The Collier Report of U.S. Government Contracting

Old School Reporting Using Modern Technology

Apex Mechanical Inc

  • Contact Person: Daniel Dominguez
  • Contact Phone: 408-573-8260
  • Contact Email: ddominguez@apex.us.com
  • Business Structure:
  • Corporate Entity (Not Tax Exempt)
  • Business Type:
  • Minority Owned Business
  • Self Certified Small Disadvantaged Business
  • For Profit Organization
  • DOT Certified DBE
  • Hispanic American Owned
  • Subchapter S Corporation
  • Industries Served: Commercial and Institutional Building Construction, Roofing Contractors, Siding Contractors, Electrical Contractors and Other Wiring Installation Contractors, Plumbing, Heating, and Air-Conditioning Contractors, Other Building Finishing Contractors, Sheet Metal Work Manufacturing
  • Product Areas: INSTALLATION OF EQUIPMENT- REFRIGERATION, AIR CONDITIONING, AND AIR CIRCULATING EQUIPMENT, INSTALL OF REFRIGERATION - AC EQ, MAINTENANCE OF OFFICE BUILDINGS, REPAIR OR ALTERATION OF OFFICE BUILDINGS

Sampling of Federal Government Funding Actions/Set Asides

In order by amount of set aside monies.

  • $9,954 - Saturday the 1st of December 2012
    Public Buildings Service
    SAN FRANCISCO SERVICE CENTER, SANSOME FIELD OFFICE
    IGF::OT::IGF OTHER FUNCTIONS. CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIALS, EQUIPMENT AND SUPERVISION TO REMOVE EXISTING AIR COMPRESSORS PREVIOUSLY USED FOR PNEUMATIC CONTRAOLS, AND PAINT AND PATCH WALLS. SEE ATTACHED SCOPE OF WORK.
  • $9,953 - Friday the 27th of July 2012
    Public Buildings Service
    SAN FRANCISCO SERVICE CENTER, SANSOME FIELD OFFICE
    THE CONTRACTOR SHALL PROVIDE LABOR, MATERIALS AND SUPERVISION TO INSTALL NEW SUPPLY AIR FLEX CONNECTIOR ON AC 4; RESEAL 100 FT OF AIR DUCTING ON ROOF AND CHECK FOR LEAKS AFTER REPAIR.
  • $8,909 - Tuesday the 28th of August 2012
    Public Buildings Service
    SAN FRANCISCO SERVICE CENTER, SANSOME FIELD OFFICE
    THE CONTRACTOR SHALL PROVIDE LABOR, MATERIALS AND SUPERVISION TO INSTALL ORGANIZERS AND RE-PATCH ALL CABLES WITH NEW LENGTHS AS REQUIRED; RE-BUNDLE CABLES AND LABEL PANELS AND INDENTIFY AND LABEL ALL EXISTING DATA CABLES AT WORKSTATIONS AND LABEL FACE PLATES.
  • $8,900 - Friday the 23rd of March 2012
    Public Buildings Service
    SAN FRANCISCO SERVICE CENTER, SANSOME FIELD OFFICE
    CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIALS, EQUIPMENT AND SUPERVISION TO PAINT WALLS IN RM G21, 12 FEET VERTICAL WITH ONE COAT OF PAINT, PRIME EXISTING PATCH WORK, PAINT WALL ONE SIDE, PROTECTION FOR FLOOR INCLUDED, UP 17 FEET FROM FLOOR WILL BE PAINTED, PATCH EXISTING WALLS UP TO LEVEL 4, PAINT ALL EXISTING WHITE AND YELLOW PIPES, CLEAN ALL PIPE TO BE PAINTED AND PRIME AS NEEDED. CONTRACTOR SHALL CLEAN LOADING DOCK ARE WHERE STRIPES ARE TO BE RE-PAINTED AND PAINT LOADING DOCK YELLOW STRIPES.
  • $7,871 - Friday the 24th of February 2012
    Public Buildings Service
    SAN FRANCISCO SERVICE CENTER, CONSTRUCTION SERVICES BRANCH
    ADDITIONAL CONSTRUCTION SERVICES FOR THE ICE PROJECT.
  • $7,730 - Monday the 3rd of December 2012
    Public Buildings Service
    SAN FRANCISCO SERVICE CENTER, SANSOME FIELD OFFICE
    OTHER FUNCTIONS. THIS MODIFICATION IS ISSUED TO ADD ADDITIONAL FUNDS OF $7,730.00 TO INSTALL AN EIGHT INCH ISOLATION VALVE IN THE GROUND FLOOR MECHANICAL ROOM, AND REPAIR THE SHEET ROCK WITH MILDEW DAMAGE. THE ISOLATION VALVE IS NEEDED TO MAINTAIN THE SPRINKLER SYSTEMS. THE DELIVERY DATE OF JUNE 30, 2012 IS CHANGED TO JULY 31, 2012 TO ALLOW SUFFICIENT TIME FOR THE INSTALLATION. BOTH PARTIES AGREE TO THE INCREASE IN PRICE OF $7,730.00 AND AN EXTENSION OF TIME TO JULY 31, 2012. IN CONSIDERATION OF THIS MODIFICATION AGREED TO HEREIN AS COMPLETE EQUITABLE ADJUSTMENT, APEX MECHANICAL INC OF SAN JOSE, CA HEREBY RELEASES THE GOVERNMENT FROM ANY AND ALL LIABILITY UNDER THIS CONTRACT FOR FURTHER EQUITABLE ADJUSTMENTS ATTRIBUTABLE TO SUCH FACTS FOR CIRCUMSTANCES GIVING RISE TO THIS SUPPLEMENTAL AGREEMENT.
  • $6,373 - Friday the 2nd of December 2011
    Public Buildings Service
    SAN FRANCISCO SERVICE CENTER, SANSOME FIELD OFFICE
    CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIALS, EQUIPMENT AND SUPERVISION TO REPAIR TWO (2) BOILERS. BOILER ONE NEEDS A NEW M&M #237 LOW WATER CUTOFF. BOILER TWO IS EXCEPTIONALLY DIRTY AND FULL OF SOOT. THE SIDE PANEL WILL BE REMOVED SO THE WHOLE THING CAN BE WASHED DOWN.
  • $4,768 - Saturday the 1st of December 2012
    Public Buildings Service
    SAN FRANCISCO SERVICE CENTER, SANSOME FIELD OFFICE
    IGF::OT::IGF OTHER FUNCTIONS- CONTRACTOR SHALL PROVIDE LABOR, MATERIAL AND SUPERVISION TO INSTALL NEW SUPPLY AIR FLEX CONNECTOR ON AC 5 BECAUSE THE EXISTING CONNECTOR IS RIPPED. CONTRACTOR SHALL CHECK FOR LEAKS AFTER REPAIRS HAS BEEN COMPLETED.
  • $4,675 - Friday the 27th of July 2012
    Public Buildings Service
    SAN FRANCISCO SERVICE CENTER, SANSOME FIELD OFFICE
    THE CONTRACTOR SHALL PROVIDE LABOR, MATERIALS AND SUPERVISION TO INSTALL ONE (1) NEW AMP THREE POLE BREAKER IN PANEL L 15 LOCATED IN ROOM 105; INSTALL NEW 120/208 VOLT 3 PHASE, 4 WIRE BOLT ON SUB PANEL FROM NEW BREAKER IN PANEL L-15; RELOCATE THREE (3) ESISTING CIRCUITS IN PANEL TO MAKE ROOM FOR NEW 100 AMP BREAKER TO NEW SUB PANEL; AND INSTALL TWO NEW 30 AMP CIRCUITS WITH NEMA 36-30 RECEPTACLES FROM THE NEW SUB IN ROOM 105 TO THE SERVER ROOM TO SUPPORT NEW UPS UNITS.
  • $46,253 - Friday the 14th of October 2011
    Public Buildings Service
    SAN FRANCISCO SERVICE CENTER, SANSOME FIELD OFFICE
    CONTRACTOR SHALL PROVIDE ALL LABOR MATERIALS, EQUIPMENT AND SUPERVISION FOR THE 7TH FLOOR EQUIPMENT RACKS FOR ICE AT 630 SANSOME STREET.

© Copyright 2019
The Collier Report
published by 1918 Media LLC.
Information displayed in this dossier has been provided through available open source or public sources. No reliance should be made by readers or Collier Report subscribers. Funding actions are complicated and do not always represent dollar-for-dollar payments to vendors nor do they represent payments in certain instances. Requests for the modification of displayed information may be made to help.desk@1918.media.