The Collier Report of U.S. Government Contracting

Old School Reporting Using Modern Technology

Apollo Construction Company Inc

  • Apollo Construction Company Inc

  • View government funding actions
  • San Francisco, CA 941243424
  • Phone: 415-587-7452
  • Estimated Number of Employees: 3
  • Estimated Annual Receipts: $1,121,254
  • Business Start Date: 1978
  • Contact Person: Christos Mastrokyriakos
  • Contact Phone: 415-587-7452
  • Contact Email: apollochristos@aol.com
  • Business Structure:
  • Corporate Entity (Not Tax Exempt)
  • Business Type:
  • Minority Owned Business
  • Self Certified Small Disadvantaged Business
  • For Profit Organization
  • Hispanic American Owned
  • Subchapter S Corporation
  • Industries Served: Industrial Building Construction, Commercial and Institutional Building Construction, Framing Contractors, Masonry Contractors, Glass and Glazing Contractors, Roofing Contractors, Siding Contractors, Electrical Contractors and Other Wiring Installation Contractors, Plumbing, Heating, and Air-Conditioning Contractors, Drywall and Insulation Contractors, Painting and Wall Covering Contractors, Flooring Contractors, Tile and Terrazzo Contractors, Finish Carpentry Contractors, Other Building Finishing Contractors, Site Preparation Contractors, Construction
  • Product Areas: AIR CONDITIONING EQUIPMENT, EQ TEST SVCS/REFRIGERATION - AC EQ, EQUIPMENT AND MATERIALS TESTING- REFRIGERATION, AIR CONDITIONING, AND AIR CIRCULATING EQUIPMENT, INSPECTION- REFRIGERATION, AIR CONDITIONING, AND AIR CIRCULATING EQUIPMENT, INSPECT SVCS/REFRIGERATION - AC EQ, MAINT/REPAIR/REBUILD OF EQUIPMENT- REFRIGERATION, AIR CONDITIONING, AND AIR CIRCULATING EQUIPMENT, MAINT-REP OF REFRIGERATION - AC EQ, INSTALLATION OF EQUIPMENT- REFRIGERATION, AIR CONDITIONING, AND AIR CIRCULATING EQUIPMENT, INSTALL OF REFRIGERATION - AC EQ

Sampling of Federal Government Funding Actions/Set Asides

In order by amount of set aside monies.

  • $91,706 - Saturday the 12th of May 2012
    Public Buildings Service
    SAN FRANCISCO SERVICE CENTER, GOLDEN GATE FIELD OFFICE
    USMS SPACE UPGRADE
  • $9,059 - Monday the 24th of September 2012
    Public Buildings Service
    SAN FRANCISCO SERVICE CENTER, GOLDEN GATE FIELD OFFICE
    450 GG PLAZA TEAK RESTORATION.
  • $90,145 - Friday the 27th of July 2012
    Public Buildings Service
    SAN FRANCISCO SERVICE CENTER, SANSOME FIELD OFFICE
    CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIALS, EQUIPMENT AND SUPERVISION TO: 1)RECEIVE AND INSTALL TWO (2) GOVERNMENT FURNISHED UPS UNITS IN SECOND FLOOR RM. 2150 2)PROVIDE PRIMARY WIRING TO THE NEW UPS UNITS FROM EXISTING SECOND FLOOR DISTRIBUTION BOARD HD2/T PER DRAWINGS AND SPECIFICATIONS 3) PROVIDE SECONDARY WIRING FROM TNE NEW UPS UNITS TO TWENTY FOUR (24) NEMA L6-20 ELECTRICAL OUTLETS IN SELECTED TELEPHONE CLOSETS AND SERVER ROOM PER DRAWINGS AND SPECIFICATIONS. 4) BE PRESENT AND PROVIDE ASSISTANCE DURING THE UPS UNITS FACTORY START-UP. 5) PROVIDE NEW EQUIPMENT NAMEPLATES FOLLOWING THE EXISTING BUILDING CODE. 6) VERIFY AND DOCUMENT FUNCTIONALITY OF EACH NEW OUTLETS AND ITS CONFORMANCE TO THE UPS PANEL SCHEDULE.
  • $751 - Friday the 28th of September 2012
    Public Buildings Service
    SAN FRANCISCO SERVICE CENTER, SANSOME FIELD OFFICE
    PROVIDE ALL LABOR TO HAVE DOP TESTING ON HEPA VACUUM.
  • $6,984 - Friday the 17th of August 2012
    Public Buildings Service
    SAN FRANCISCO SERVICE CENTER, GOLDEN GATE FIELD OFFICE
    ADDITIONAL WORK REQUIRED TO COMPLETE THE PROJECT
  • $69,781 - Friday the 18th of November 2011
    Public Buildings Service
    SAN FRANCISCO SERVICE CENTER, GOLDEN GATE FIELD OFFICE
    SPACE UPGRADE FOR INSPECTOR GENERAL
  • $5,167 - Wednesday the 8th of August 2012
    Public Buildings Service
    SAN FRANCISCO SERVICE CENTER, GOLDEN GATE FIELD OFFICE
    SEVENTH FLOOR ELEVATOR DOORSREPLACEMENT.
  • $4,327 - Thursday the 3rd of May 2012
    Public Buildings Service
    SAN FRANCISCO SERVICE CENTER, EAST BAY FIELD OFFICE
    THIS PS02 IS TO MODIFY AN EXISTING CONTRACT GS-09P-09-KS-D-0255 IN THE AMOUNT OF 4,326.70 FOR A NEW TOTAL OF $209,698.70. THIS MOD IS TO REMOVE THE WALL COVERING FROM THE LIBRARY AND THE ENTRY WAY. AND PURCHASE AND INSTALL NEW VCT IN THE BREAK ROOM.
  • $41,876 - Wednesday the 27th of June 2012
    Public Buildings Service
    SAN FRANCISCO SERVICE CENTER, SANSOME FIELD OFFICE
    CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIALS, EQUIPMENT AND SUPERVISION TO DEMOLISH&REMOVE INCINERATOR TO FREE UP EXTRA SPACE. INCINERATOR INTERIOR&EXTERIOR WILL BE TESTED FOR HAZMAT (ASBESTOS&LEAD PAINT). INSTALL CONTAINMENT AREA; ABATE LEAD PAINT&ASBESTOS; REMOVE FUEL TRAIN; REMOVE&SEAL FLUE; PATCH&PAINT WALLS&FLOOR. REFERENCE IHI ENVIRONMENTAL PROPOSAL FOR TESTING FOR HAZMAT, $4,311, 1/30/12.
  • $3,636 - Thursday the 1st of March 2012
    Public Buildings Service
    SAN FRANCISCO SERVICE CENTER, GOLDEN GATE FIELD OFFICE
    ADDITIONAL WORK

© Copyright 2019
The Collier Report
published by 1918 Media LLC.
Information displayed in this dossier has been provided through available open source or public sources. No reliance should be made by readers or Collier Report subscribers. Funding actions are complicated and do not always represent dollar-for-dollar payments to vendors nor do they represent payments in certain instances. Requests for the modification of displayed information may be made to help.desk@1918.media.