The Collier Report of U.S. Government Contracting

Old School Reporting Using Modern Technology

Cutting Edge Group Llc

  • Contact Person: Antonio Abrantes
  • Contact Phone: 518-798-4151
  • Contact Email: tea@cuttingedge-group.com
  • Business Structure:
  • Partnership or Limited Liability Partnership
  • Business Type:
  • Minority Owned Business
  • Self Certified Small Disadvantaged Business
  • For Profit Organization
  • DOT Certified DBE
  • Limited Liability f
  • Native American Owned
  • American Indian Owned
  • Industries Served: Industrial Building Construction, Commercial and Institutional Building Construction, Water and Sewer Line and Related Structures Construction, Highway, Street, and Bridge Construction, Other Heavy and Civil Engineering Construction, Poured Concrete Foundation and Structure Contractors, Structural Steel and Precast Concrete Contractors, Framing Contractors, Electrical Contractors and Other Wiring Installation Contractors, Plumbing, Heating, and Air-Conditioning Contractors, Site Preparation Contractors, All Other Specialty Trade Contractors, Engineering Services, All Other Professional, Scientific, and Technical Services, Security Systems Services (except Locksmiths)
  • Product Areas: BATTERIES, RECHARGEABLE, WIRE AND CABLE, ELECTRICAL, MAINT/REPAIR/REBUILD OF EQUIPMENT- COMMUNICATION, DETECTION, AND COHERENT RADIATION EQUIPMENT, MAINT-REP OF COMMUNICATION EQ, MAINT-REP OF ELECT-ELCT EQ, MAINT/REPAIR/REBUILD OF EQUIPMENT- ELECTRICAL AND ELECTRONIC EQUIPMENT COMPONENTS, INSTALLATION OF EQUIPMENT- COMMUNICATION, DETECTION, AND COHERENT RADIATION EQUIPMENT, INSTALL OF COMMUNICATION EQ

Sampling of Federal Government Funding Actions/Set Asides

In order by amount of set aside monies.

  • $9,801 - Tuesday the 6th of March 2012
    Public Buildings Service
    GSA/PUBLIC BUILDINGS SERVICE
    FLOOR TILE REPLACEMENT AT ADMIN BLDG CHAMPLAIN LPOE
  • $9,574 - Friday the 24th of February 2012
    Public Buildings Service
    GSA/PUBLIC BUILDINGS SERVICE
    STREET LIGHT REPAIR AT CHAMPLAIN LPOE
  • $9,500 - Tuesday the 17th of January 2012
    Department Of Army
    W2SD ENDIST NEW YORK
    A00003-NP010 REMOVAL OF CONCRETE FOOTING (R00003)
  • $868,705 - Friday the 4th of May 2012
    Department Of Army
    W2SD ENDIST NEW YORK
    ALL COSTS IN CONNECTION WITH ALL REPAIRS
  • $746,311 - Tuesday the 24th of January 2012
    Department Of Army
    W0K9 USA WATERVLIET ARSNL
    FSC: Z1EC INSTALL FIRE PROTECTION SYSTEM BUILDINGS 38 AND 114, WATERVLIET ARSENAL
  • $7,460 - Tuesday the 22nd of May 2012
    Department Of Army
    W0K9 USA WATERVLIET ARSNL
    FSC:Z2LB THE PURPOSE OF THIS MODIFICATION IS TO ADD NEW HYDRANT/VALVE B20 FOR REPLACE SIDEWALK,REPAIR AT WATERVLIET ARSENAL.
  • $60,000 - Tuesday the 13th of November 2012
    National Park Service
    DSC CONTRACTING SERVICES DIVISION
    ADDS ORIGINAL WORK BACK INTO CONTRACT TAKEN OUT BECAUSE OF LACK OF CONTINENCY FUNDING THAT HAS BEEN RESTORED.
  • $50,000 - Wednesday the 7th of November 2012
    National Park Service
    DSC CONTRACTING SERVICES DIVISION
    GATEWAY NATIONAL RECREATION AREA, RIIS BOARDWALK, GATE 68275, MOD 0005 INCORPORATES ADDITIONAL LINEAR FOOTAGE OF BOARDWALK RAILING.
  • $49,958 - Tuesday the 6th of March 2012
    Department Of Army
    W0K9 USA WATERVLIET ARSNL
    FSC:Z2LB REPLACE SIDEWALK AND ADD HANDI-CAP RAMP, ACROSS FROM BUILDING 20 AT WATERVLIET ARSENAL.
  • $4,600 - Tuesday the 3rd of January 2012
    Department Of Army
    W071 ENDIST KANSAS CITY
    POCA - FT RILEY, KS

© Copyright 2019
The Collier Report
published by 1918 Media LLC.
Information displayed in this dossier has been provided through available open source or public sources. No reliance should be made by readers or Collier Report subscribers. Funding actions are complicated and do not always represent dollar-for-dollar payments to vendors nor do they represent payments in certain instances. Requests for the modification of displayed information may be made to help.desk@1918.media.