The Collier Report of U.S. Government Contracting

Old School Reporting Using Modern Technology

Atk Space Systems Inc

  • Contact Person: Bill Gadsby
  • Contact Phone: 805-685-2262
  • Contact Email: bill.gadsby@orbitalatk.com
  • Business Structure:
  • Corporate Entity (Not Tax Exempt)
  • Business Type:
  • For Profit Organization
  • Manufacturer of Goods
  • Industries Served: Other Guided Missile and Space Vehicle Parts and Auxiliary Equipment Manufacturing
  • Product Areas: R&D-OTHER R & D-B RES, R&D- OTHER RESEARCH AND DEVELOPMENT (BASIC RESEARCH)

Sampling of Federal Government Funding Actions/Set Asides

In order by amount of set aside monies.

  • $549,779 - Tuesday the 31st of January 2012
    National Aeronautics And Space Administration
    GODDARD SPACE FLIGHT CENTER
    THE CONTRACTOR SHALL PROVIDE SUPPORT UNDER THIS CONTRACT DURING PHASE B, PHASE C/D, AND PHASE E/F OF THE GRAVITY AND EXTREME MAGNETISM (SMALL EXPLORERS) SMEX (GEMS) MISSION. THE GEMS PROJECT IS MANAGED BY THE NASA GODDARD SPACE FLIGHT CENTER (GSFC) FOR THE GEMS PRINCIPLE INVESTIGATOR, DR. JEAN SWANK, OF GSFC. THE CONTRACTOR SHALL PROVIDE THE TELESCOPE OPTICAL BOOM (TOB) FOR THE INSTRUMENT, WHICH INCLUDES SUPPORT FOR INTEGRATION TO THE INSTRUMENT BEING DEVELOPED BY THE GSFC. THE CONTRACTOR SHALL ESTABLISH, IMPLEMENT AND MAINTAIN A MANAGEMENT SYSTEM WHICH INTEGRATES MANAGEMENT DISCIPLINES, FUNCTIONS, AND SYSTEMS INTO AN OVERALL ACTIVITY TO ACHIEVE COST-EFFECTIVE PLANNING, ORGANIZING, CONTROLLING, AND REPORTING OF THE CONTRACT OBJECTIVES. THE CONTRACTOR SHALL ESTABLISH, IMPLEMENT AND MAINTAIN A SCHEDULING MANAGEMENT FUNCTION, WHICH DEVELOPS MONITORS AND MAINTAINS THE TELESCOPE OPTICAL BOOM (TOB) MASTER SCHEDULE AND DERIVATIVE DETAILED SCHEDULES FOR ALL MISSION ELEMENT ACTIVITIES UNDER ITS CONTROL, AS WELL AS PLANS FOR SCHEDULING ALL MISSION PHASES. THE CONTRACTOR SHALL SUBMIT MONTHLY TECHNICAL PROGRESS PRESENTATIONS. THE CONTRACTOR SHALL CONDUCT PEER REVIEWS WITH GSFC PARTICIPATION BEFORE THE SYSTEM LEVEL REVIEWS. THE CONTRACTOR SHALL PROVIDE THE NECESSARY RESOURCES TO PREPARE TECHNICAL AND PROGRAMMATIC DATA PACKAGES FOR DISTRIBUTION AT THE SYSTEM LEVEL REVIEWS. THE CONTRACTOR SHALL PROVIDE OVERALL MANAGEMENT OF GEMS TOB DEVELOPMENT THROUGH LAUNCH.
  • $2,550,000 - Tuesday the 8th of January 2013
    National Aeronautics And Space Administration
    GLENN RESEARCH CENTER
    IGF::OT::IGF MEGAFLEX FOR SOLAR ELECTRIC PROPULSION (SEP) SOLAR ARRAY SYSTEMS (SAS) NASA OFFICE OF THE CHIEF TECHNOLOGIST (OCT) GAME CHANGING DEVELOPMENT (GCD) PROGRAM SOLAR ARRAY SYSTEMS (SAS) PROJECT
  • $195,855 - Tuesday the 12th of June 2012
    National Aeronautics And Space Administration
    GODDARD SPACE FLIGHT CENTER
    THE CONTRACTOR SHALL PROVIDE SUPPORT UNDER THIS CONTRACT DURING PHASE B, PHASE C/D, AND PHASE E/F OF THE GRAVITY AND EXTREME MAGNETISM (SMALL EXPLORERS) SMEX (GEMS) MISSION. THE GEMS PROJECT IS MANAGED BY THE NASA GODDARD SPACE FLIGHT CENTER (GSFC) FOR THE GEMS PRINCIPLE INVESTIGATOR, DR. JEAN SWANK, OF GSFC. THE CONTRACTOR SHALL PROVIDE THE TELESCOPE OPTICAL BOOM (TOB) FOR THE INSTRUMENT, WHICH INCLUDES SUPPORT FOR INTEGRATION TO THE INSTRUMENT BEING DEVELOPED BY THE GSFC. THE CONTRACTOR SHALL ESTABLISH, IMPLEMENT AND MAINTAIN A MANAGEMENT SYSTEM WHICH INTEGRATES MANAGEMENT DISCIPLINES, FUNCTIONS, AND SYSTEMS INTO AN OVERALL ACTIVITY TO ACHIEVE COST-EFFECTIVE PLANNING, ORGANIZING, CONTROLLING, AND REPORTING OF THE CONTRACT OBJECTIVES. THE CONTRACTOR SHALL ESTABLISH, IMPLEMENT AND MAINTAIN A SCHEDULING MANAGEMENT FUNCTION, WHICH DEVELOPS MONITORS AND MAINTAINS THE TELESCOPE OPTICAL BOOM (TOB) MASTER SCHEDULE AND DERIVATIVE DETAILED SCHEDULES FOR ALL MISSION ELEMENT ACTIVITIES UNDER ITS CONTROL, AS WELL AS PLANS FOR SCHEDULING ALL MISSION PHASES. THE CONTRACTOR SHALL SUBMIT MONTHLY TECHNICAL PROGRESS PRESENTATIONS. THE CONTRACTOR SHALL CONDUCT PEER REVIEWS WITH GSFC PARTICIPATION BEFORE THE SYSTEM LEVEL REVIEWS. THE CONTRACTOR SHALL PROVIDE THE NECESSARY RESOURCES TO PREPARE TECHNICAL AND PROGRAMMATIC DATA PACKAGES FOR DISTRIBUTION AT THE SYSTEM LEVEL REVIEWS. THE CONTRACTOR SHALL PROVIDE OVERALL MANAGEMENT OF GEMS TOB DEVELOPMENT THROUGH LAUNCH.
  • $104,306 - Friday the 12th of September 2014
    National Aeronautics And Space Administration
    GODDARD SPACE FLIGHT CENTER
    TRIANA COILABLE BOOM. THE CONTRACTOR SHALL RECEIVE THE BOOM FROM GODDARD SPACE FLIGHT CENTER (GSFC) AND IN A DESIGNATED CLEAN AREA UN-BAG THE BOOM. THE CONTRACTOR SHALL USE, AS A MINIMUM, STANDARD CONTAMINATION CONTROL PROCEDURES REQUIRED ON THE ORIGINAL CONTRACT WHEN UN-BAGGING.

© Copyright 2019
The Collier Report
published by 1918 Media LLC.
Information displayed in this dossier has been provided through available open source or public sources. No reliance should be made by readers or Collier Report subscribers. Funding actions are complicated and do not always represent dollar-for-dollar payments to vendors nor do they represent payments in certain instances. Requests for the modification of displayed information may be made to help.desk@1918.media.