The Collier Report of U.S. Government Contracting

Old School Reporting Using Modern Technology

Construction Development Services Inc dba Cdsi

  • Construction Development Services Inc dba Cdsi

  • View government funding actions
  • Norfolk, VA 235022402
  • Phone: 757-459-2374
  • Estimated Number of Employees: 20
  • Estimated Annual Receipts: $8,000,000
  • Business Start Date: 2000
  • Contact Person: Chris Suber
  • Contact Phone: 757-459-2374
  • Contact Email: chriss@cdsi-va.com
  • Business Structure:
  • Corporate Entity (Not Tax Exempt)
  • Business Type:
  • Minority Owned Business
  • Self Certified Small Disadvantaged Business
  • For Profit Organization
  • Black American Owned
  • Subchapter S Corporation
  • Industries Served: New Single-Family Housing Construction (except For-Sale Builders), New Multifamily Housing Construction (except For-Sale Builders), New Housing For-Sale Builders, Residential Remodelers, Industrial Building Construction, Commercial and Institutional Building Construction, Poured Concrete Foundation and Structure Contractors, Structural Steel and Precast Concrete Contractors, Framing Contractors, Glass and Glazing Contractors, Roofing Contractors, Siding Contractors, Other Foundation, Structure, and Building Exterior Contractors, Electrical Contractors and Other Wiring Installation Contractors, Plumbing, Heating, and Air-Conditioning Contractors, Drywall and Insulation Contractors, Construction
  • Product Areas: LEASE-RENT OF CONTRUCT MATERIAL, LEASE OR RENTAL OF EQUIPMENT- CONSTRUCTION AND BUILDING MATERIALS

Sampling of Federal Government Funding Actions/Set Asides

In order by amount of set aside monies.

  • $983 - Wednesday the 8th of August 2012
    Department Of Navy
    NAVAL FAC ENGINEERING CMD MID LANT
    VARIOUS CUSTOMER REQUESTED CHANGES.
  • $9,686 - Friday the 10th of July 2015
    National Aeronautics And Space Administration
    GODDARD SPACE FLIGHT CENTER
    THE WORK TO BE DONE UNDER THIS PROJECT CONSISTS OF PROVIDING THE LABOR, EQUIPMENT, AND MATERIALS FOR THE MAIN GATE RECONFIGURATION PROJECT AT THE NATIONAL AERONAUTICS AND SPACE ADMINISTRATION, GODDARD SPACE FLIGHT CENTER, WALLOPS FLIGHT FACILITY, WALLOPS ISLAND, VIRGINIA 23337. THE SCOPE OF WORK FOR THIS PROJECT SHALL INCLUDE BUT IS NOT LIMITED TO: SITE WORK, MASONRY CONSTRUCTION, ASPHALT CONSTRUCTION, ELECTRICAL CONSTRUCTION, MECHANICAL CONSTRUCTION AND LANDSCAPING. THE WORK SHALL BE COMPLETE. IT INCLUDES FURNISHING, AS APPLICABLE OR MAY BE REQUIRED, ALL CONTRACTOR S PLANT, EQUIPMENT, SAFETY DEVICES, LABOR, TOOLS, MATERIALS, SUPPLIES, AND SERVICES; AND PERFORMING ALL OPERATIONS NECESSARY FOR OR INCIDENTAL TO A COMPLETE PROJECT IN CONFORMITY WITH THE DRAWINGS AND AS SET FORTH IN THE VARIOUS SECTIONS OF THE SPECIFICATIONS.
  • $96,659 - Monday the 12th of December 2011
    Department Of Navy
    NAVAL FAC ENGINEERING CMD MID LANT
    REPLACE EXHAUST DUCTS, BUILDING 3517
  • $95,254 - Friday the 10th of July 2015
    National Aeronautics And Space Administration
    GODDARD SPACE FLIGHT CENTER
    THE WORK TO BE DONE UNDER THIS PROJECT CONSISTS OF PROVIDING THE LABOR, EQUIPMENT, AND MATERIALS FOR THE MAIN GATE RECONFIGURATION PROJECT AT THE NATIONAL AERONAUTICS AND SPACE ADMINISTRATION, GODDARD SPACE FLIGHT CENTER, WALLOPS FLIGHT FACILITY, WALLOPS ISLAND, VIRGINIA 23337. THE SCOPE OF WORK FOR THIS PROJECT SHALL INCLUDE BUT IS NOT LIMITED TO: SITE WORK, MASONRY CONSTRUCTION, ASPHALT CONSTRUCTION, ELECTRICAL CONSTRUCTION, MECHANICAL CONSTRUCTION AND LANDSCAPING. THE WORK SHALL BE COMPLETE. IT INCLUDES FURNISHING, AS APPLICABLE OR MAY BE REQUIRED, ALL CONTRACTOR S PLANT, EQUIPMENT, SAFETY DEVICES, LABOR, TOOLS, MATERIALS, SUPPLIES, AND SERVICES; AND PERFORMING ALL OPERATIONS NECESSARY FOR OR INCIDENTAL TO A COMPLETE PROJECT IN CONFORMITY WITH THE DRAWINGS AND AS SET FORTH IN THE VARIOUS SECTIONS OF THE SPECIFICATIONS.
  • $85,171 - Sunday the 30th of September 2012
    Department Of Navy
    NAVAL FAC ENGINEERING CMD MID LANT
    DAM NECK - 430 REPLACE CEILING AND RE-LAMP THE AUDITORIUM
  • $85,080 - Wednesday the 16th of May 2012
    Department Of Navy
    NAVAL FAC ENGINEERING CMD MID LANT
    CLEAN BULLET TRAP OF SPENT LEAD AND REPLACE RUBBER MATS; REPAIR FILTER HOUSING; AND DEMOLITION OF LEAD CONTAMINATED DUCTWORK AND CLEANING OF FILTER HOUSING FOR BOTH RANGE VENTS.
  • $8,500 - Monday the 30th of July 2012
    Department Of Navy
    NAVAL FAC ENGINEERING CMD MID LANT
    OPTION YEAR ONE
  • $825 - Thursday the 20th of October 2011
    Department Of Navy
    NAVAL FAC ENGINEERING CMD MID LANT
    EMERGENCY ELECTRICAL SERVICE TO WEST END, JEBLCFS (LITTLE CREEK SITE)
  • $8,018 - Thursday the 26th of July 2012
    Department Of Navy
    NAVAL FAC ENGINEERING CMD MID LANT
    A DELAY CAUSED BY THE ACTIVITY REQUIRED AN ADDITIONAL MOBILIZATION COST FOR THE JLG USED BY THE PLUMBER TO RECONFIGURE THE DOWNSPOUTS
  • $79,905 - Friday the 3rd of August 2012
    Department Of Navy
    NAVAL FAC ENGINEERING CMD MID LANT
    BASE YEAR

© Copyright 2019
The Collier Report
published by 1918 Media LLC.
Information displayed in this dossier has been provided through available open source or public sources. No reliance should be made by readers or Collier Report subscribers. Funding actions are complicated and do not always represent dollar-for-dollar payments to vendors nor do they represent payments in certain instances. Requests for the modification of displayed information may be made to help.desk@1918.media.