Coastal Drilling East Llc dba Coastal Drilling East

  • Contact Person: Courtney Schwartz
  • Contact Phone: 304-692-9838
  • Contact Email: cschwartz@shaftdrillers.com
  • Business Structure:
  • Other
  • Business Type:
  • For Profit Organization
  • Limited Liability f
  • Industries Served: Support Activities for Oil and Gas Operations, Support Activities for Coal Mining, Other Heavy and Civil Engineering Construction, Other Foundation, Structure, and Building Exterior Contractors, All Other Specialty Trade Contractors
  • Product Areas: MINING, ROCK DRILLING, EARTH BORING, AND RELATED EQUIPMENT, MINING,ROCK DRILLING,EARTH BORE EQ, WELL DRILLING/EXPLORATORY SERVICES, NATURAL RESOURCES/CONSERVATION- WELL DRILLING/EXPLORATORY

Sampling of Federal Government Funding Actions/Set Asides

In order by amount of set aside monies.

  • $74,850 - Monday the 12th of March 2012
    Federal Highway Administration
    EASTERN FEDERAL LANDS HIGHWAY DIVISION
    PRA-GWMP 1A108-LC DTFH71-12-C-00001 INCREASE CONTRACT BY $74,850.00. NO CHANGE TO CONTRACT TIME.
  • $259,250 - Thursday the 15th of December 2011
    Federal Highway Administration
    EASTERN FEDERAL LANDS HIGHWAY DIVISION
    PRA-GWMP 1A108-LC DTFH71-12-C-00001 INCREASE CONTRACT BY $259,250.00. ADD 68 CALENDAR DAYS TO CONTRACT.
  • $249,000 - Tuesday the 3rd of January 2012
    Federal Highway Administration
    EASTERN FEDERAL LANDS HIGHWAY DIVISION
    PRA-GWMP 1A108-LC DTFH71-12-C-00001 INCREASE CONTRACT BY $249,000.00. ADD 24 CALENDAR DAYS TO CONTRACT.
  • $2,383,950 - Thursday the 30th of August 2012
    Federal Highway Administration
    EASTERN FEDERAL LANDS HIGHWAY DIVISION
    PRA-GWMP 1A108-LC INCREASE CONTRACT BY $2,383,950.00. NO CHANGE TO CONTRACT TIME.
  • $205,000 - Wednesday the 16th of November 2011
    Federal Highway Administration
    EASTERN FEDERAL LANDS HIGHWAY DIVISION
    SCHEDULE A - STABILIZATION OF TWO ROCK SLOPE SITES (TEMPORARY FIX) 1. INSTALLATION OF TEMPORARY TRAFFIC CONTROL DEVICES AND COORDINATION WITH OTHER CONTRACTOR(S) WORKING WITHIN PROJECT SITE. 2. ROCK SCALING TO REMOVE ANY LOOSE ROCK AND MATERIALS FROM SLOPE FACE THAT MAY PRESENT HAZARD TO TRAFFIC AND WORKERS. ROCK SLOPES SHOULD BE SCALED FROM TOP DOWN. ONLY HAND TOOLS BE UTILIZED DURING ROCK SCALING AND NO MACHINE SCALING SHOULD BE ALLOWED. THE EXACT LOCATIONS AND THE EXTENT OF THE AREAS TO BE SCALED WILL BE DETERMINED IN THE FILED BY THE CO. SALVAGE ALL SCALED ROCK AND DELIVER TO DANGERFIELD ISLAND, LOCATED APPROXIMATELY 9 MILES FROM PROJECT SITE. 3. DESIGN AND INSTALLATION OF TENSIONED ROCK ANCHORS ALONG THE CREST OF THE SLOPE. PROOF TEST ALL ROCK ANCHORS FOR A LOAD OF 50 KIPS. LOCK ANCHORS AT 7 KIPS 4. DESIGN AND INSTALLATION OF ACTIVE DRAPED ROCKFALL PROTECTION. SUSPEND ROCKFALL DRAPE ALONG THE CREST OF THE SLOPE AND DRAPE IT DOWN THE FACE SO AS TO RESTRAIN LOOSE AND BROKEN ROCK THAT MAY FALL. THE DRAPE SHOULD BE TERMINATED 4 FT ABOVE THE GROUND SURFACE. THE NET SHOULD CONSIST OF A LIGHTER MESH OVERLAIN BY A LARGE OPENING WIRE OR STEEL STRAND MESH NETTING. THE HIGH TENSILE STEEL WIRE FOR THE LARGE OPENING MESH SHOULD HAVE A MINIMUM DIAMETER OF 0.157 IN (4 MM) AND A TENSILE STRENGTH STEEL WIRE OF EQUAL TO OR GREATER THAN 256 KSI. 5. TEMPORARY TRAFFIC CONTROL CONCRETE BARRIERS FOR LANE CLOSURE AT MP 7.25 WILL REMAIN IN PLACE TILL APRIL 2011. PRICE FOR CONCRETE BARRIER PAID FOR ONCE. ANY RELOCATION OR MOVEMENT OF BARRIER IS INCIDENTAL TO BARRIER COST.

© Copyright 2019
The Collier Report
published by 1918 Media LLC.
Information displayed in this dossier has been provided through available open source or public sources. No reliance should be made by readers or Collier Report subscribers. Funding actions are complicated and do not always represent dollar-for-dollar payments to vendors nor do they represent payments in certain instances. Requests for the modification of displayed information may be made to help.desk@1918.media.