Grunley Construction Co Inc

  • Contact Person: Erick Miranda
  • Contact Phone: 240-399-2000
  • Contact Email: erickmiranda@grunley.com
  • Business Structure:
  • Corporate Entity (Not Tax Exempt)
  • Business Type:
  • For Profit Organization
  • Subchapter S Corporation
  • Industries Served: Steam and Air-Conditioning Supply, Industrial Building Construction, Commercial and Institutional Building Construction, Other Heavy and Civil Engineering Construction, Poured Concrete Foundation and Structure Contractors, Structural Steel and Precast Concrete Contractors, Masonry Contractors, Glass and Glazing Contractors, Roofing Contractors, Other Foundation, Structure, and Building Exterior Contractors, Electrical Contractors and Other Wiring Installation Contractors, Other Building Equipment Contractors, All Other Specialty Trade Contractors
  • Product Areas: SIGNS,AD DISPLAYS & IDENT PLATES, SIGNS, ADVERTISING DISPLAYS, AND IDENTIFICATION PLATES

Sampling of Federal Government Funding Actions/Set Asides

In order by amount of set aside monies.

  • $99,856 - Thursday the 27th of September 2012
    National Archives And Records Administration
    BUSINESS SUPPORT
    A2 ROOM 5500
  • $96,502 - Tuesday the 15th of April 2014
    Public Buildings Service
    GSA/PBS/R03 SOUTH SERVICE CENTER
    MODIFICATION TO FIX A DESIGN ERROR OF THE CAFE PORTION OF THE EAST LOW RISE ROOF. THE FLAT INSULATION WILL BE RIPPED UP AND REPLACED WITH 1/8 INCH TAPERED.
  • $95,000 - Tuesday the 9th of April 2013
    Public Buildings Service
    WPHBA - CAPITAL CONSTRUCTION BRANCH
    THIS MOD IS FOR INSTALLING A PORTAL TO THE WW STRUCTURE FOR THE WW&EW PROJECT.
  • $92,803 - Tuesday the 15th of April 2014
    Public Buildings Service
    GSA/PBS/R03 NORTH SERVICE CENTER
    NCC IMPROVEMENTS AT THE SOCIAL SECURITY ADMINISTRATION
  • $92,000 - Wednesday the 30th of May 2012
    Public Buildings Service
    WPHBA - CAPITAL CONSTRUCTION BRANCH
    TO PERFORM THE ADDITIONAL WORK OF RETURNING ROOM 277 BACK TO THE INTENDED PHASE II DESIGN IN CONJUNCTION WITH UPGRADES PER CE 109 (PHASE II), TO INCLUDE BUT NOT LIMITED TO ALL LABOR, MATERIALS, EQUIPMENT, AND FINISHES AS REFERENCED IN THE BASE DESIGN DRAWINGS DATED 7/20/07,
  • $91,000 - Tuesday the 9th of April 2013
    Public Buildings Service
    WPHBA - CAPITAL CONSTRUCTION BRANCH
    THIS MODIFICATION IS PERFORM THE ADDITIONAL WORK OF REROUTING EXISTING UTILITIES WITHIN THE EXISTING WW MECHANICAL ROOM SO AS TO NOT CONFLICT WITH THE PORTALS TO THE NEW STRUCTURE AND EXISTING UTILITIES THAT ARE IN CONFLICT WITH THE PORTALS TO THE NEW STRUCTURE SHALL BE DEMOLISHED PER THE BASE CONTRACT. THE CMC SHALL PROVIDE AND INSTALL A 250 GALLON CAPACITY DOMESTIC HOT WATER HEATER ALONG WITH 1-1/2 INCH AND 2 INCH DOMESTIC HOT WATER PIPING, RELOCATE THE EXISTING RECIRCULATION PUMP, PROVIDE POWER FOR THE TEMPORARY HOT WATER HEATER REMOVE AND DISPOSE OF THE DOMESTIC HOT WATER HEATER AND POWER CABLING AFTER PERMANENT DOMESTIC HOT WATER SYSTEM IS OPERATIONAL, AND ADVISE THE GOVERNMENT OF ANY SCHEDULE IMPACT (POSITIVE OR NEGATIVE) THAT WILL RESULT FROM UTILIZING THE TEMPORARY HOT WATER HEATER UNTIL SUCH TIME AS THE PERMANENT DOMESTIC HOT WATER SYSTEM IS COMPLETED, AS SPECIFIED IN THE ATTACHED CE099R1 DATED 9/29/11 FOR THE TOTAL AMOUNT OF $91,000.00. THIS RESULTS IN AN INCREASE TO THE CONTRACT IN THE AMOUNT OF $91,000.00
  • $89,000 - Tuesday the 9th of April 2013
    Public Buildings Service
    WPHBA - CAPITAL CONSTRUCTION BRANCH
    TO PERFORM THE ADDITIONAL WEST STRUCTURE REVISION WORK, WHICH INCLUDES BUT IS NOT LIMITED TO, REVISING THE ROUTING OF DUCTWORK AND PROVIDING WALL REVISIONS AND REQUIRED CREDITS AND ADDS, REMOVING AND DISPOSING OF AN EXISTING DISCONNECT AND CONDUITS (2 EA) FROM THE EXISTING SWITCHGEAR ROOM, FURNISHING AND INSTALLING AN ADDITIONAL LIGHT FIXTURE SIMILAR TO TYPE A, WITH A SOLID REFLECTOR WITH WIRE GUARD, 120- VOLT OPERATING BALLAST, AND SIDE WALL MOUNTING FOR ELEVATOR PITS #1 AND #2, AND OTHER WORK , AS SPECIFIED IN RFI'S 333,335,354,361 AND SI'S 86 AND 89 IN THE ATTACHED CE087R2 DATED 7/14/11
  • $88,026 - Tuesday the 24th of January 2012
    Smithsonian Institution
    SMITHSONIAN INSTITUTION
    MODIFICATION 06 - THIS IS CONTRACT F10CC10358 AWARDED FROM SOLICITATION F10SOL10009 FOR CONSTRUCTIONS SERVICES FOR THE CONVERSION OF THE GARAGE INFILL TO OFFICE SWING SPACE AT THE SMITHSONIAN INSTITUTION'S NATIONAL MUSEUM OF AMERICAN HISTORY, WASHINGTON, DC SEE SUPPORTING DOCUMENTS FOR COMPLETE CONTRACT AND JUSTIFICATION FOR THIS MODIFICATION.
  • $87,581 - Friday the 10th of February 2012
    Smithsonian Institution
    SMITHSONIAN INSTITUTION
    CHANGE ORDERS
  • $8,738 - Tuesday the 9th of April 2013
    Public Buildings Service
    WPHBA - CAPITAL CONSTRUCTION BRANCH
    THIS MODIFICATION SETTLES CE 132 DATED 3/23/12 FOR THE ADDITIONAL WORK OF MONITORING THE WATER FILTRATION SYSTEM (WFS) LOCAL MANUFACTURER'S CONTROLLER FOR COMMUNICATION LOSS, AND PROVIDING A HIGH-PRIORITY ALARM TO GSA WHC UPON LOSS OF COMMUNICATIONS TO THE WFS MANUFACTURER'S CONTROLLER TO INCLUDE PROGRAMMING PRIOR TO START-UP OF THE PERMANENT WFS. THE CMC SHALL PROVIDE, INSTALL AND TEST ONE #350KCMIL GROUND CONDUCTOR FROM THE NEW SWGR-WW208 TO THE EXISTING SWITCHGEAR TO BE REMOVED. ITEM 2: THIS MODIFICATION ALSO SETTLES CE 135 DATED 4/25/12 FOR THE ADDITIONAL WORK OF INSTALLING, WIRING, AND ACTIVATING THE FIRE ALARM SPEAKERS IN EGRESS STAIRS #1 AND #2 TO BROADCAST LIVE VOICE MESSAGES FROM THE BUILDINGS FIRE ALARM CONTROL PANEL ONLY; REMOVING (4) TWO-POST TELECOM RACKS IN ROOM B006 AND TURNING THEM OVER TO THE GOVERNMENT; INSTALLING (4) NEW GOVERNMENT FURNISHED TWO-POST CHATSWORTH RACKS IN ROOM B006; INSTALLING A SMALL (5/8") INNERDUCT WITH PULL-STRING INSIDE THE WW FOR CAMERA CABLING; AND OTHER WORK AS SPECIFIED.

© Copyright 2019
The Collier Report
published by 1918 Media LLC.
Information displayed in this dossier has been provided through available open source or public sources. No reliance should be made by readers or Collier Report subscribers. Funding actions are complicated and do not always represent dollar-for-dollar payments to vendors nor do they represent payments in certain instances. Requests for the modification of displayed information may be made to help.desk@1918.media.