The Collier Report of U.S. Government Contracting

Old School Reporting Using Modern Technology

Cimmaron Electric Inc

  • Cimmaron Electric Inc

  • View government funding actions
  • Lees Summit, MO 640822319
  • Phone: 816-525-2200
  • Estimated Number of Employees: 22
  • Estimated Annual Receipts: $6,850,000
  • Business Start Date: 1986
  • Contact Person: Russell Simmons
  • Contact Phone: 816-525-2200
  • Contact Email: office@cimmaron86.com
  • Business Structure:
  • Corporate Entity (Not Tax Exempt)
  • Business Type:
  • For Profit Organization
  • Industries Served: Commercial and Institutional Building Construction, Power and Communication Line and Related Structures Construction, Electrical Contractors and Other Wiring Installation Contractors, Plumbing, Heating, and Air-Conditioning Contractors, Other Building Equipment Contractors, Other Building Finishing Contractors, Facilities Support Services
  • Product Areas: MAINT/REPAIR/REBUILD OF EQUIPMENT- PLUMBING, HEATING, AND WASTE DISPOSAL EQUIPMENT, MAINT-REP OF PLUMBING-HEATING EQ, MAINT/REPAIR/REBUILD OF EQUIPMENT- VALVES, MAINT-REP OF VALVES, MAINT-REP OF ELECT-ELCT EQ, MAINT/REPAIR/REBUILD OF EQUIPMENT- ELECTRICAL AND ELECTRONIC EQUIPMENT COMPONENTS, MODIFICATION OF EQUIPMENT- REFRIGERATION, AIR CONDITIONING, AND AIR CIRCULATING EQUIPMENT, MOD OF REFRIGERATION - AC EQ, INSTALL OF ELECT-ELCT EQ, INSTALLATION OF EQUIPMENT- ELECTRICAL AND ELECTRONIC EQUIPMENT COMPONENTS, INSTALL OF FIBER OPTICS MATERIAL, INSTALLATION OF EQUIPMENT- FIBER OPTICS MATERIALS, COMPONENTS, ASSEMBLIES, AND ACCESSORIES, INSTALL OF LIGHTING FIXTURES, INSTALLATION OF EQUIPMENT- LIGHTING FIXTURES AND LAMPS

Sampling of Federal Government Funding Actions/Set Asides

In order by amount of set aside monies.

  • $72,090 - Monday the 5th of March 2012
    Public Buildings Service
    GSA/PUBLIC BUILDINGS SERVICE
    CONTRACTOR SHALL PROVIDE LABOR, MATERIALS AND SUPERVISION FOR THE FOLLOWING DISPOSAL, COORDINATION, EQUIPMENT AND SERVICES NECESSARY TO COMPLETE THE REQUIREMENTS TO REMOVE AND REPLACE EXISTING PIPING RUNNING FROM THE BUILDING TO THE METER PIT LOCATED ON THE EAST SIDE OF THE BUILDING. LOCATION: GENERAL SERVICE ADMINISTRATION 601 EAST 12TH ST., KCMO 64106.
  • $5,960 - Thursday the 27th of September 2012
    Public Buildings Service
    GSA/PUBLIC BUILDINGS SERVICE
    MODIFY THE EXISTING CONTRACT TO INCREASE WORK AND EXTEND DELIVERY DATE.
  • $5,960 - Monday the 2nd of July 2012
    Public Buildings Service
    GSA/PUBLIC BUILDINGS SERVICE
    CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIALS, DISPOSAL, SUPERVISION, COORDINATION, EQUIPMENT, AND SERVICES NECESSARY TO COMPLETE THE REQUIREMENTS: REPLACE TWO (2) GLYCOL PUMP/MOTOR ASSEMBLIES FOR SSA. LOCATION: SSA UPS ROOM DRY COOLERS IN GENERATOR FENCE AREA 601 EAST 12TH ST., KCMO 64106
  • $5,400 - Wednesday the 2nd of April 2014
    Public Buildings Service
    GSA/PUBLIC BUILDINGS SERVICE
    CONTRACTOR SHALL PROVIDE LABOR, MATERIALS AND SUPERVISION FOR THE FOLLOWING: PROVIDE O&M AFTER-HOURS ASSISTANCE DURING A DOMESTIC WATER SHUT DOWN REQUIRED TO ISOLATE THE FILTRINE UNITS FOR REPLACEMENT WORK. (30 MAN HOURS X $112.50) = $3,375.00 PROVIDE O&M AFTER-HOURS ASSISTANCE DURING A DOMESTIC WATER RE-FILL OF THE FILTRINE SYSTEM TO PLACE THE SYSTEM BACK ON LINE AFTER THE FILTRINE UNIT REPLACEMENT WORK. (18 MAN HOURS X $112.50) = $2,025.00
  • $4,400 - Wednesday the 2nd of April 2014
    Public Buildings Service
    GSA/PUBLIC BUILDINGS SERVICE
    CONTRACTOR SHALL PROVIDE LABOR, MATERIALS AND SUPERVISION FOR THE FOLLOWING: ATTACH NEW DIGITALLY CONTROLLED CHILLED WATER VALVES TO THE NECESSARY POWER AND DATA LOCATION TO CONTROL THE VALVES WITH THE BUILDING AUTOMATION SYSTEM. THE VALVES WILL BE ON THE CHILLED WATER LINES FOR THE COOLING COILS TO 18E1, 18E2, 18W1, AND 18W2 AIR HANDLERS. THE CONTRACTOR WILL ALSO BE RESPONSIBLE FOR HAVING THE CONTROL OF THE VALVES PROGRAMMED INTO THE BAS. LOCATION: 18TH FLOOR AIR HANDLERS 601 EAST 12TH ST., KCMO 64106 (SEE ATTACHED SCOPE OF WORK DATED AUGUST 30, 2012 AND CIMMARON ELECTRIC OFFEROR DATED AUGUST 21, 2012)
  • $3,943 - Friday the 4th of May 2012
    Public Buildings Service
    GSA/PUBLIC BUILDINGS SERVICE
    THE FOLLOWING SUPPLEMENTAL/BILATERAL MODIFICATION IS PROCESSED AS FOLLOWS: MODIFICATION ACTION: OBLIGATE ADDITIONAL FUNDS ORIGINAL CONTRACT AMOUNT: $72,090.00 OBLIGATION OF FUNDS: $ 3,943.38 NEW TOTAL: $76,033.38 REMARKS: DURING THE ORIGINAL PROJECT TO REPLACE THE 8 INCH FIRE MAIN AND THE 6 INCH POTABLE WATER MAIN, THE CONTRACTOR CAME UPON TO UNFORESEEN CONDITIONS. FIRST WAS THE BELL BUSHINGS WERE POURED INTO THE ORIGINAL BUILDING CONCRETE WALL AND NEEDED TO BE CORED DRILLED OUT. SECOND WAS A CONCRETE BEAM WAS POURED UNDERGROUND IN FRONT OF THE PIT THAT BLOCKED THE PATH OF THE PIPING AND NEEDED TO BE REMOVED. THIS PROJECT WAS VERY TIME SENSITIVE PROJECT. THE CONTRACTOR AND THE GSA REPRESENTATIVE FELT THAT THIS WAS THE OVERALL BEST SOLUTION TO KEEP THE PROJECT WITHIN THE SENSITIVE TIMEFRAME.
  • $21,979 - Wednesday the 2nd of April 2014
    Public Buildings Service
    GSA/PUBLIC BUILDINGS SERVICE
    MODIFICATION TO INCREASE THE MONTHLY COST OF OPERATION AND MAINTENANCE AT THE RICHARD BOLLING FEDERAL BUILDING, 601 E. 12TH STREET, KANSAS CITY, MO

© Copyright 2019
The Collier Report
published by 1918 Media LLC.
Information displayed in this dossier has been provided through available open source or public sources. No reliance should be made by readers or Collier Report subscribers. Funding actions are complicated and do not always represent dollar-for-dollar payments to vendors nor do they represent payments in certain instances. Requests for the modification of displayed information may be made to help.desk@1918.media.