The Collier Report of U.S. Government Contracting

Old School Reporting Using Modern Technology

Akima Infrastructure Services Llc

  • Akima Infrastructure Services Llc

  • View government funding actions
  • Anchorage, AK 995084256
  • Phone: 704-714-6416
  • Estimated Number of Employees: 64
  • Estimated Annual Receipts: $641,267
  • Business Start Date: 2005
  • Contact Person: Sharon Miller
  • Contact Phone: 703-766-6223
  • Contact Email: sharon.miller@akima.com
  • Business Structure:
  • Corporate Entity (Not Tax Exempt)
  • Business Type:
  • Alaskan Native Corporation Owned Firm
  • Minority Owned Business
  • Self Certified Small Disadvantaged Business
  • For Profit Organization
  • Limited Liability f
  • Native American Owned
  • Industries Served: Local Messengers and Local Delivery, All Other Publishers, Motion Picture and Video Production, Libraries and Archives, All Other Information Services, Engineering Services, Custom Computer Programming Services, Computer Systems Design Services, Computer Facilities Management Services, Other Computer Related Services, Administrative Management and General Management Consulting Services, Human Resources Consulting Services, Process, Physical Distribution, and Logistics Consulting Services, Other Scientific and Technical Consulting Services, Research and Development in the Physical, Engineering, and Life Sciences (except Biotechnology), All Other Professional, Scientific, and Technical Services, Administrative and Support and Waste Management and Remediation Services
  • Product Areas: HOUSEKEEPING- OTHER, OTHER HOUSEKEEPING SERVICES

Sampling of Federal Government Funding Actions/Set Asides

In order by amount of set aside monies.

  • $935,163 - Tuesday the 29th of March 2016
    Department Of Army
    W6QM MICC-FT GORDON
    (NON PERSONAL) PERSONNEL SERVICES
  • $871,875 - Wednesday the 17th of February 2016
    Department Of Army
    W6QK ACC ORLANDO
    FRONT END ANALYSIS AND COURSEWARE DEVELO
  • $822,073 - Tuesday the 29th of March 2016
    Department Of Army
    W6QM MICC-FT GORDON
    (NON PERSONAL) PERSONNEL SERVICES
  • $814,964 - Wednesday the 26th of September 2012
    Department Of Army
    W6QM MICC CTR-FT EUSTIS
    SUPPORT SERVICES
  • $634,570 - Thursday the 27th of October 2011
    Department Of Army
    W6QM MICC CTR-FT EUSTIS
    3RD OPTION EXERCIED FOR THE PERIOD 27 OCT 2011 - 26 OCT 2012
  • $59,519 - Friday the 10th of August 2012
    National Aeronautics And Space Administration
    JOHNSON SPACE CENTER
    THE CONTRACTOR SHALL PERFORM ISS ONBOARD GUIDANCE, NAVIGATION, AND CONTROL (GN&C) FLIGHT SOFTWARE IMPLEMENTATION AND VERIFICATION, ISS MULTIBODY FLEXIBLE DYNAMICS AND CONTROL ANALYSIS, AND ISS TIME DOMAIN SIMULATION TOOLS DEVELOPMENT. TO SUPPORT ISS MISSION READINESS, INTEGRATED GN&C SYSTEM SHALL BE SIMULATED AND TRADE STUDIES SHALL BE CONDUCTED TO VERIFY PERFORMANCE AND OPERATIONAL REQUIREMENTS FOR ALL ISS CONFIGURATIONS AND FLIGHT PHASES THROUGHOUT DESIGN ANALYSIS CYCLES (DAC) AND VERIFICATION ANALYSIS CYCLES (VAC). TO SUPPORT NASA EXPLORATION PROGRAMS, INTEGRATED GN&C SYSTEM SHALL BE SIMULATED AND TRADE STUDIES SHALL BE CONDUCTED TO CERIFY PERFORMANCE AND OPERATIONAL REQUIREMENTS FOR ALL FLIGHT PHASES AND CONFIGURATIONS FROM DESIGN ANALYSIS CYCLES (DAC) AND VERIFICATION ANALYSIS CYCLES (VAC). THE CONTRACTOR SHALL USE THE STATION ORBITER MULTI-FLEX BODY ANALYSIS TOOL (SOMBAT) NONLINEAR TIME DOMAIN SIMULATION SOFTWARE TO PERFORM CONTROL STRUCTURE INTERACTION ANALYSIS FOR THE REMAINING ISS ASSEMBLY STAGES AND OPERATIONS. THE GN&C OPERATIONS TO BE ANALYZED SHALL INCLUDE ATTITUDE HOLD, ATTITUDE MANEUVER, REBOOST, ROBOTIC OPERATIONS, AND SHUTTLE PROXIMITY OPERATIONS. THE CONTRACTOR SHALL PERFORM FLIGHT VERICATION ANALYSIS(VAC) OF THE INTERNATIONAL SPACE STATION GN&C SYSTEM TO DETERMINE GN&C FLIGHT READINESS FOR EACH ASSEMBLY FLIGHT. THE CONTRACTOR SHALL USE THE SOMBAT NONLINEAR TIME DOMAIN SIMULATION SOFTWARE TO PERFORM CONTROL STRUCTURE INTERACTION ANALYSIS FOR THE EXPLORATION VEHICLE OPERATION. ANALYSIS OF EXPLORATION VEHICLE OPERATIONS SHALL INCLUDE LAUNCH, ASCENT, ON-ORBIT, DOCKING, DESCENT, AND LANDING EVENTS. THE CONTRACTOR SHALL PERFORM DESIGN AND FLIGHT VERIFICATION ANALYSES TO SUPPORT THE EXPLORATION PROGRAM. THE CONTRACTOR SHALL ANALYZE THE PERFORMANCE OF THE INTERNATIONAL SPACE STATION GN&C SYSTEM DURING SHUTTLE REMOTE MANIPULATOR SUBSYSTEM (SRMS) AND SPACE STATION REMOTE MANIPULATOR SUBSYSTEM (SSRMS) OPERATIONS FOR APPLICABLE INTERNATIONAL SPACE STATION ASSEMBLY STAGES. THE ANALYSIS SHALL INCLUDE PAYLOAD MANEUVERING AND HAND-OFF OPERATIONS BY ROBOTIC SYSTEMS.
  • $50,000 - Friday the 31st of August 2012
    National Aeronautics And Space Administration
    JOHNSON SPACE CENTER
    THE CONTRACTOR SHALL PERFORM ISS ONBOARD GUIDANCE, NAVIGATION, AND CONTROL (GN&C) FLIGHT SOFTWARE IMPLEMENTATION AND VERIFICATION, ISS MULTIBODY FLEXIBLE DYNAMICS AND CONTROL ANALYSIS, AND ISS TIME DOMAIN SIMULATION TOOLS DEVELOPMENT. TO SUPPORT ISS MISSION READINESS, INTEGRATED GN&C SYSTEM SHALL BE SIMULATED AND TRADE STUDIES SHALL BE CONDUCTED TO VERIFY PERFORMANCE AND OPERATIONAL REQUIREMENTS FOR ALL ISS CONFIGURATIONS AND FLIGHT PHASES THROUGHOUT DESIGN ANALYSIS CYCLES (DAC) AND VERIFICATION ANALYSIS CYCLES (VAC). TO SUPPORT NASA EXPLORATION PROGRAMS, INTEGRATED GN&C SYSTEM SHALL BE SIMULATED AND TRADE STUDIES SHALL BE CONDUCTED TO CERIFY PERFORMANCE AND OPERATIONAL REQUIREMENTS FOR ALL FLIGHT PHASES AND CONFIGURATIONS FROM DESIGN ANALYSIS CYCLES (DAC) AND VERIFICATION ANALYSIS CYCLES (VAC). THE CONTRACTOR SHALL USE THE STATION ORBITER MULTI-FLEX BODY ANALYSIS TOOL (SOMBAT) NONLINEAR TIME DOMAIN SIMULATION SOFTWARE TO PERFORM CONTROL STRUCTURE INTERACTION ANALYSIS FOR THE REMAINING ISS ASSEMBLY STAGES AND OPERATIONS. THE GN&C OPERATIONS TO BE ANALYZED SHALL INCLUDE ATTITUDE HOLD, ATTITUDE MANEUVER, REBOOST, ROBOTIC OPERATIONS, AND SHUTTLE PROXIMITY OPERATIONS. THE CONTRACTOR SHALL PERFORM FLIGHT VERICATION ANALYSIS(VAC) OF THE INTERNATIONAL SPACE STATION GN&C SYSTEM TO DETERMINE GN&C FLIGHT READINESS FOR EACH ASSEMBLY FLIGHT. THE CONTRACTOR SHALL USE THE SOMBAT NONLINEAR TIME DOMAIN SIMULATION SOFTWARE TO PERFORM CONTROL STRUCTURE INTERACTION ANALYSIS FOR THE EXPLORATION VEHICLE OPERATION. ANALYSIS OF EXPLORATION VEHICLE OPERATIONS SHALL INCLUDE LAUNCH, ASCENT, ON-ORBIT, DOCKING, DESCENT, AND LANDING EVENTS. THE CONTRACTOR SHALL PERFORM DESIGN AND FLIGHT VERIFICATION ANALYSES TO SUPPORT THE EXPLORATION PROGRAM. THE CONTRACTOR SHALL ANALYZE THE PERFORMANCE OF THE INTERNATIONAL SPACE STATION GN&C SYSTEM DURING SHUTTLE REMOTE MANIPULATOR SUBSYSTEM (SRMS) AND SPACE STATION REMOTE MANIPULATOR SUBSYSTEM (SSRMS) OPERATIONS FOR APPLICABLE INTERNATIONAL SPACE STATION ASSEMBLY STAGES. THE ANALYSIS SHALL INCLUDE PAYLOAD MANEUVERING AND HAND-OFF OPERATIONS BY ROBOTIC SYSTEMS.
  • $487,980 - Wednesday the 17th of February 2016
    Department Of Army
    W6QK ACC ORLANDO
    LABOR - FEA AND COURSEWARE DEVELOPMENT
  • $397,496 - Monday the 9th of June 2014
    Department Of Army
    W6QK ACC-APG CONT CT SW SECTOR
    MARS LABOR - OPTION YEAR 2
  • $3,000 - Tuesday the 29th of March 2016
    Department Of Army
    W6QM MICC-FT GORDON
    (NON PERSONAL) PERSONNEL SERVICES

© Copyright 2019
The Collier Report
published by 1918 Media LLC.
Information displayed in this dossier has been provided through available open source or public sources. No reliance should be made by readers or Collier Report subscribers. Funding actions are complicated and do not always represent dollar-for-dollar payments to vendors nor do they represent payments in certain instances. Requests for the modification of displayed information may be made to help.desk@1918.media.