENDIST BALTIMORE
    SECURITY IMPROVEMENTS
  • $1,102 - Tuesday the 3rd of January 2012
    Department Of Army
    W2SD ENDIST BALTIMORE
    SECURITY IMPROVEMENTS FIELD CHANGES AH, AJ, AM, AT, AU, AX, AY, AND BF
  • $1,025 - Tuesday the 1st of May 2012
    Department Of Army
    W2SD ENDIST BALTIMORE
    SECURITY IMPROVEMENTS

© Copyright 2019
The Collier Report
published by 1918 Media LLC.
Information displayed in this dossier has been provided through available open source or public sources. No reliance should be made by readers or Collier Report subscribers. Funding actions are complicated and do not always represent dollar-for-dollar payments to vendors nor do they represent payments in certain instances. Requests for the modification of displayed information may be made to help.desk@1918.media.