The Collier Report of U.S. Government Contracting

Old School Reporting Using Modern Technology

Advanced Solutions Group Llc

  • Advanced Solutions Group Llc

  • View government funding actions
  • Kaysville, UT 840379586
  • Phone: 801-444-0029
  • Estimated Number of Employees: 20
  • Estimated Annual Receipts: $8,000,000
  • Business Start Date: 2000
  • Contact Person: Denise Mitchell
  • Contact Phone: 801-444-0029
  • Contact Email: denise@asgperforms.com
  • Business Structure:
  • Partnership or Limited Liability Partnership
  • Business Type:
  • Minority Owned Business
  • Self Certified Small Disadvantaged Business
  • For Profit Organization
  • Economically Disadvantaged Women Small Owned Business
  • Woman Owned Small Business
  • Woman Owned Business
  • Other That One of the Proceeding
  • Limited Liability f
  • Industries Served: Water Supply and Irrigation Systems, Sewage Treatment Facilities, Steam and Air-Conditioning Supply, New Single-Family Housing Construction (except For-Sale Builders), New Multifamily Housing Construction (except For-Sale Builders), New Housing For-Sale Builders, Residential Remodelers, Industrial Building Construction, Commercial and Institutional Building Construction, Water and Sewer Line and Related Structures Construction, Oil and Gas Pipeline and Related Structures Construction, Highway, Street, and Bridge Construction, Poured Concrete Foundation and Structure Contractors, Structural Steel and Precast Concrete Contractors, Framing Contractors, Masonry Contractors, Construction
  • Product Areas: R&D- ENVIRONMENTAL PROTECTION: WATER POLLUTION (BASIC RESEARCH), WATER POLLUTION (BASIC), R&D-WATER POLLUTION-A RES/EXPL DEV, R&D- ENVIRONMENTAL PROTECTION: WATER POLLUTION (APPLIED RESEARCH/EXPLORATORY DEVELOPMENT), WATER POLLUTION (ADVANCED), R&D- ENVIRONMENTAL PROTECTION: WATER POLLUTION (ADVANCED DEVELOPMENT), WATER POLLUTION (ENGINEERING), R&D- ENVIRONMENTAL PROTECTION: WATER POLLUTION (ENGINEERING DEVELOPMENT), WATER POLLUTION (OPERATIONAL), R&D- ENVIRONMENTAL PROTECTION: WATER POLLUTION (OPERATIONAL SYSTEMS DEVELOPMENT), R&D-WATER POLLUTION-MGMT SUP, R&D- ENVIRONMENTAL PROTECTION: WATER POLLUTION (MANAGEMENT/SUPPORT), R&D-WATER POLLUTION-COMERCLIZ, R&D- ENVIRONMENTAL PROTECTION: WATER POLLUTION (COMMERCIALIZED)

Sampling of Federal Government Funding Actions/Set Asides

In order by amount of set aside monies.

  • $95,639 - Thursday the 12th of January 2012
    Internal Revenue Service
    DEPT OF TREAS/INTERNAL REVENUE SERVICE
    GROUNDS MAINTENANCE SERVICES
  • $950,000 - Saturday the 31st of March 2012
    Department Of Army
    W075 ENDIST SACRAMENTO
    RUN POWER TO AREA 10 IGLOOS AND INSTALL RAMP WITH LIGHTNING PROTECTION SYSTEM, DESERET CHEMICAL DEPOT, UTAH.
  • $8,899 - Thursday the 20th of September 2012
    US Fish And Wildlife Service
    CONTRACTING AND GENERAL SERVICES DIV
    REPLACE SHOP/GARAGE - LEADVILLE NFH
  • $802,000 - Friday the 16th of November 2012
    National Park Service
    DSC CONTRACTING SERVICES DIVISION
    GRTE-083219 GRAND TETONS NATIONAL PARK - REHABILITATE MOOSE MAINTENANCE FACILITY - SETTLEMENT OF REQUESTS FOR EQUITABLE ADJUSTMENT ON PROJECT.
  • $7,487 - Tuesday the 27th of March 2012
    Department Of Army
    W0MM TOOELE ARMY DEPOT
    RENOVATION OF BUILDING 1201
  • $7,200 - Friday the 16th of November 2012
    National Park Service
    DSC CONTRACTING SERVICES DIVISION
    GRTE 083219 MOOSE MAINT HVAC VALVE
  • $613,892 - Monday the 4th of June 2012
    US Fish And Wildlife Service
    CONTRACTING AND GENERAL SERVICES DIV
    REPLACE SHOP/GARAGE - LEADVILLE NFH
  • $49,100 - Monday the 30th of July 2012
    Department Of Army
    W075 ENDIST SACRAMENTO
    CONTRACT FOR MDA MISSILE STORAGE, RUN POWER TO AREA 10 IGLOOS, UNLOADING RAMP WITH LIGHTNING PROTECTING SYSTEM AT DESERET CHEMICAL DEPOT, TOOELE, UTAH. THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE R1/VC001 DESIGN MODIFICATIONS AND R2/VC002 TEMPERATURE AND HUMIDITY SENSORS.
  • $420,255 - Tuesday the 13th of November 2012
    National Park Service
    DSC CONTRACTING SERVICES DIVISION
    ADDITIONAL WORK ADDED TO CONTRACT THE 'REHABILITATE ADMINISTRATIVE OFFICE BULDING TO PROVIDE HEADQUARTERS AND GTA OFFICE SPACE' CONSTRUCTION PROJECT AT GRAND TETON NATIONAL PARK, WYOMING, GRTE 164574
  • $320,000 - Wednesday the 29th of August 2012
    National Park Service
    DSC CONTRACTING SERVICES DIVISION
    RECOVERY DINO PMIS 021511 SETTLEMENT OF CONSTRUCTION REQUEST FOR EQUITABLE ADJUSTMENTS - CONTRACT CHANGES (PANELS AND QVC AUDIO/VISUAL SYSTEM)FOR THE 'REPLACE CONDEMNED PORTIONS OF THE QUARRY VISITOR CENTER' PROJECT, DINOSAUR NATIONAL MONUMENT, UINTAH COUNTY, UTAH

© Copyright 2019
The Collier Report
published by 1918 Media LLC.
Information displayed in this dossier has been provided through available open source or public sources. No reliance should be made by readers or Collier Report subscribers. Funding actions are complicated and do not always represent dollar-for-dollar payments to vendors nor do they represent payments in certain instances. Requests for the modification of displayed information may be made to help.desk@1918.media.