The Collier Report of U.S. Government Contracting

Old School Reporting Using Modern Technology

Davidson Construction Inc

  • Davidson Construction Inc

  • View government funding actions
  • Holt, MN 567383000
  • Phone: 218-449-4865
  • Estimated Number of Employees: 40
  • Estimated Annual Receipts: $10,000,000
  • Business Start Date: 1991
  • Contact Person: Kim Nelson
  • Contact Phone: 218-449-4865
  • Contact Email: davconst@wiktel.com
  • Business Structure:
  • Corporate Entity (Not Tax Exempt)
  • Business Type:
  • For Profit Organization
  • Subchapter S Corporation
  • Industries Served: Highway, Street, and Bridge Construction, Other Heavy and Civil Engineering Construction, Site Preparation Contractors, All Other Specialty Trade Contractors, Specialized Freight (except Used Goods) Trucking, Local
  • Product Areas: AIR POLLUTION (OPERATIONAL), R&D- ENVIRONMENTAL PROTECTION: AIR POLLUTION (OPERATIONAL SYSTEMS DEVELOPMENT), AIR POLLUTION (MANAGEMENT/SUPPORT), R&D- ENVIRONMENTAL PROTECTION: AIR POLLUTION (MANAGEMENT/SUPPORT), WATER POLLUTION (OPERATIONAL), R&D- ENVIRONMENTAL PROTECTION: WATER POLLUTION (OPERATIONAL SYSTEMS DEVELOPMENT), R&D- ENVIRONMENTAL PROTECTION: OTHER (MANAGEMENT/SUPPORT), R&D-OTHER ENVIRONMENT-MGMT SUP, ENVIRONMENTAL SYSTEMS PROTECTION- AIR QUALITY SUPPORT, AIR QUALITY SUPPORT SERVICES, ENVIRONMENTAL SYSTEMS PROTECTION- WATER QUALITY SUPPORT, WATER QUALITY SUPPORT SERVICES, ENVIRONMENTAL SYSTEMS PROTECTION- LEAKING UNDERGROUND STORAGE TANK SUPPORT, LEAK UNDERGRND STORE TANK SUP, ENVIRON SYS PROTECT- DEVELOPMENT OF ENVIRON IMPACT STMTS/ASSESSMENTS, TECH ANALYSIS/ENVIRON AUDITS, DEV ENVIR IMPACT STMT/ASSESS, ENVIRONMENTAL SYSTEMS PROTECTION- ENVIRONMENTAL LICENSING AND PERMITTING

Sampling of Federal Government Funding Actions/Set Asides

In order by amount of set aside monies.

  • $414,394 - Thursday the 23rd of August 2012
    Department Of Army
    W07V ENDIST ST PAUL
    W912ES-12-C-0003 ROSEAU REACHES 2B/2C; THIS MODIFICATION PROVIDES FOR AN EQUITABLE ADJUSTMENT FOR PROPER REMOVAL, DISPOSAL AND/OR ABANDONMENT OF TRANSITE PIPE; REMOVAL AND/OR ABANDONMENT OF PVC PIPE; INSTALLATION OF ADDITIONAL HDPE PIPE; CHANGING FITTINGS AND VALVES TO CONNECT TO TRANSITE PIPE RATHER THAN CAST IRON AS ORIGINAL PLANS INDICATE; PROVIDE THE GOVERNMENT WITH A CREDIT FOR PIPE WHICH WILL NO LONGER BE REMOVED; PROVIDE THE GOVERNMENT WITH A CREDIT FOR FITTINGS WHICH WILL NO LONGER BE INSTALLED; PROVIDE THE GOVERNMENT WITH A CREDIT FOR MATERIALS WHICH ARE NO LONGER REQUIRED AND WILL BE RETURNED TO THE SUPPLIER; COMPENSATE THE CONTRACTOR FOR ASBESTOS ABATEMENT COSTS; COMPENSATE THE CONTRACTOR FOR IMPACT COSTS RELATED TO THE CHANGE, SPECIFICALLY STANDBY COSTS FOR TWO TRAILERS, REMOVAL AND REPLACEMENT OF THE LEVEES WITHIN THE PIPE ALIGNMENT AND DIRECT CHARGES RELATED TO PROPOSAL PREPARATION.
  • $20,445 - Friday the 1st of June 2012
    Department Of Army
    W07V ENDIST ST PAUL
    W912ES-12-C-0003 ROSEAU REACHES 2B/2C; THIS MODIFICATION INCLUDES THE REQUIREMENTS TO 1) CHANGE THE WORK LIMITS OF THE PROJECT IN LOCATIONS INDICATED IN GSL-002; 2) INCLUSION OF A NEW PERMEABILITY SPECIFICATION AND REQUIRED TESTS FOR THE CONTROLLED LOW STRENGTH MORTAR (CLSM) SURROUNDING THE PLASTIC SANITARY FORCEMAIN; 3) INSTALLATION OF WATERSTOP ON THE SANITARY FORCEMAIN IN ACCORDANCE WITH GSL-002; 4) CHANGE SIZE OF HDPE PIPE UNDER THE WEST AND EAST CHANNEL LEVEES AND WEST STORAGE LEVEE FROM 12" TO 14"; 5) CONDUCT EXPLORATORY EXCAVATIONS OF EXISTING 16¿ PVC SANITARY FORCE MAIN IN MULTIPLE LOCATIONS TO IDENTIFY THE COMPOSITION, LOCATION, CONDITION AND ELEVATION OF THE PIPE.
  • $12,779,645 - Monday the 14th of November 2011
    Department Of Army
    W07V ENDIST ST PAUL
    THIS CONTRACT IS FOR REACH 2B AND 2C OF THE ROSEAU FLOOD RISK MANAGEMENT PROJECT, PROVIDING FLOOD PROTECTION TO THE CITY OF ROSEAU, MN. WORK CONSISTS OF CONSTRUCTION OF DIVERSION CHANNEL, EARTHEN LEVEES, ROAD RAISE, AND ONE WATER CONTROL STRUCTURE, AMONG OTHER FEATURES.

© Copyright 2019
The Collier Report
published by 1918 Media LLC.
Information displayed in this dossier has been provided through available open source or public sources. No reliance should be made by readers or Collier Report subscribers. Funding actions are complicated and do not always represent dollar-for-dollar payments to vendors nor do they represent payments in certain instances. Requests for the modification of displayed information may be made to help.desk@1918.media.