The Collier Report of U.S. Government Contracting

Old School Reporting Using Modern Technology

E J Enterprises Incorporated

  • E J Enterprises Incorporated

  • View government funding actions
  • Glen Burnie, MD 210612700
  • Estimated Number of Employees: 45
  • Estimated Annual Receipts: $15,000,000

Sampling of Federal Government Funding Actions/Set Asides

In order by amount of set aside monies.

  • $999 - Friday the 10th of July 2015
    National Aeronautics And Space Administration
    GODDARD SPACE FLIGHT CENTER
    COMPREHENSIVE FABRICATION NEEDS FOR SPACEFLIGHT HARDWARE PARTS, INSTRUMENT COMPONENTS, STRUCTURES, FIXTURES, ASSEMBLY TOOLS, SPACE VEHICLE PARTS, ETC.; ASSEMBLY OF FABRICATED ITEMS AND ALL REQUIRED DOCUMENTATION. THE CONTRACTOR SHALL MANUFACTURE, ASSEMBLE, AND PREPARE DOCUMENTATION FOR SPACEFLIGHT AND NON-FLIGHT PARTS IN SUPPORT OF THE MANUFACTURING ENGINEERING GROUP AND GSFC PROJECTS. THE CONTRACTOR SHALL PROVIDE THE REQUIRED PERSONNEL, FACILITIES, AND MATERIALS, UNLESS OTHERWISE PROVIDED BY THE GOVERNMENT, TO ACCOMPLISH THE ISSUED DELIVERY ORDERS. THE CONTRACTOR SHALL PROVIDE EMERGENCY REPAIR OR MODIFICATION IN SUPPORT OF REJECTED OR DEFECTIVE CRITICAL ITEMS; THIS INCLUDES PERFORMING REPAIR OR MODIFICATION AND RETURNING TO GSFC WITHIN A NEGOTIATED TIME FRAME PER DELIVERY ORDER. THE CONTRACTOR SHALL FACILITATE TECHNICAL INTERCHANGE MEETINGS AT THE CONTRACTOR S FABRICATION FACILITY FOR DESIGN INTERPRETATION FOR WORK IN PROGRESS AND CONTRACTOR/END-USER COLLABORATION FOR CRITICAL ITEMS WITHIN A NEGOTIATED TIME FRAME PER DELIVERY ORDER. CRITICAL ITEMS ARE DEFINED AS THOSE SPACEFLIGHT AND GROUND SUPPORT ITEMS HAVING A SIGNIFICANT IMPACT ON TEST SCHEDULES, ASSEMBLY SCHEDULES, OR SHIPPING SCHEDULES AFFECTING LAUNCH SCHEDULES. APPROXIMATELY 40% OF THE WORK TO BE PERFORMED ON THIS CONTRACT WILL BE CONSIDERED CRITICAL.
  • $998 - Friday the 13th of July 2012
    US Coast Guard
    SFLC PROCUREMENT BRANCH 3
    S/N 9515-01-LG9-6332, SST, PLATE, 1/4", 48" X 96", 304 STAINLESS STEEL, DIAMOND PLATE QTY 1 PM
  • $9,958 - Tuesday the 21st of August 2012
    US Coast Guard
    SFLC PROCUREMENT BRANCH 3
    CGC TAHOMA'S UNIVERSAL BOAT CRADDLE MATERIAL (STEEL PLATING, SQUARE TUBING).
  • $995 - Friday the 18th of November 2011
    US Coast Guard
    SFLC PROCUREMENT BRANCH 3
    STEEL PLATE
  • $9,540 - Friday the 10th of July 2015
    National Aeronautics And Space Administration
    GODDARD SPACE FLIGHT CENTER
    CALL 16 COMPREHENSIVE FABRICATION NEEDS FOR SPACEFLIGHT HARDWARE PARTS, INSTRUMENT COMPONENTS, STRUCTURES, FIXTURES, ASSEMBLY TOOLS, SPACE VEHICLE PARTS, ETC.; ASSEMBLY OF FABRICATED ITEMS AND ALL REQUIRED DOCUMENTATION. THE CONTRACTOR SHALL MANUFACTURE, ASSEMBLE, AND PREPARE DOCUMENTATION FOR SPACEFLIGHT AND NON-FLIGHT PARTS IN SUPPORT OF THE MANUFACTURING ENGINEERING GROUP AND GSFC PROJECTS. THE CONTRACTOR SHALL PROVIDE THE REQUIRED PERSONNEL, FACILITIES, AND MATERIALS, UNLESS OTHERWISE PROVIDED BY THE GOVERNMENT, TO ACCOMPLISH THE ISSUED DELIVERY ORDERS. THE CONTRACTOR SHALL PROVIDE EMERGENCY REPAIR OR MODIFICATION IN SUPPORT OF REJECTED OR DEFECTIVE CRITICAL ITEMS; THIS INCLUDES PERFORMING REPAIR OR MODIFICATION AND RETURNING TO GSFC WITHIN A NEGOTIATED TIME FRAME PER DELIVERY ORDER. THE CONTRACTOR SHALL FACILITATE TECHNICAL INTERCHANGE MEETINGS AT THE CONTRACTOR S FABRICATION FACILITY FOR DESIGN INTERPRETATION FOR WORK IN PROGRESS AND CONTRACTOR/END-USER COLLABORATION FOR CRITICAL ITEMS WITHIN A NEGOTIATED TIME FRAME PER DELIVERY ORDER. CRITICAL ITEMS ARE DEFINED AS THOSE SPACEFLIGHT AND GROUND SUPPORT ITEMS HAVING A SIGNIFICANT IMPACT ON TEST SCHEDULES, ASSEMBLY SCHEDULES, OR SHIPPING SCHEDULES AFFECTING LAUNCH SCHEDULES. APPROXIMATELY 40% OF THE WORK TO BE PERFORMED ON THIS CONTRACT WILL BE CONSIDERED CRITICAL.
  • $9,111 - Thursday the 26th of April 2012
    US Coast Guard
    SFLC PROCUREMENT BRANCH 3
    1. STEEL PLATE 1 EA. 2. STEEL PLATE 1 EA. 3. ANGLE STEEL 1 EA. 4. PLATE 1 EA. 5. SQUARE STEEL TUBE 2 EA. 6. RECTANGLE STEEL TUBE 1 EA. 7. RECTANGLE STEEL TUBE 1 EA. 8. ROUND BAR 1 EA. 9. STEEL PLATE 1 EA. 10. ALUMINIM PLATE 1 EA. 11. FLAT BAR 1 EA. 12. ROUND BAR 1 EA. 13. STEEL SWUARE TUBE 1 EA. 14. STEEL PLATE 1 EA. 15. FLAT BAR 1 EA. 16. STEEL PLATE 6 EA. 17. RING 1 EA. 18. STEEL PLATE 1 EA. 19. STEEL PLATE 1 EA. 20. STRUCTURAL TEE BAR 1 EA. ALL PARTS FOR UNIVERSAL BOAT CRADLE FOR CGC EXCANABA.
  • $8,980 - Friday the 20th of April 2012
    US Coast Guard
    SFLC PROCUREMENT BRANCH 3
    MATERIAL FOR THE CGC BEAR, STEEL PLATE, TUBING, ALUMINUM PLATING.
  • $8,328 - Thursday the 13th of September 2012
    US Coast Guard
    SFLC PROCUREMENT BRANCH 3
    STEEL PLATING, ROUND BAR FOR CGC HARRIET LANE'S BOAT CRADLE
  • $8,292 - Wednesday the 23rd of May 2012
    US Coast Guard
    SFLC PROCUREMENT BRANCH 3
    MANGANESE BRONZE PLATE, ROUND STOCK
  • $7,464 - Friday the 10th of July 2015
    National Aeronautics And Space Administration
    GODDARD SPACE FLIGHT CENTER
    CALL 15 COMPREHENSIVE FABRICATION NEEDS FOR SPACEFLIGHT HARDWARE PARTS, INSTRUMENT COMPONENTS, STRUCTURES, FIXTURES, ASSEMBLY TOOLS, SPACE VEHICLE PARTS, ETC.; ASSEMBLY OF FABRICATED ITEMS AND ALL REQUIRED DOCUMENTATION. THE CONTRACTOR SHALL MANUFACTURE, ASSEMBLE, AND PREPARE DOCUMENTATION FOR SPACEFLIGHT AND NON-FLIGHT PARTS IN SUPPORT OF THE MANUFACTURING ENGINEERING GROUP AND GSFC PROJECTS. THE CONTRACTOR SHALL PROVIDE THE REQUIRED PERSONNEL, FACILITIES, AND MATERIALS, UNLESS OTHERWISE PROVIDED BY THE GOVERNMENT, TO ACCOMPLISH THE ISSUED DELIVERY ORDERS. THE CONTRACTOR SHALL PROVIDE EMERGENCY REPAIR OR MODIFICATION IN SUPPORT OF REJECTED OR DEFECTIVE CRITICAL ITEMS; THIS INCLUDES PERFORMING REPAIR OR MODIFICATION AND RETURNING TO GSFC WITHIN A NEGOTIATED TIME FRAME PER DELIVERY ORDER. THE CONTRACTOR SHALL FACILITATE TECHNICAL INTERCHANGE MEETINGS AT THE CONTRACTOR S FABRICATION FACILITY FOR DESIGN INTERPRETATION FOR WORK IN PROGRESS AND CONTRACTOR/END-USER COLLABORATION FOR CRITICAL ITEMS WITHIN A NEGOTIATED TIME FRAME PER DELIVERY ORDER. CRITICAL ITEMS ARE DEFINED AS THOSE SPACEFLIGHT AND GROUND SUPPORT ITEMS HAVING A SIGNIFICANT IMPACT ON TEST SCHEDULES, ASSEMBLY SCHEDULES, OR SHIPPING SCHEDULES AFFECTING LAUNCH SCHEDULES. APPROXIMATELY 40% OF THE WORK TO BE PERFORMED ON THIS CONTRACT WILL BE CONSIDERED CRITICAL.

© Copyright 2019
The Collier Report
published by 1918 Media LLC.
Information displayed in this dossier has been provided through available open source or public sources. No reliance should be made by readers or Collier Report subscribers. Funding actions are complicated and do not always represent dollar-for-dollar payments to vendors nor do they represent payments in certain instances. Requests for the modification of displayed information may be made to help.desk@1918.media.