The Collier Report of U.S. Government Contracting

Old School Reporting Using Modern Technology

Classic Site Solutions Inc

  • Classic Site Solutions Inc

  • View government funding actions
  • Ludlow, MA 010561550
  • Phone:
  • Estimated Number of Employees: 20
  • Estimated Annual Receipts: $6,000,000
  • Business Start Date: 1980
  • Contact Person: Cheryl Sady
  • Contact Phone: 508-309-6660
  • Contact Email: cheryl@classicsitesolutions.com
  • Business Structure:
  • Corporate Entity (Not Tax Exempt)
  • Business Type:
  • Self Certified Small Disadvantaged Business
  • For Profit Organization
  • Economically Disadvantaged Women Small Owned Business
  • Woman Owned Small Business
  • Woman Owned Business
  • DOT Certified DBE
  • Subchapter S Corporation
  • Industries Served: Water Supply and Irrigation Systems, Sewage Treatment Facilities, Industrial Building Construction, Commercial and Institutional Building Construction, Water and Sewer Line and Related Structures Construction, Highway, Street, and Bridge Construction, Other Heavy and Civil Engineering Construction, Poured Concrete Foundation and Structure Contractors, Structural Steel and Precast Concrete Contractors, Framing Contractors, Masonry Contractors, Roofing Contractors, Siding Contractors, Other Foundation, Structure, and Building Exterior Contractors, Electrical Contractors and Other Wiring Installation Contractors, Plumbing, Heating, and Air-Conditioning Contractors, Construction
  • Product Areas: AIRCRAFT, FIXED WING, AIRCRAFT, ROTARY WING, MISCELLANEOUS AIRCRAFT ACCESSORIES AND COMPONENTS, MISCL AIRCRAFT ACCESSORIES COMPS, ENGINE ELECTRICAL SYSTEM COMPONENTS, AIRCRAFT PRIME MOVING, ENGINE ELECT SYS COMPS - AIRCRAFT, MISCELLANEOUS ENGINE ACCESSORIES, AIRCRAFT, MISC ENGINE ACCESSORIES - AIRCRAFT, MAINT/REPAIR/REBUILD OF EQUIPMENT- AIRCRAFT AND AIRFRAME STRUCTURAL COMPONENTS, MAINT-REP OF AIRCRAFT, MAINT/REPAIR/REBUILD OF EQUIPMENT- AIRCRAFT COMPONENTS AND ACCESSORIES, MAINT-REP OF AIRCRAFT COMPONENTS, MODIFICATION OF EQUIPMENT- AIRCRAFT AND AIRFRAME STRUCTURAL COMPONENTS, MOD OF AIRCRAFT, MODIFICATION OF EQUIPMENT- AIRCRAFT COMPONENTS AND ACCESSORIES, MOD OF AIRCRAFT COMPONENTS, TECHNICAL REPRESENTATIVE- AIRCRAFT AND AIRFRAME STRUCTURAL COMPONENTS, TECH REP SVCS/AIRCRAFT, TECH REP SVCS/AIRCRAFT COMPONENTS, TECHNICAL REPRESENTATIVE- AIRCRAFT COMPONENTS AND ACCESSORIES, INSTALLATION OF EQUIPMENT- AIRCRAFT AND AIRFRAME STRUCTURAL COMPONENTS, INSTALL OF AIRCRAFT, INSTALLATION OF EQUIPMENT- AIRCRAFT COMPONENTS AND ACCESSORIES, INSTALL OF AIRCRAFT COMPONENTS, LEASE-RENT OF AIRCRAFT, LEASE OR RENTAL OF EQUIPMENT- AIRCRAFT AND AIRFRAME STRUCTURAL COMPONENTS

Sampling of Federal Government Funding Actions/Set Asides

In order by amount of set aside monies.

  • $998,447 - Saturday the 1st of December 2012
    National Park Service
    DSC CONTRACTING SERVICES DIVISION
    IGF::OT::IGF OTHER FUNCTIONS. VAFO 112031, VALLEY FORGE NATIONAL HISTORICAL PARK, CHESTER COUNTY, PENNSYLVANIA, ESTABLISH SAFE AND NON-IMNPACTING TRAIL HEAD FOR YELLOW SPRINGS TRAIL.
  • $9,613 - Tuesday the 6th of December 2011
    Public Buildings Service
    GSA/PUBLIC BUILDINGS SERVICE
    REMVOVE AND INSTALL CARPET
  • $9,112 - Wednesday the 27th of June 2012
    National Park Service
    DSC CONTRACTING SERVICES DIVISION
    CHESAPEAKE&OHIO CANAL NATIONAL HISTORICAL PARK, REPAIR BREACH - MILE 12.5 - STORM DAMAGE HANNAH, WASHINGTON COUNTY, MARYLAND, CHOH-146533, MODIFICATION 0001 FOR IN-SCOPE WORK TO THE BREACH.
  • $883,611 - Monday the 31st of October 2011
    Public Buildings Service
    GSA/PUBLIC BUILDINGS SERVICE
    ADDS PHASE II TO CONTRACT
  • $8,241 - Wednesday the 4th of April 2012
    Public Buildings Service
    GSA/PUBLIC BUILDINGS SERVICE
    CHANGE SYSTEM SPECIFICATION FROM ELECTRIC TO HYDRALLIC.
  • $72,780 - Thursday the 13th of March 2014
    National Park Service
    DSC CONTRACTING SERVICES DIVISION
    GATE-153331 PAVEMENT REHABILITATION OF VARIOUS ROUTES, GATEWAY NATIONAL RECREATION AREA, NEW YORK MOD 1: ADD REPAIR/REPLACEMENT OF A COLLAPSED PIPE ON MAGRUDER ROAD NEAR BUILDING 74; AND TO ADD REVEGETATION TO THE EAST SIDE OF HARTSHORNE DRIVE, BETWEEN STATIONS 2+20 AND 21+50.
  • $694,792 - Friday the 19th of April 2013
    National Park Service
    DSC CONTRACTING SERVICES DIVISION
    IGF::OT::IGF GETT 192985, GETTYSBURG NMP, PA --ROAD SAFETY IMPROVEMENT, CONSTRUCTION OF PEDESTRIAN/BICYCLE TRAIL ALONG TANEYTOWN ROAD
  • $6,595 - Wednesday the 28th of December 2011
    Department Of Army
    W2SD ENDIST NEW ENGLAND
    THISARRA FUNDED MODIFICATION IS BEING ISSUED TO RE-MOBILIZE WATER BLASTING AND LINE STRIPING CREWS TO COMPLETE ROAD LINE STRIPING WORK ON THE NORTH SIDE OF BUILDING 15 AT USASSC, NATICK, MA. THE WORK COULD NOT BE COMPLETED PREVIOUSLY BECAUSE COORDINATION WAS NOT MADE TO ENSURE THAT CARS WERE REMOVED FROM THE WORK AREA.
  • $589,608 - Friday the 24th of August 2012
    National Park Service
    NER REGIONAL CONTRACTING
    REHABILITATE SHIPYARD GALLEY, BLDG. 10, BOSTON NATIONAL HISTORICAL PARK, BOSTON, MA
  • $56,592 - Thursday the 3rd of November 2011
    Public Buildings Service
    GSA/PUBLIC BUILDINGS SERVICE
    MINOR ALT USDC CLERKS OFFICE, DONOHUE FB

© Copyright 2019
The Collier Report
published by 1918 Media LLC.
Information displayed in this dossier has been provided through available open source or public sources. No reliance should be made by readers or Collier Report subscribers. Funding actions are complicated and do not always represent dollar-for-dollar payments to vendors nor do they represent payments in certain instances. Requests for the modification of displayed information may be made to help.desk@1918.media.