The Collier Report of U.S. Government Contracting

Old School Reporting Using Modern Technology

Absl Power Solutions Inc

  • Contact Person: Shawn Doherty
  • Contact Phone: 720-438-4818
  • Contact Email: shawn.doherty@enersys.com
  • Business Structure:
  • Corporate Entity (Not Tax Exempt)
  • Business Type:
  • For Profit Organization
  • Manufacturer of Goods
  • Industries Served: Storage Battery Manufacturing, Primary Battery Manufacturing, All Other Miscellaneous Electrical Equipment and Component Manufacturing, Other Guided Missile and Space Vehicle Parts and Auxiliary Equipment Manufacturing
  • Product Areas: PIPE, TUBE AND RIGID TUBING, NUTS AND WASHERS, PLATE, SHEET, STRIP, FOIL, AND LEAF, STRUCTURAL SHAPES, NONFERROUS BASE METAL, STRUCTURAL SHAPES NONFERROUS METAL, PLATE, SHEET, STRIP, FOIL, AND WIRE: PRECIOUS METAL, PLATE,SHEET,STRIP & WIRE-PREC METAL

Sampling of Federal Government Funding Actions/Set Asides

In order by amount of set aside monies.

  • $879,286 - Friday the 24th of August 2012
    National Aeronautics And Space Administration
    GODDARD SPACE FLIGHT CENTER
    MAGNETOSPHERIC MULTISCALE (MMS) PROJECT BATTERIES
  • $450,288 - Wednesday the 14th of December 2011
    National Aeronautics And Space Administration
    GODDARD SPACE FLIGHT CENTER
    MAGNETOSPHERIC MULTISCALE (MMS) PROJECT BATTERIES
  • $289,685 - Friday the 10th of July 2015
    National Aeronautics And Space Administration
    GODDARD SPACE FLIGHT CENTER
    THE GLOBAL PRECIPITATION MEASUREMENT (GPM) MISSION IS A JOINT MISSION BETWEEN THE U.S. NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) AND THE JAPAN AEROSPACE EXPLORATION AGENCY (JAXA). THE GPM OBSERVATORY IS SCHEDULED TO BE LAUNCHED FROM TANEGASHIMA, JAPAN BY A JAXA H-IIA EXPENDABLE LAUNCH VEHICLE. GPM WILL HAVE A DESIGN MISSION LIFE OF 3 YEARS FOLLOWING THE NOMINAL 60 DAYS COMMISSIONING PHASE (5 YEARS GOAL) AT A 407 KM ALTITUDE AND A 65 INCLINATION ORBIT, 93 MINUTE ORBIT WITH 36 MINUTE MAXIMUM ECLIPSE THIS EFFORT IS FOR THE DESIGN, DEVELOPMENT, FABRICATION, AND DELIVERY OF THE GPM LITHIUM-ION BATTERY ASSEMBLY, FROM HERE ON REFERRED TO AS THE BATTERY.

© Copyright 2019
The Collier Report
published by 1918 Media LLC.
Information displayed in this dossier has been provided through available open source or public sources. No reliance should be made by readers or Collier Report subscribers. Funding actions are complicated and do not always represent dollar-for-dollar payments to vendors nor do they represent payments in certain instances. Requests for the modification of displayed information may be made to help.desk@1918.media.