The Collier Report of U.S. Government Contracting

Old School Reporting Using Modern Technology

Louis Berger Group Inc The

  • Contact Person: Bernice Calpo
  • Contact Phone: 973-407-1000
  • Contact Email: bcalpo@louisberger.com
  • Business Structure:
  • Corporate Entity (Not Tax Exempt)
  • Business Type:
  • For Profit Organization
  • Industries Served: Electric Bulk Power Transmission and Control, Water Supply and Irrigation Systems, Sewage Treatment Facilities, Industrial Building Construction, Commercial and Institutional Building Construction, Oil and Gas Pipeline and Related Structures Construction, Power and Communication Line and Related Structures Construction, Highway, Street, and Bridge Construction, Other Heavy and Civil Engineering Construction, Site Preparation Contractors, Architectural Services, Engineering Services, Drafting Services, Building Inspection Services, Geophysical Surveying and Mapping Services, Surveying and Mapping (except Geophysical) Services, Professional, Scientific, and Technical Services
  • Product Areas: SPECIAL STUDIES/ANALYSIS- AIR QUALITY, AIR QUALITY ANALYSES, STUDY/ARCHEOLOGICAL-PALEONTOLOGICAL, SPECIAL STUDIES/ANALYSIS- ARCHEOLOGICAL/PALEONTOLOGICAL, ECONOMIC STUDIES, SPECIAL STUDIES/ANALYSIS- ECONOMIC, SPECIAL STUDIES/ANALYSIS- ENDANGERED SPECIES: PLANT/ANIMAL, STUDY/ENDANGERED SPECIES-PLANT/ANIM, SPECIAL STUDIES/ANALYSIS- ENVIRONMENTAL ASSESSMENTS, STUDY/ENVIRONMENTAL ASSESSMENTS, SPECIAL STUDIES/ANALYSIS- FEASIBILITY (NON-CONSTRUCTION), STUDY/FEASIBILITY - NON-CONTRUCT, SPECIAL STUDIES/ANALYSIS- ANIMAL/FISHERIES, ANIMAL AND FISHERIES STUDIES, SPECIAL STUDIES/ANALYSIS- GEOLOGICAL, GEOLOGICAL STUDIES, GEOTECHNICAL STUDIES, SPECIAL STUDIES/ANALYSIS- GEOTECHNICAL, SPECIAL STUDIES/ANALYSIS- HISTORICAL, HISTORICAL STUDIES

Sampling of Federal Government Funding Actions/Set Asides

In order by amount of set aside monies.

  • $849,946 - Tuesday the 9th of June 2015
    Agency For International Development
    AGENCY FOR INTERNATIONAL DEVELOPMENT
    THE PURPOSE OF THIS MODIFICATION IS TO INCREASE THE TOTAL ESTIMATED COST OF THE TASK ORDER BY $849,946.34 FROM $125,035,804.34 TO $125,885,750.68 AND TO OBLIGATE $849,946.34 FOR A CUMULATIVE OBLIGATION OF $125,885,750.68.
  • $81,978 - Wednesday the 29th of April 2015
    Agency For International Development
    AGENCY FOR INTERNATIONAL DEVELOPMENT
    LBG-GEM3: CONTRACT MOD - ADDITIONAL FUNDING OF $81,978 TO COVER TRANSPORTATION AND LOGISTICS COST OF THE GEM EVALUATION TEAM
  • $764,000 - Wednesday the 25th of April 2012
    Agency For International Development
    AGENCY FOR INTERNATIONAL DEVELOPMENT
    TASK ORDER 8: MODIFICATION FOR INCREMENTAL FUNDING BY $764,000
  • $750,000 - Friday the 28th of September 2012
    Agency For International Development
    AGENCY FOR INTERNATIONAL DEVELOPMENT
    TASK ORDER 1: REQM FOR INCREMENTAL FUNDING BY $750,000
  • $724,000 - Tuesday the 12th of June 2012
    Agency For International Development
    AGENCY FOR INTERNATIONAL DEVELOPMENT
    TASK ORDER 1: REQM FOR INCREMENTAL FUNDING BY $724,000
  • $6,440,489 - Monday the 12th of March 2012
    Agency For International Development
    AGENCY FOR INTERNATIONAL DEVELOPMENT
    THE PURPOSE OF THIS MODIFICATION IS TO PROVIDE INCREMENTAL FUNDING OF $6,440,489.35 TO FULLY FUND THE TASK ORDER. THIS MODIFICATION ALSO EXTENDS THE TASK ORDER PERIOD OF PERFORMANCE FROM OCTOBER 31, 2011 TO DECEMBER 31, 2011.
  • $6,082,244 - Tuesday the 18th of September 2012
    Agency For International Development
    AGENCY FOR INTERNATIONAL DEVELOPMENT
    THE PURPOSE OF THIS MODIFICATION IS TO DO THE FOLLOWINGS: CLIN 3 MOD # 5 ADD SIX UNITS FOR TWO BEDROOM 400,000 CLIN 5 DINNING FACILITY $ 3,000,000 CLIN 8 REMOVE AND REINSTALL TOWER $ 300,000, CLIN 10 LOUNDRY FACILITY/CARWASH $ 500,000, CLIN 12 GENERAL CONSTRUCTION ACTIVITY $ 600,000 DEMOLISH EXISTING BUILDING ON THE RC PUMP AREA AND REGRADE FOR POSITIVE DRANAGE 378,000 INSTALL PAVERS AT NEW USAID PACKING LOT AT OC AND BUILD TWO 12 X 12 EC ROOMS AT RC $ 300,000. INSTALL TWO NEW DELTA BARRIARS AT THE MAIN CAC $ 595,000 TOTAL MODIFICATION $ 6,082,244.00
  • $5,441 - Monday the 2nd of June 2014
    Department Of Army
    W071 ENDIST KANSAS CITY
    THE PURPOSE OF THIS MODIFICATION IS TO OBLIGATE ADDITIONAL FUNDING FOR AWARD FEE FOR WROK AND SERVICES AT THE FORMAER SCHILLING AFB.
  • $5,401,829 - Friday the 10th of July 2015
    Agency For International Development
    AGENCY FOR INTERNATIONAL DEVELOPMENT
    TEC INCREASE AND INCREMENTAL FUNDING
  • $5,000,000 - Tuesday the 10th of July 2012
    Agency For International Development
    AGENCY FOR INTERNATIONAL DEVELOPMENT
    THE PURPOSE OF THIS MODIFICATION IS TO PROVIDE INCREMENTAL FUNDING IN THE AMOUNT OF $5,000,000.00; THEREBY INCREASING THE TOTAL OBLIGATED AMOUNT FROM 219,688,181.00 TO $224,658,181.00

© Copyright 2019
The Collier Report
published by 1918 Media LLC.
Information displayed in this dossier has been provided through available open source or public sources. No reliance should be made by readers or Collier Report subscribers. Funding actions are complicated and do not always represent dollar-for-dollar payments to vendors nor do they represent payments in certain instances. Requests for the modification of displayed information may be made to help.desk@1918.media.