The Collier Report of U.S. Government Contracting

Old School Reporting Using Modern Technology

Kiewit Building Group Inc

  • Kiewit Building Group Inc

  • View government funding actions
  • Omaha, NE 681313302
  • Phone: 402-977-5106
  • Estimated Number of Employees: 24,700
  • Estimated Annual Receipts: $9,311,666,667
  • Business Start Date: 2005
  • Contact Person: Randall Zuke
  • Contact Phone: 720-274-5939
  • Contact Email: randy.zuke@kiewit.com
  • Business Structure:
  • Corporate Entity (Not Tax Exempt)
  • Business Type:
  • For Profit Organization
  • Industries Served: New Multifamily Housing Construction (except For-Sale Builders), Industrial Building Construction, Commercial and Institutional Building Construction, Water and Sewer Line and Related Structures Construction, Oil and Gas Pipeline and Related Structures Construction, Power and Communication Line and Related Structures Construction, Highway, Street, and Bridge Construction, Other Heavy and Civil Engineering Construction, Framing Contractors, Masonry Contractors, Other Foundation, Structure, and Building Exterior Contractors, Electrical Contractors and Other Wiring Installation Contractors, Drywall and Insulation Contractors, Finish Carpentry Contractors, Other Building Finishing Contractors, Site Preparation Contractors, Construction
  • Product Areas: NURSING SERVICES, MEDICAL- NURSING

Sampling of Federal Government Funding Actions/Set Asides

In order by amount of set aside monies.

  • $69,112 - Tuesday the 15th of October 2013
    Department Of Army
    W076 ENDIST TULSA
    ALL WORK UNLESS LISTED SEPARATELY
  • $66,422 - Thursday the 10th of May 2012
    Department Of Army
    W2SN ENDIST ALASKA
    CONSTRUCT BARRACKS WITHIN 5' LINE - CASE 6, ENHANCED TURF ESTABLISHMENT. PROVIDE MAINTENANCE OF TURF THROUGHOUT THE ESTABLISHMENT PERIOD AS REQUIRED PER REVISED SPECIFICATIONS, ATTACHED.
  • $62,634 - Thursday the 3rd of May 2012
    Department Of Navy
    NAVFAC ENGINEERING COMMAND HAWAII
    CONSTRUCT FITNESS CENTER, NAVAL BASE PH - THIS MOD IS INCLUDE A WASHER/DRYER, OUTLETS AND SIGN SELECTION.
  • $62,267 - Wednesday the 23rd of May 2012
    Department Of Navy
    NAVFAC ENGINEERING COMMAND HAWAII
    FY09 MCON FITNESS CENTER - THIS MOD IS ISSUED TO MODIFY THE DESIGN AND CONSTRUCTION OF THE FRONT DESK RECEPTION CENTER AND ADDITIONAL OFFICE SPACES ON THE SECOND FLOOR.
  • $61,893 - Thursday the 8th of March 2012
    Department Of Army
    W2SN ENDIST ALASKA
    RAILHEAD OPS FAC PH II - CASE 15-2, STATIC AIR PRESSURE, PART 2, FINAL. THIS IS A PART 2, FINAL OF A TWO PART MODIFICATION. SEE MODIFICATION P00015, PART 1, NTP, DATED OCTOBER 13, 2011 SIGNED BY MR. FREDERICK WIEDMAIER, ADMINISTRATIVE CONTRACTING OFFICER, IN THE AMOUNT OF $20,000.00 THIS PART 2, FINAL IS BEING ISSUED IN THE AMOUNT OF $61,893.00 FOR A TOTAL NEGOTIATED AMOUNT OF $81,893.00 FOR CHANGE ITEM 15. THE SCOPE OF WORK REMAINS AS GIVEN IN P00015.
  • $53,805,300 - Thursday the 7th of June 2012
    Department Of Army
    W2SN ENDIST ALASKA
    CONSTRUCTION OF A STANDARD DESIGN BRIGADE COMBAT TEAM (BCT) LIGHT COMPLEX, PHASE 1A, 480-SPACE BARRACKS AT JOINT BASE ELMENDORF-RICHARDSON (JBER), ALASKA
  • $509 - Thursday the 27th of February 2014
    Public Buildings Service
    GSA/PUBLIC BUILDINGS SERVICE
    (NE0036ZZ) USMS MAFTF - 2ND FLOOR BUILD OUT RNE00070 HRUSKA COURTHOUSE 118 S. 18TH PLAZA OMAHA, NE GS-06P-11-GY-D-0023/GS-P-06-11-GY-5032/PS01 PER THE SCOPE OF WORK ATTACHED (SIGNED ON 11/1/11) AND HEREBY INCORPORATED, KEIWIT BUILDING GROUP, MODIFICATION PS01 IS ISSUED TO INCORPORATE THE FOLLOWING SCOPE OF WORK: INSTALL OCCUPANCY SENSOR (FOR THE SET OF LIGHTS CURRENTLY ONLY CONTROLLED BY A SWITCH) WITHIN THE SQUAD ROOM/RECEPTION AREA. PLACE OCCUPANCY SENSOR IN THE LOCATION CHOSEN DURING THE WALK THROUGH WITH THE GSA.
  • $4,753 - Friday the 28th of September 2012
    Department Of Army
    W2SN ENDIST ALASKA
    CONSTRUCT BARRACKS, CHANGE ITEM NO. 1 (HAZARDOUS MATERIALS)
  • $4,516 - Thursday the 8th of March 2012
    Department Of Army
    W2SN ENDIST ALASKA
    RAILHEAD OPS FAC PH II - CASE 16, ADDITIONAL DEMO OF RAIL LOADING RAMP. DEMO AND REMOVAL OF ADDITIONAL CONCRETE AT TRAINER GATE RAILHEAD LOADING RAMP.
  • $40,558 - Friday the 3rd of August 2012
    Department Of Navy
    NAVFAC ENGINEERING COMMAND HAWAII
    CONSTRUCT FITNESS CENTER, NAVAL BASE PH - THIS MOD ADJUSTS CATHODIC PROTECTION LINE; ADDS DOOR ALARM EQUIPMENT AND WIRING; AND, ADDS 3 CABLE AND POWER OUTLETS TO SUPPORT TELEVISIONS.

© Copyright 2019
The Collier Report
published by 1918 Media LLC.
Information displayed in this dossier has been provided through available open source or public sources. No reliance should be made by readers or Collier Report subscribers. Funding actions are complicated and do not always represent dollar-for-dollar payments to vendors nor do they represent payments in certain instances. Requests for the modification of displayed information may be made to help.desk@1918.media.