The Collier Report of U.S. Government Contracting

Old School Reporting Using Modern Technology

Oboyle Enterprises Inc dba Custom Machine Shop

  • Contact Person: Peter Oboyle
  • Contact Phone: 301-739-4606
  • Contact Email: p.oboyle@customcncmachine.com
  • Business Structure:
  • Corporate Entity (Not Tax Exempt)
  • Business Type:
  • For Profit Organization
  • Manufacturer of Goods
  • Industries Served: Hardware Manufacturing, Machine Shops, Precision Turned Product Manufacturing, Bolt, Nut, Screw, Rivet, and Washer Manufacturing, Fluid Power Valve and Hose Fitting Manufacturing, Special Die and Tool, Die Set, Jig, and Fixture Manufacturing, Other Aircraft Parts and Auxiliary Equipment Manufacturing, Surgical and Medical Instrument Manufacturing, Dental Equipment and Supplies Manufacturing, All Other Miscellaneous Manufacturing
  • Product Areas: SOCIAL- SOCIAL REHABILITATION, SOCIAL REHABILITATION SERVICES

Sampling of Federal Government Funding Actions/Set Asides

In order by amount of set aside monies.

  • $5,477 - Friday the 10th of July 2015
    National Aeronautics And Space Administration
    GODDARD SPACE FLIGHT CENTER
    CALL 8 COMPREHENSIVE FABRICATION NEEDS FOR SPACEFLIGHT HARDWARE PARTS, INSTRUMENT COMPONENTS, STRUCTURES, FIXTURES, ASSEMBLY TOOLS, SPACE VEHICLE PARTS, ETC.; ASSEMBLY OF FABRICATED ITEMS AND ALL REQUIRED DOCUMENTATION. THE CONTRACTOR SHALL MANUFACTURE, ASSEMBLE, AND PREPARE DOCUMENTATION FOR SPACEFLIGHT AND NON-FLIGHT PARTS IN SUPPORT OF THE MANUFACTURING ENGINEERING GROUP AND GSFC PROJECTS. THE CONTRACTOR SHALL PROVIDE THE REQUIRED PERSONNEL, FACILITIES, AND MATERIALS, UNLESS OTHERWISE PROVIDED BY THE GOVERNMENT, TO ACCOMPLISH THE ISSUED DELIVERY ORDERS. THE CONTRACTOR SHALL PROVIDE EMERGENCY REPAIR OR MODIFICATION IN SUPPORT OF REJECTED OR DEFECTIVE CRITICAL ITEMS; THIS INCLUDES PERFORMING REPAIR OR MODIFICATION AND RETURNING TO GSFC WITHIN A NEGOTIATED TIME FRAME PER DELIVERY ORDER. THE CONTRACTOR SHALL FACILITATE TECHNICAL INTERCHANGE MEETINGS AT THE CONTRACTOR S FABRICATION FACILITY FOR DESIGN INTERPRETATION FOR WORK IN PROGRESS AND CONTRACTOR/END-USER COLLABORATION FOR CRITICAL ITEMS WITHIN A NEGOTIATED TIME FRAME PER DELIVERY ORDER. CRITICAL ITEMS ARE DEFINED AS THOSE SPACEFLIGHT AND GROUND SUPPORT ITEMS HAVING A SIGNIFICANT IMPACT ON TEST SCHEDULES, ASSEMBLY SCHEDULES, OR SHIPPING SCHEDULES AFFECTING LAUNCH SCHEDULES. APPROXIMATELY 40% OF THE WORK TO BE PERFORMED ON THIS CONTRACT WILL BE CONSIDERED CRITICAL.
  • $2,575 - Friday the 10th of July 2015
    National Aeronautics And Space Administration
    GODDARD SPACE FLIGHT CENTER
    COMPREHENSIVE FABRICATION NEEDS FOR SPACEFLIGHT HARDWARE PARTS, INSTRUMENT COMPONENTS, STRUCTURES, FIXTURES, ASSEMBLY TOOLS, SPACE VEHICLE PARTS, ETC.; ASSEMBLY OF FABRICATED ITEMS AND ALL REQUIRED DOCUMENTATION. THE CONTRACTOR SHALL MANUFACTURE, ASSEMBLE, AND PREPARE DOCUMENTATION FOR SPACEFLIGHT AND NON-FLIGHT PARTS IN SUPPORT OF THE MANUFACTURING ENGINEERING GROUP AND GSFC PROJECTS. THE CONTRACTOR SHALL PROVIDE THE REQUIRED PERSONNEL, FACILITIES, AND MATERIALS, UNLESS OTHERWISE PROVIDED BY THE GOVERNMENT, TO ACCOMPLISH THE ISSUED DELIVERY ORDERS. THE CONTRACTOR SHALL PROVIDE EMERGENCY REPAIR OR MODIFICATION IN SUPPORT OF REJECTED OR DEFECTIVE CRITICAL ITEMS; THIS INCLUDES PERFORMING REPAIR OR MODIFICATION AND RETURNING TO GSFC WITHIN A NEGOTIATED TIME FRAME PER DELIVERY ORDER. THE CONTRACTOR SHALL FACILITATE TECHNICAL INTERCHANGE MEETINGS AT THE CONTRACTOR S FABRICATION FACILITY FOR DESIGN INTERPRETATION FOR WORK IN PROGRESS AND CONTRACTOR/END-USER COLLABORATION FOR CRITICAL ITEMS WITHIN A NEGOTIATED TIME FRAME PER DELIVERY ORDER. CRITICAL ITEMS ARE DEFINED AS THOSE SPACEFLIGHT AND GROUND SUPPORT ITEMS HAVING A SIGNIFICANT IMPACT ON TEST SCHEDULES, ASSEMBLY SCHEDULES, OR SHIPPING SCHEDULES AFFECTING LAUNCH SCHEDULES. APPROXIMATELY 40% OF THE WORK TO BE PERFORMED ON THIS CONTRACT WILL BE CONSIDERED CRITICAL.
  • $1,929 - Friday the 10th of July 2015
    National Aeronautics And Space Administration
    GODDARD SPACE FLIGHT CENTER
    COMPREHENSIVE FABRICATION NEEDS FOR SPACEFLIGHT HARDWARE PARTS, INSTRUMENT COMPONENTS, STRUCTURES, FIXTURES, ASSEMBLY TOOLS, SPACE VEHICLE PARTS, ETC.; ASSEMBLY OF FABRICATED ITEMS AND ALL REQUIRED DOCUMENTATION. THE CONTRACTOR SHALL MANUFACTURE, ASSEMBLE, AND PREPARE DOCUMENTATION FOR SPACEFLIGHT AND NON-FLIGHT PARTS IN SUPPORT OF THE MANUFACTURING ENGINEERING GROUP AND GSFC PROJECTS. THE CONTRACTOR SHALL PROVIDE THE REQUIRED PERSONNEL, FACILITIES, AND MATERIALS, UNLESS OTHERWISE PROVIDED BY THE GOVERNMENT, TO ACCOMPLISH THE ISSUED DELIVERY ORDERS. THE CONTRACTOR SHALL PROVIDE EMERGENCY REPAIR OR MODIFICATION IN SUPPORT OF REJECTED OR DEFECTIVE CRITICAL ITEMS; THIS INCLUDES PERFORMING REPAIR OR MODIFICATION AND RETURNING TO GSFC WITHIN A NEGOTIATED TIME FRAME PER DELIVERY ORDER. THE CONTRACTOR SHALL FACILITATE TECHNICAL INTERCHANGE MEETINGS AT THE CONTRACTOR S FABRICATION FACILITY FOR DESIGN INTERPRETATION FOR WORK IN PROGRESS AND CONTRACTOR/END-USER COLLABORATION FOR CRITICAL ITEMS WITHIN A NEGOTIATED TIME FRAME PER DELIVERY ORDER. CRITICAL ITEMS ARE DEFINED AS THOSE SPACEFLIGHT AND GROUND SUPPORT ITEMS HAVING A SIGNIFICANT IMPACT ON TEST SCHEDULES, ASSEMBLY SCHEDULES, OR SHIPPING SCHEDULES AFFECTING LAUNCH SCHEDULES. APPROXIMATELY 40% OF THE WORK TO BE PERFORMED ON THIS CONTRACT WILL BE CONSIDERED CRITICAL.

© Copyright 2019
The Collier Report
published by 1918 Media LLC.
Information displayed in this dossier has been provided through available open source or public sources. No reliance should be made by readers or Collier Report subscribers. Funding actions are complicated and do not always represent dollar-for-dollar payments to vendors nor do they represent payments in certain instances. Requests for the modification of displayed information may be made to help.desk@1918.media.